Section 2534. Delivery of Samples.
2534.01 DESCRIPTION.
This item covers the delivery of project samples for testing purposes. It applies to
Interstate and Primary projects for which certified plant inspection is required or
authorized. These provisions shall not apply to Non-Primary projects for which certified
plant inspection is required or authorized, unless indicated in the contract documents.
2534.02 SAMPLE DELIVERY.
The Contractor shall deliver to the Engineer samples for the purposes of acceptance,
monitoring, and verification testing. Materials shall include aggregates and asphalt
mixtures and may include samples of other materials. The samples shall be properly
identified. Delivery shall be to the District Materials Laboratory for the District
having jurisdiction over the contract, unless otherwise directed by the Engineer. The
Contractor shall deliver the samples promptly, as determined by the Engineer.
2534.03 SAMPLE RECEIVING.
Samples received by the District Materials Engineer will be promptly tested. Materials
for projects with accelerated work schedules will be given special consideration.
Not all samples are to be tested. The selection of samples to be tested will be made by the District Materials Engineer, based on Construction Office and Materials Office instructions. Samples initially identified for testing will normally be tested at least by the end of the working day following delivery. These test results will be available to the Contractor as soon as testing is completed.
2534.04 METHOD OF MEASUREMENT AND BASIS OF PAYMENT.
Preparing, identifying, and delivering samples will not be measured for payment and will
be considered incidental to the cost for samples of the appropriate item.