8.20 MEASUREMENTS AND PAYMENT COMPUTATIONS
8.21 ASPHALT BINDER
Megagrams (tons) of asphalt binder paid for is not deducted from megagrams (tons) of HMA mixture measured for payment. When payment for HMA mixture is based on square meters (square yards), no separate payment is made for asphalt binder. The contractor includes cost of asphalt binder as part of cost per unit area.
Asphalt binder will be measured for payment by tank stick measurement or calibrated meter reading. Asphalt binder supplier weigh tickets for liters (gallons) of asphalt binder delivered to the plant site are not acceptable for pay quantity, but the asphalt binder quantity added to the storage tank shall be computed from a supplier certified transport ticket accompanying each load. Use of supplier certified transport tickets makes it unnecessary for the contractor to have a second asphalt binder storage tank on site for sticking asphalt binder deliveries or for the transports to weigh at a nearby scale before and after delivery.
Under the certified plant inspection program, the plant monitor will observe tank stick measurements on the first day of mix production and a minimum of once per week thereafter. When a flow meter is used for measuring the quantity, the plant monitor will observe a 4-hour tank measurement and compare the outage to the 4-hour metered quantity.
When small quantities, normally 45 Mg (50 tons) or less, of asphalt binder are involved, design plan may state that asphalt binder is considered incidental to HMA. Check bid item subnotes for this reference.
For specific mixes used as patching materials, or in an alternate bid situation, no payment will be made for asphalt binder. Examples include surface patches, partial depth patches, full depth patches, and detour pavement.
Tank Measurement and
Asphalt Binder Content Determination
For continuous plants, drum mixing plants, or batch plants where asphalt binder is proportioned
through a calibrated metering pump, certified plant inspectors measure the asphalt binder for payment.
This shall be done by daily initial and final tank stick measurement or meter readings, and computing
asphalt binder added to the storage tank during the day from certified supplier transport tickets.
At batch plants, automatic or semi-automatic printouts record actual weight of asphalt binder in each separate batch, this quantity may be used for payment.
Volume measurements will be converted to weights by computation. The amount in storage at beginning of project will be measured or estimated by inspector and added to amount measured for payment. Asphalt binder remaining in storage at end of project and amount otherwise not used in the work will be measured or estimated by inspector and deducted from amount measured for payment.
Refer to Materials I.M. 509 for correct procedures in tank stick measurement and asphalt binder determination. "Daily Virgin AC Tank Measurement Sheet” (Forms E216 and M216) is to be used by plant inspector to compute final net asphalt binder pay quantity and percent asphalt binder by tank stick.
Any corrections should be reported to contractor and recorded on daily report forms. Upon project completion, the completed "Daily Virgin AC Tank Measurement Sheet” (Forms E216 and M216) shall be incorporated in project file.
Measuring Asphalt Binder for Small
Quantities
By mutual agreement, the method of measuring asphalt binder for payment may be modified when small
quantities or intermittent operations are involved.
If a recorded weight is not available, quantity may be calculated from intended asphalt binder percent with HMA plant meter results providing further verification. For small quantities on a given day, the previous day's tank stick may be used as a check.
Project inspector should document procedure selected and reasons for doing so.
Asphalt Binder Quantities and
Pay Adjustments
Asphalt binder contract quantities for a project are estimated based on a basic asphalt binder
content for mixture size and type. Target asphalt binder percentage to be used is then set by job
mix formula. Where it is anticipated that quantity of asphalt binder used will result in a substantial
change as defined in Construction Manual 2.36, a change order shall
be written prior to accomplishing the work. Project engineer is responsible for checking asphalt binder
percentage established by job mix and initiating the change order.
When noncomplying Dynamic Shear Rheometer (DSR) Stiffness tests occur, payment for asphalt binder incorporated into affected HMA mixture is subject to price adjustment per the provisions of Construction Manual 2.53. Also, refer to this section for the guide schedule for adjustment in HMA mixture payment for deviation in asphalt binder content from specified tolerance.
8.22 TARGET VALUES FOR ASPHALT BINDER CONTENT IN JOB MIXES
The previous paragraph applies specifically to asphalt binder content, but specification and definitions also apply to aggregate tolerance and target values. Refer to Materials I.M. 508.
8.23 WEIGHING OF HMA MATERIALS
When witnessing is required, scale inspector should be positioned near contractor's scale operator so weighing can be closely observed. Contractor's representative shall write the scale tickets and present them individually to scale inspectors for their signatures or initials before each truck leaves the plant.
Inspection personnel should refer to Construction Manual 3.50 and Materials I.M. 508 for witnessing and verification requirements and inspector duties.