Sampling & Testing Guide-Minimum Frequency |
|||||||||||||||||
April 19, 2016 |
ASPHALT MIXTURES |
Matls. IM 204 |
|||||||||||||||
Supersedes April 15, 2014 |
Appendix F (US) Units |
||||||||||||||||
MATERIAL OR CONSTRUCTION ITEM |
TESTS |
METHOD OF ACCEPTANCE & RELATED IMs |
QUALITY CONTROL |
INDEPENDENT ASSURANCE,& VERIFICATION S&T |
REMARKS
|
||||||||||||
SAMPLE BY |
FREQ. |
SAMPLE SIZE |
TEST BY |
REPORT |
S&T TYPE |
SAMPLE BY |
FREQ. |
SAMPLE SIZE |
TEST BY |
REPORT |
|
||||||
SOURCE INSPECTION |
|||||||||||||||||
Aggregates-Coarse (4127) |
|
AS 209
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
Aggregates-Fine (4127) |
|
AS 209 |
|
|
|
|
|
|
|
|
|
|
|
|
|||
Hydrated Lime (4127) |
|
AS 491.04 |
|
|
|
|
|
|
|
|
|
|
|
|
|||
Asphalt Binder |
|
AS 437 |
|
|
|
|
|
|
|
|
|
|
|
|
|||
Emulsions & Cutbacks |
|
AS 437 |
|
|
|
|
|
|
|
|
|
|
|
|
|||
Release Agent |
|
AS 491.15
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
Recycled Asphalt Shingles |
|
AS 506
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
PLANT INSPECTION |
|||||||||||||||||
Aggregates (2303) |
Quality |
|
|
|
|
|
|
V |
DME |
1/20,000 Ton |
50 lb. |
CTRL |
|
|
|||
Combined Aggregate (4127) |
Gradation |
RCE/ CONTR |
1/lot |
CONTR |
|
V
IA |
RCE/ CONTR
|
Sample 1/day, Test 1st day + 20% Systems Approach* |
|
DME/ RCE |
|
|
|||||
|
Moisture
|
|
CONTR |
1 / half day |
1000 gm |
CONTR |
|
|
|
|
|
|
|
Drum Mix Plants Only |
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|||
NOTE: RCE/CONTR indicates that the Contractor shall assist in the sampling at the direction of and witnessed by the Project Engineer. |
|||||||||||||||||
Sampling & Testing Guide-Minimum Frequency |
||||||||||||||||||||||||||
April 19, 2016 |
ASPHALT MIXTURES |
Matls. IM 204 |
||||||||||||||||||||||||
Supersedes April 15, 2014 |
Appendix F (US) Units |
|||||||||||||||||||||||||
MATERIAL OR CONSTRUCTION ITEM
|
TESTS |
METHOD OF ACCEPTANCE & RELATED IMs |
QUALITY CONTROL |
INDEPENDENT ASSURANCE,& VERIFICATION S&T |
REMARKS
|
|||||||||||||||||||||
SAMPLE BY |
FREQ. |
SAMPLE SIZE |
TEST BY |
REPORT |
S&T TYPE |
SAMPLE BY |
FREQ. |
SAMPLE SIZE |
TEST BY |
REPORT |
|
|||||||||||||||
PLANT INSPECTION |
||||||||||||||||||||||||||
Asphalt Binder |
DSR
Quality |
AS Cert |
|
|
|
|
|
V
V IA |
RCE/ CONTR
DME |
Sample 1/day Test 1st 1/week
1/20,000 T of Mix Systems Approach |
4 oz tin
1 qt |
DME
CTRL |
|
Log all shipments
|
||||||||||||
Cutback |
|
AS Cert |
|
|
|
|
|
|
|
|
|
|
|
Log all shipments |
||||||||||||
Emulsion |
Residue |
AS 360 |
|
|
|
|
|
V |
RCE |
1/project |
1 qt |
DME |
|
Plastic bottle required |
||||||||||||
GRADE INSPECTION |
||||||||||||||||||||||||||
Uncompacted Mixture: |
Lab Density & Lab Voids |
|
RCE/ CONTR |
As per 2303 |
40 lb |
CONTR |
|
V
IA |
RCE/ CONTR |
As per 2303 Test 1/day Systems Approach |
40 lb |
DME |
|
|
||||||||||||
|
Moisture Sensitivity |
|
|
|
|
|
|
V |
RCE/ CONTR |
Test 1st Sample at 500 tons then sample 1/10,000 tons per 2303 until 1st sample accepted (test as needed) |
70 lb |
CTRL |
|
|
||||||||||||
Compacted Mixture |
Mat Density, Thickness & Voids |
|
|
|
|
|
V
IA |
RCE/ CONTR DME |
Lot
1 lot/project* |
Min 8/lot
|
RCE
DME |
|
|
|||||||||||||
Joint Density |
SS-15004 |
|
|
|
|
|
V |
RCE/ CONTR |
Lot |
3/lot |
RCE |
|
6-inch core |
|||||||||||||
|
Smoothness |
CONTR |
100% |
100% |
CONTR |
|
V |
DME |
10% |
|
DME |
|
|
|||||||||||||