QUESTIONNAIRE
EVALUATION OF HIGH PERFORMANCE BITUMINOUS PREMIX
1. Producer: Contract No.:
2. Date Received: Location:
3. Condition of material at time of delivery:
A. Quantity Received:
B. Did material contain ice crystals or water? Y N
1) If so, how much? (Circle number 1-5 below.)
Insignificant Amount - 1 2 3 4 5 - Highly Significant Amount
C. Was material contaminated? Y N
1) If so, with what?
a) Dust
b) Limestone
c) Sand
d) Other (Specify):
e) Unknown (Describe):
D. Did material contain lumps? Y N
1) If so, how much? (Circle number 1-5 below.)
Insignificant Amount - 1 2 3 4 5 - Highly Significant Amount
E. Was material fully coated with a shiny black appearance? Y N
1) If not, describe condition.
4. Storage of Material
A. How was material stockpiled?
B. Was stockpile kept covered? Y N
1) If yes, how?
C. Did a hard crust form on the stockpile? Y N
1) If yes, how thick was the crust?
D. Did material change appearance? (For example, change from shiny black to dull brown?)
Y N
1) If yes, describe change in appearance.
E. How long was material in stockpile before use?
5. Performance of Material
A. Was material usable in cold weather? Y N
1) Approximately, in what temperature range was it used?
B. Did material stick in patch area? Y N
1) Was patch area wet or dry?
C. Did material stay put under traffic? Y N
1) If not, did material:
a) Track bituminous oil
b) Crumble and scatter
c) “Pop out” of patch in large chunks
d) Deform or move
D. Was material heated or warmed prior to use? Y N
1) If yes, how?
E. Overall performance rating (Circle number 1-5 below.)
Very Poor Poor Average Good Excellent
1 2 3 4 5
F. Comments