Guidelines for DME FOR waiving MATERIAL from

the final materials review

 

MATERIAL

UNITS

MAXIMUM QUANTITY BY ITEM

Aggregate

Tons

200

Asphalt, Cutback

Gal.

100

Asphalt, Emulsified

Gal.

100

Asphalt, Hot Mix

Tons

50

Aprons: RCP or CMP

Ea.

4

Base Repair: HMA or PCC

S.Y.

100

Conduit

Ft.

50

Culvert Pipe: RCP, CMP or PE

Ft.

30

Delineators

Ea.

10

Delineator Posts

Ea.

10

Dowel Baskets, Epoxy Coated

Ea.

10

Fabric Engineering, Erosion Control

S.Y.

100

Fabric Engineering, Silt Fence

Ft.

100

Iron Casting, Manhole Covers, Etc.

Ea.

1

Joint Filler, Preformed

Ft.

100

Lighting Material, Ground Rods

Ea.

2

Lighting Material, Wire/Cable

Ft.

250

Paint, Bridge

Sq.Ft.

250

Pavement

S.Y.

100

Pavement Markings

Sta.

25

Pipe, Rodent Guard for CMP

Ea.

5

Pipe, Rodent Guard for P.E. Pipe

Ea.

5

Seed, Fertilizer/Mulch

Acres

1

Signing Materials, Finished Sign

Sq. Ft.

20

Signing Materials, Wood Posts

Ft.

50

Steel Reinforcement, Plain, Epoxy Coated, Stainless

Lbs.

500

Structural Concrete

C.Y.

25

Subdrain, CMP

Ft.

250

Subdrain, CMP Outlet

Ea.

5

Subdrain, P.E.

Ft.

250

Subdrain, P.E. Outlet

Ea.

5