Section 3020. Trenchless Construction

Part 1 - General.
1.01 SECTION INCLUDES.
1.02 DESCRIPTION OF WORK.
1.03 SUBMITTALS.
1.04 SUBSTITUTIONS.
1.05 DELIVERY, STORAGE, AND HANDLING.
1.06 SCHEDULING AND CONFLICTS.
1.07 SPECIAL REQUIREMENTS.
1.08 MEASUREMENT FOR PAYMENT.

Part 2 - Products.
2.01 CARRIER PIPE.
2.02 CASING PIPE.
2.03 CASING SPACERS.
2.04 BACKFILL FOR ABANDONED TUNNELS.
2.05 CASING END SEAL.

Part 3 - Execution.
3.01 PREPARATION.
3.02 EXCAVATION.
3.03 SHEETING, SHORING, AND BRACING.
3.04 DEWATERING.
3.05 TRENCHLESS INSTALLATION.
3.06 FIELD QUALITY CONTROL.  

FIGURES.
NONE