Section 2010. Clearing, Excavation, and Embankment

Part 1 - General.
1.01 SECTION INCLUDES.
1.02 DESCRIPTION OF WORK.
1.03 SUBMITTALS.
1.04 SUBSTITUTIONS.
1.05 DELIVERY, STORAGE AND HANDLING.
1.06 SCHEDULING AND CONFLICTS.
1.07 SPECIAL REQUIREMENTS.
1.08 MEASUREMENT FOR PAYMENT.

Part 2 - Products.
2.01 CLEARING AND GRUBBING.
2.02 ON-SITE TOPSOIL.
2.03 EXCAVATION MATERIALS.
2.04 EMBANKMENT MATERIALS.
2.05 COMPACTION EQUIPMENT.
2.06 DUST CONTROL.

Part 3 - Execution.
3.01 PREPARATION BY THE CONTRACTOR.
3.02 CLEARING AND GRUBBING.
3.03 STRIPPING, SALVAGING, AND SPREADING TOPSOIL.
3.04 EXCAVATION.
3.05 EMBANKMENT CONSTRUCTION.
3.06 UNSUITABLE SOILS.
3.07 SUBGRADE PREPARATION.
3.08 SUBGRADE TREATMENT.
3.09 GRANULAR SUBBASE (CLASS A, B, C & D).
3.10 FIELD QUALITY CONTROL.
3.11 FIXTURE ADJUSTMENT.
3.12 TEMPORARY EROSION CONTROL DURING CONSTRUCTION.
3.13 DUST CONTROL.
3.14 PAVEMENT REPLACEMENT.

FIGURES.
2010.1A DETAILS OF EMBANKMENT AND REBUILDING EMBANKMENTS.

2010.1B DETAILS OF EMBANKMENT (ALLOWABLE PLACEMENT OF UNSUITABLE MATERIAL).

2010.2 ROADWAY EARTHWORK.

2010.3 SOILS MEASUREMENT AND RECORDING DEVICES.