Sampling and Testing Guide-Minimum Frequency
October 20, 2015 CONCRETE BRIDGE FLOOR REPAIR & OVERLAY & SURFACING Matls. IM 204Supersedes October 15, 2013 Section 2413 Appendix M
|
|||||||||||||||
MATERIAL OR CONSTRUCTION ITEM
|
TESTS |
METHOD OF ACCEPTANCE & RELATED IMs |
QUALITY CONTROL |
INDEPENDENT ASSURANCE& VERIFICATION S&T |
REMARKS
|
||||||||||
SAMPLE BY |
FREQ. |
SAMPLE SIZE |
TEST BY |
REPORT |
S&T TYPE |
SAMPLE BY |
FREQ. |
SAMPLE SIZE |
TEST BY |
REPORT |
|
||||
SOURCE INSPECTION |
|||||||||||||||
Aggregates-Fine (4110) |
|
AS 209
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Aggregates-Coarse (4115) |
|
AS 209 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Portland Cement (4101) |
Quality |
AS 401 |
|
|
|
|
|
|
|
|
|
|
|
|
|
GGBFS (Ground Granulated Blast Furnace Slag) |
Quality |
AS 491.14 |
|
|
|
|
|
|
|
|
|
|
|
For HPC-O |
|
Fly Ash (4108) |
Quality
|
AS 491.17 |
|
|
|
|
|
|
|
|
|
|
|
For HPC-O |
|
Mixing Water (4102) |
Quality |
Lab Tested |
|
|
|
|
|
V |
RCE |
1/source |
1 qt. |
CTRL |
|
Not needed for potable Municipal Water |
|
Air Entraining Admixture (4103) |
Quality
|
AS 403 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Water Reducing Admixture (4103) |
Quality
|
AS 403
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Retarding Admixture (4103) |
|
AS 403 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Curing Compound (4105) |
Lab Tested |
|
|
|
|
|
V |
DME |
1/batch |
1 pt |
CTRL |
|
Sample lots not previously reported |
||
PLANT INSPECTION |
|||||||||||||||
Aggregate-Fine (4110) |
Gradation |
AS Cert |
CONTR |
|
CONTR |
|
|
RCE
|
1/project |
20 lb |
RCE |
|
When ready mixed concrete is used |
||
Aggregate-Coarse (4115) |
Quality
|
AS Cert |
|
|
|
|
|
V |
DME |
1/project |
50 lb |
CTRL |
|
DME may adjust frequency |
|
Gradation |
|
CONTR |
|
CONTR |
|
V |
RCE |
1/project |
20 lb |
RCE |
|
When ready mixed concrete is used |
|||
Portland Cement (4101) |
Quality |
AS Cert |
|
|
|
|
|
V |
DME |
1/project |
15 lb |
CTRL |
|
|
|
Sampling and Testing Guide-Minimum Frequency
October 20, 2015 CONCRETE BRIDGE FLOOR REPAIR & OVERLAY & SURFACING Matls. IM 204Supersedes October 15, 2013 Section 2413 Appendix M
|
|||||||||||||||
MATERIAL OR CONSTRUCTION ITEM
|
TESTS |
METHOD OF ACCEPTANCE & RELATED IMs |
QUALITY CONTROL |
INDEPENDENT ASSURANCE& VERIFICATION S&T |
REMARKS
|
||||||||||
SAMPLE BY |
FREQ. |
SAMPLE SIZE |
TEST BY |
REPORT |
S&T TYPE |
SAMPLE BY |
FREQ. |
SAMPLE SIZE |
TEST BY |
REPORT |
|
||||
PLANT INSPECTION (cont) |
|||||||||||||||
GGBFS(Ground Granulated Blast Furnace Slag) |
Quality |
AS Cert |
|
Each Load |
|
|
|
|
|
|
|
|
|
For HPC-O |
|
Fly Ash |
Quality |
AS Cert |
|
Each Load |
|
|
|
|
|
|
|
|
|
For HPC-O |
|
Air Entraining Admixture (4103) |
|
AS 403 |
|
|
|
|
|
V |
DME |
1/project |
1 pt |
CTRL |
|
Sample if not previously reported |
|
Water Reducing Admixture (4103) |
|
AS 403 |
|
|
|
|
|
V |
DME |
1/project |
1 pt |
CTRL |
|
Sample if not previously reported |
|
Retarding Admixture (4103) |
|
AS 403 |
|
|
|
|
|
V |
DME |
1/project |
1 pt |
CTRL |
|
Sample if not previously reported |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sampling and Testing Guide-Minimum Frequency
October 20, 2015 CONCRETE BRIDGE FLOOR REPAIR & OVERLAY & SURFACING Matls. IM 204Supersedes October 15, 2013 Section 2413 Appendix M
|
|||||||||||||||
MATERIAL OR CONSTRUCTION ITEM
|
TESTS |
METHOD OF ACCEPTANCE & RELATED IMs |
QUALITY CONTROL |
INDEPENDENT ASSURANCE& VERIFICATION S&T |
REMARKS
|
||||||||||
SAMPLE BY |
FREQ. |
SAMPLE SIZE |
TEST BY |
REPORT |
S&T TYPE |
SAMPLE BY |
FREQ. |
SAMPLE SIZE |
TEST BY |
REPORT |
|
||||
GRADE INSPECTION |
|||||||||||||||
Plastic Concrete (2413) |
Air |
|
|
|
|
|
V |
RCE |
1/100 sy(2) |
|
RCE |
|
1/ 30yd3 for ready mix, min 1/day |
||
Slump |
|
|
|
|
|
V |
RCE |
1/100 sy(2) |
|
RCE |
|
1/ 30yd3 for ready mix, min 1/day |
|||
Density |
|
|
|
|
|
V |
RCE |
See Note |
|
RCE |
|
For Class O PCC only.(1) |
|||
Thickness |
|
|
|
|
|
|
|
RCE |
3/50 sy |
|
RCE |
|
|
||
Cylinders |
|
|
|
|
|
|
V |
DME |
3/project |
|
DME |
|
Primary Projects only (Information Only) |
||
Concrete Sealer (2413.03, G) |
Quality |
AS 491.12 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Hardened Concrete |
Smooth-ness
|
CONTR |
100% |
|
CONTR |
|
V |
DME |
10% |
|
DME |
|
|
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(1) Nuclear density testing frequency for each placement shall be one test within 5 feet of the beginning and end of the placement and additional tests shall be equally spaced a maximum of 100 feet throughout the length of the placement. Each placement shall have a minimum of three nuclear density tests.
(2) For
Class O on
daily pours of more than 300 square yards, the minimum frequency will be 1 test
per 100 square yards for the first 300 square yards, then 1 test for every 300
square yards for the remainder of the day’s pour.