DETERMINATION OF BINDER CONTENT

BY CALCULATION FROM Gmm

 

 

Project No.

 

Sample ID.

 

County

 

Test No.

 

Contractor

 

Date

 

Mix Type

 

Mix Design #

 

 

CALCULATION OF Gse

 

Pb

(Measurement from tank stick or meter)

1)

__.__ __

Gb

 

2)

__.__ __ __

Ps

(100 - line 1)

3)

__.__ __ __

Pb / Gb

(line 1 / line 2)

4)

__.__ __ __

 

        (sample 1 + sample 2 + sample 3)

 

 

Avg. Gmm=

(                 +                 +               ) =

5)

__.__ __ __

3

100 / Avg. Gmm

(100 / line 5) …………(vol. of mixture) .

6)

__ __.__ __ __

Vol. Mixture - Asph. Vol.

(line 6 - line 4)

7)

__ __.__ __ __

Gse

(line 3 / line 7)

8)

__.__ __ __

 

 

 

 

CALCULATION OF Pb

 

 

 

 

Gmm

(from individual Gmm test)

9)

__.__ __ __

Gse x Gb

(line 8 x line 2)

10)

__.__ __ __

Gmm x Gb

(line 9 x line 2)

11)

__.__ __ __

Gse x Gmm

(line 8 x line 9)

12)

__.__ __ __

Gse x Gb - Gmm x Gb

(line 10 - line 11)

13)

__.__ __ __

Gse x Gmm - Gmm x Gb

(line 12 - line 11)

14)

__.__ __ __

line 13 / line 14

 

15)

__.__ __ __

Pb by calculation

(100 x line 15).

16)

__.__