Division 7 Table of Contents
Section 7010 - Portland Cement Concrete Pavement
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, Handling, and Salvaging
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
2.02 Concrete Mixes
2.03 PCC Overlays
Part 3 - Execution
3.01 Equipment
3.02 Pavement Construction
3.03 Curb and Gutter Construction
3.04 Overlay Construction
3.05 Pavement Protection
3.06 Use of Pavement
3.07 Transportation Restrictions
3.08 Quality Control
Figures
7010.101 Joints
7010.102 PCC Curb Details
7010.103 Manhole Boxouts in PCC Pavement
7010.104 Ramped Median Nose
7010.901 PCC Pavement Jointing
7010.902 PCC Pavement Widening
7010.903 PCC Railroad Crossing Approach
7010.904 Typical Jointing Layout
7010.905 PCC Cul-de-sac Joint Locations
7010.906 Medians
Section 7020 - Hot Mix Asphalt Pavement
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, Handling, and Salvaging
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 HMA Materials
2.02 Warm Mix Asphalt Materials
2.03 Recycled Asphalt Materials
2.04 Subgrade and Subbase
Part 3 - Execution
3.01 HMA Pavement
3.02 Base Widening
3.03 Protection from Traffic
3.04 Defects or Deficiencies
3.05 Pavement Smoothness
3.06 Quality Control
3.07 Removal of Pavement
Figures
7020.201 Manhole Boxouts in HMA Pavement and HMA Overlays
7020.901 HMA Pavement
7020.902 HMA Railroad Crossing Approach
7020.903 Details for Asphalt Resurfacing
Section 7030 - Sidewalks, Shared Use Paths, and Driveways
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Portland Cement Concrete
2.02 Hot Mix Asphalt
2.03 Brick Pavers
2.04 HMA Setting Bed for Brick
2.05 Neoprene Modified Asphalt Adhesive for Brick
2.06 Brick Joint Filler
2.07 Detectable Warnings
2.08 Granular Driveway Surfacing
Part 3 - Execution
3.01 Removals
3.02 Subgrade Preparation
3.03 Adjustment of Fixtures
3.04 PCC Sidewalks, Shared Use Paths, and Driveways
3.05 HMA Shared Use Paths and Driveways
3.06 Brick Sidewalks
3.07 Detectable Warning Installation
3.08 Tolerances for Shared Use Paths and Driveways
3.09 Granular Driveway Surfacing
3.10 Cleaning
3.11 Testing
3.12 Sidewalk and Curb Ramp Compliance
Figures
7030.101 Concrete Driveway, Type A
7030.102 Concrete Driveway, Type B
7030.103 Driveway Grading
7030.104 Right-of-way Grading
7030.201 Classes of Sidewalks
7030.202 Curb Details for Class A Sidewalk
7030.203 Brick Sidewalk
7030.204 General Features of an Accessible Sidewalk
7030.205 General Sidewalk and Curb Ramp Details
7030.206 Curb Ramps Outside of Intersection Radius
7030.207 Curb Ramp for Class B or C Sidewalk
7030.208 Alternative Curb Ramp for Class B or C Sidewalk
7030.209 Curb Ramps for Class A Sidewalk
7030.210 Detectable Warning Placement
Section 7040 - Pavement Rehabilitation
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, Handling, and Salvaging
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
Part 3 - Execution
3.01 General
3.02 Full Depth Patching
3.03 Partial Depth Patching
3.04 Diamond Grinding
3.05 Milling
3.06 Crack and Joint Cleaning and Filling, Hot Pour
3.07 Crack Cleaning and Filling, Emulsion
3.08 Pavement Removal
3.09 Curb and Gutter Removal
Figures
7040.101 Full Depth PCC Patches Less Than or Equal to15’ Long
7040.102 Full Depth PCC Patches Greater Than 15’ Long
7040.103 Full Depth HMA Patches
7040.104 Partial Depth Patches
7040.105 Flowable Mortar Cutoffwall
Section 7050 - Asphalt Stabilization
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
Part 3 - Execution
3.01 Equipment
3.02 Re-shaping Ditches
3.03 Prepare / Place Base Material
3.04 Surface Fixture Adjustment
3.05 Application and Mixing of Asphalt Emulsion
3.06 Grade and Compact Material
3.07 Surface Treatment
Section 7060 - Bituminous Seal Coat
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
Part 3 - Execution
3.01 Equipment
3.02 Surface Preparation
3.03 Heating Bituminous Material
3.04 Spreading Bituminous Material
3.05 Rolling
3.06 Two Course Seal Coats
3.07 Clean Up
Section 7070 - Emulsified Asphalt Slurry Seal
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
2.02 Composition of the Slurry Mix
2.03 Mix Design
Part 3 - Execution
3.01 Equipment
3.02 Surface Preparation
3.03 Applying Slurry Material
3.04 Slurry Leveling
3.05 Limitations
3.06 Curing and Opening to Traffic