Section 2304. Detour Pavement
Furnish and place a PCC or HMA surface to carry traffic during construction of permanent pavement.
Use PCC or HMA for the detour pavement. Meet the following requirements.
1. Meet the requirements of Section 2301 for Class A PCC Pavement. Use Class 2 durability coarse aggregate, or better, as defined in Article 4115.04.
2. For median crossovers, meet the requirements of Section 2301 for Class C PCC Pavement. Use Class 3 durability coarse aggregate, or better, as defined in Article 4115.04.
Design a mixture per Materials I.M. 510 for the following:
1. For detour pavement carrying less than 10,000,000
total 20 year ESALs, use HMA 1,000,000 ESAL surface or intermediate course, 1/2
inch or 3/4 inch, with PG 64-22 asphalt binder. For detour pavements or median crossovers on interstates
and multi-lane primary highways, use a 10,000,000 ESAL surface or intermediate
mixture, with PG 64-22 asphalt binder. The surface lift requires L-4 friction
aggregate.
2. For detour pavement carrying more than 10,000,000
total 20 year ESALs, use HMA 10,000,000 ESAL surface or intermediate course,
3/4 inch, with PG 64-22 asphalt binder. For detour pavements on all other primary highways, use a 3,000,000
ESAL surface or intermediate mixture with a PG 64-22 asphalt binder.
3. For median crossovers, use HMA 10,000,000 ESAL
surface or intermediate course, 3/4 inch, with PG 64-22 asphalt binder. Apply compaction
per Section 2303. The surface lift requires L-4 friction aggregate.
For detour pavements on non-primary projects
use a 1,000,000 ESAL surface or intermediate mixture with a PG 64-22 asphalt
binder.
Earthwork quantities are based on the PCC option and will not be adjusted for additional HMA depth. Additional cut material may be used as earth shoulder construction.
1. Meet the requirements of Section 2301. Transverse joints, center tie bars, and sealing of the center longitudinal joint are not required.
2. Do not apply Article 2301.03, H, 4, b, unless stated otherwise in the contract documents.
3. Apply Article 2316.02, A, 7.
Meet the requirements
of Section Article 2303.03,
E.
2304.04 method of measurement.
Detour Pavement constructed, in square yards, will be the quantity shown in the contract documents.
A. Payment for Detour Pavement will be the contract unit price per square yard.
B. Payment is full compensation for furnishing material, equipment, and labor to construct the detour pavement in accordance with the contract documents.
C. Payment for detour pavement removal will be according to Section 2510.