PCC NON-STRUCTURAL & MISCELLANEOUS - FIELD AND PLANT SAMPLING AND TESTING GUIDE (See Specifications for Complete Details.) |
||||
|
|
Field Acceptance |
Plant Acceptance |
|
Article |
Work Type |
Air & Slump |
Gradation QC |
Gradation Verification |
|
NON-STRUCTURAL |
|
|
|
Base Repair |
1/30 yd3 (1) |
S/T 1st week, S/T 1 per month (3) |
S/T 1/project (3) |
|
PCC Base |
1/700 yd3: 1/100 yd3 RM |
S/T 1st week, S/T 1 per month (3) |
S/T 1/project (3) |
|
Base Widening |
1/700 yd3: 1/100 yd3 RM |
S/T 1st week, S/T 1 per month (3) |
S/T 1/project (3) |
|
Curtain Wall |
1/30 yd3 |
n/a |
n/a |
|
Revetment Grout |
Air -1/half day |
S/T for Mix Design only |
n/a |
|
|
Slope Protection |
Air -1/day |
n/a |
n/a |
|
Fabric Formed Revetment |
Air- 1/half day |
S/T for Mix Design only |
n/a |
Sidewalks |
1/100 yd3 (1) |
S/T 1st week, S/T 1 per month (3) |
S/T 1/project (3) |
|
Trails |
1/100 yd3 |
S/T 1st week, S/T 1 per month (3) |
S/T 1/project (3) |
|
Curb & Gutter |
1/100 yd3 (1) |
S/T 1st week, S/T 1 per month (3) |
S/T 1/project (3) |
|
Driveways |
1/100 yd3 (1) |
S/T 1st week, S/T 1 per month (3) |
S/T 1/project (3) |
|
Railroad Approach Sections |
1/100 yd3 (1) |
S/T 1st week, S/T 1 per month (3) |
S/T 1/project (3) |
|
Patching (Full depth), rumble strip |
1/30 yd3 (1) |
S/T 1st week, S/T 1 per month (3) |
S/T 1/project (3) |
|
Patching (Partial depth) |
1/30 yd3 (1) |
S/T 1st week, S/T 1 per month (3) |
S/T 1/project (3) |
|
|
MISCELLANEOUS |
|
|
|
Detour Pavement, 3 yrs or less |
n/a |
n/a |
n/a |
|
seal course |
n/a |
n/a |
n/a |
|
Pipe collars |
n/a |
n/a |
n/a |
|
Catch basins, abandonment,collars |
n/a |
n/a |
n/a |
|
Flowable Mortar |
n/a |
S/T for Mix Design only |
n/a |
|
Fence construction |
n/a |
n/a |
n/a |
|
Type A and B |
n/a |
n/a |
n/a |
|
Thrust blocks |
n/a |
n/a |
n/a |
|
(1) If less than 20 yd3/ day, the engineer may waive air testing if inspection is not available and producer has exhibited consistency in prior placements. Test minimum of 1/day for concrete exposed to freezing and thawing. (3) Sampling and testing rate if no other concrete supplied. Use structural or paving test results to cover non-structural concrete items. Any concrete items not listed are considered miscellaneous concrete. |