Division 7 Table of Contents

 

Section 7010 - Portland Cement Concrete Pavement

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, Handling, and Salvaging

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

2.02      Concrete Mixes

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Pavement Construction

 

3.03      Curb and Gutter Construction

 

3.04      Pavement Protection

 

3.05      Use of Pavement

 

3.06      Transportation Restrictions

 

3.07      Quality Control

 

Figures

 

7010.101           Joints

 

7010.102           PCC Curb Details

 

7010.103           Manhole Boxouts in PCC Pavement

 

7010.104           Ramped Median Nose

 

7010.121           Jointing PCC Pavement Widening

 

7010.901           PCC Pavement Jointing

 

7010.902           PCC Pavement Widening

 

7010.903           PCC Railroad Crossing Approach

 

7010.904           Typical Jointing Layout

 

7010.905           PCC Cul-de-sac Joint Locations

 

7010.906           Medians

 

Section 7011 - Portland Cement Concrete Overlays

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, Handling, and Salvaging

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

2.02      Concrete Mixes

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Construction

 

3.03      Curb and Gutter Construction

 

3.04      Pavement Protection

 

3.05      Use of Pavement

 

3.06      Transportation Restrictions

 

3.07      Quality Control

 

Section 7020 - Hot Mix Asphalt Pavement

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, Handling, and Salvaging

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      HMA Materials

 

2.02      Warm Mix Asphalt Materials

 

2.03      Recycled Asphalt Materials

 

2.04      Subgrade and Subbase

 

Part 3 - Execution

 

3.01      HMA Pavement

 

3.02      Base Widening

 

3.03      Protection from Traffic

 

3.04      Defects or Deficiencies

 

3.05      Pavement Smoothness

 

3.06      Quality Control

 

3.07      Removal of Pavement

 

Figures

 

7020.201           Manhole Boxouts in HMA Pavement and HMA Overlays

 

7020.901           HMA Pavement

 

7020.902           HMA Railroad Crossing Approach

 

7020.903           Details for Asphalt Paving

 

Section 7021 - Hot Mix Asphalt Overlays

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, Handling, and Salvaging

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      HMA Overlay Materials

 

2.02      Warm Mix Asphalt Materials

 

2.03      Recycled Asphalt Materials

 

2.04      Binder Grades

 

2.05      High Performance Thin Lift

 

2.06      Nominal Aggregate Size for Asphalt Overlays

 

Part 3 - Execution

 

3.01      HMA Overlay

 

3.02      Protection from Traffic

 

3.03      Defects or Deficiencies

 

3.04      Pavement Smoothness

 

3.05      Quality Control

 

3.06      Removal of Pavement

 

Figures

 

7021.101           Details for Asphalt Resurfacing

 

Section 7030 - Sidewalks, Shared Use Paths, and Driveways

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Portland Cement Concrete

 

2.02      Hot Mix Asphalt

 

2.03      Bricks/Pavers

 

2.04      Setting Bed for Bricks/Pavers

 

2.05      Neoprene Modified Asphalt Adhesive for Bricks/Pavers

 

2.06      Brick/Paver Joint Filler

 

2.07      Detectable Warnings

 

2.08      Granular Driveway Surfacing

 

2.09      Isolation and Expansion Joint Sealant

 

Part 3 - Execution

 

3.01      Removals

 

3.02      Subgrade Preparation

 

3.03      Adjustment of Fixtures

 

3.04      PCC Sidewalks, Shared Use Paths, and Driveways

 

3.05      HMA Shared Use Paths and Driveways

 

3.06      Brick/Paver Sidewalks with a Pavement Base

 

3.07      Detectable Warning Installation

 

3.08      Slope and Smoothness Testing

 

3.09      Granular Driveway Surfacing

 

3.10      Cleaning

 

3.11      Material Testing

 

3.12      Sidewalk and Curb Ramp Compliance

 

Figures

 

7030.101           Concrete Driveway, Type A

 

7030.102           Concrete Driveway, Type B

 

7030.103           Driveway Grading

 

7030.104           Right-of-way Grading

 

7030.201           Classes of Sidewalks

 

7030.202           Curb Details for Class A Sidewalk

 

7030.203           Brick/Paver Sidewalk

 

7030.204           General Features of an Accessible Sidewalk

 

7030.205           General Sidewalk and Curb Ramp Details

 

7030.206           Curb Ramps Outside of Intersection Radius

 

7030.207           Curb Ramp for Class B or C Sidewalk

 

7030.208           Alternative Curb Ramp for Class B or C Sidewalk

 

7030.209           Curb Ramps for Class A Sidewalk

 

7030.210           Detectable Warning Placement

 

Section 7040 - Pavement Rehabilitation

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05        Delivery, Storage, Handling, and Salvaging

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

Part 3 - Execution

 

3.01      General

 

3.02      Full Depth Patching

 

3.03      Partial Depth Patching

 

3.04      Diamond Grinding

 

3.05      Milling

 

3.06      Crack and Joint Cleaning and Filling, Hot Pour

 

3.07      Crack Cleaning and Filling, Emulsion

 

3.08      Pavement Removal

 

3.09      Curb and Gutter Removal

 

3.10      Dowel Bar Retrofit

 

3.11      Core Hole Cutting and Replacement

 

Figures

 

7040.101           Full Depth PCC Patches Less Than or Equal to 15’ Long

 

7040.102           Full Depth PCC Patches Greater Than 15’ Long

 

7040.103           Full Depth HMA Patches

 

7040.104           Partial Depth Patches

 

7040.105           Flowable Mortar Cutoff Wall

 

7040.106           Dowel Bar Retrofit

 

7040.107           Utility Core Hole Repair

 

Section 7050 - Asphalt Stabilization

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Re-shaping Ditches

 

3.03      Prepare / Place Base Material

 

3.04      Surface Fixture Adjustment

 

3.05      Application and Mixing of Asphalt Emulsion

 

3.06      Grade and Compact Material

 

3.07      Surface Treatment

 

Section 7060 - Bituminous Seal Coat

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Surface Preparation

 

3.03      Heating Bituminous Material

 

3.04      Spreading Bituminous Material

 

3.05      Rolling

 

3.06      Two Course Seal Coats

 

3.07      Clean Up

 

Section 7070 - Emulsified Asphalt Slurry Seal

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

2.02      Composition of the Slurry Mix

 

2.03      Mix Design

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Surface Preparation

 

3.03      Applying Slurry Material

 

3.04      Slurry Leveling

 

3.05      Limitations

 

3.06      Curing and Opening to Traffic

 

Section 7080 - Permeable Interlocking Pavers

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Engineering Fabric

 

2.02      Underdrain

 

2.03      Aggregate

 

2.04      Permeable Interlocking Pavers

 

2.05      PCC Edge Restraint

 

Part 3 - Execution

 

3.01      Pre-Installation Protection

 

3.02      Subgrade Preparation for Permeable Interlocking Pavers

 

3.03      Engineering Fabric

 

3.04      Underdrain

 

3.05      Storage Aggregate

 

3.06      Filter Aggregate

 

3.07      Bedding Aggregate

 

3.08      Installing PCC Edge Restraint

 

3.09      Installing Interlocking Permeable Paver System

 

3.10      Quality Control

 

3.11      Protection of Pavement

 

Figures

 

7080.101           Permeable Interlocking Pavers

 

7080.102           Typical Alley with Permeable Pavers

 

Section 7090 - Cold-in-Place Pavement Recycling

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

2.02      Job Mix Formula

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Preparation

 

3.03      Utilities

 

3.04      Control Strip

 

3.05      Milling the Pavement

 

3.06      Recycling Agent Application

 

3.07      Recycling Additives

 

3.08      Compaction

 

3.09      Secondary Compaction

 

3.10      Smoothness

 

3.11      Surface Course

 

3.12      Quality Control

 

Section 7091 - Full Depth Reclamation

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

2.02      Job Mix Formula

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Preparation

 

3.03      Utilities

 

3.04      Control Strip

 

3.05      Pulverizing

 

3.06      Removal of Excess Material

 

3.07      Stabilizing Agent Application

 

3.08      Stabilizing Additives

 

3.09      Compaction

 

3.10      Curing

 

3.11      Microcracking

 

3.12      Interlayer

 

Section 7092 - Crack and Seat Existing PCC Pavement

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

 

Part 2 - Products

 

2.01      Materials

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Preparation

 

3.03      Full Depth Saw Cuts

 

3.04      Partial Depth Patches

 

3.05      Intake Adjustment, Major

 

3.06      Test Section

 

3.07      Cracking

 

3.08      Seating

 

3.09      Milling

 

3.10      Removal of Material

 

3.11      Joint Control Fabric

 

Figures

 

7092.101           Overlay with Crack and Seat