PRINCIPAL FACTORS IN QUALITY CONTROL
Apply this IM appendix for both LRFD and LX beams.
1. Management Commitment to Quality
a. All producers shall develop a statement describing their commitment to quality.
2. Safety-Management Commitment to Safety
a. Safety Policy
b. Safety Program
c. Designated Safety Officer
d. Compliance with applicable laws, rules, regulations and ordinances governing safety.
3. Qualified personnel for all stages of fabrication (See requirements of Section 2407.01.)
4. Testing and inspection of the various materials selected for use
5. Clear & complete shop drawings
6. Accurate stressing procedures
a. Calculation procedures
b. A prescribed stressing procedure repeated every time the bed is used
c. Description of tensioning equipment and stressing beds
d. Checking for line and grade
7. Control of dimensions and tolerances
8. Positioning of all embedded items
9. Proportioning and adequate mixing of concrete
a. List of all approved mix designs & applications
b. Description of mixing units, including manufacturer’s recommended capacity
c. Procedures for producing concrete of uniform quality batch after batch
d. Description of maintenance and up-keep procedures
10. Handling, placing and consolidation of concrete
a. Description of consolidation method (number and type of vibrators, consolidation zones)
b. Number of lifts during placement and placement procedures
c. Cold and hot weather concrete placement procedures
d. Timeliness of placement
e. Delivery (hauling and handling) methods
f. Finishing methods
g. Procedures to avoid cold joints in concrete placement
11. Curing
a. Procedures and equipment used to cure the concrete
b. Procedures used when artificial heat is used in curing
c. Equipment used to monitor curing temperatures
d. Corrective action (methods & procedures)
e. Form removal
12. Accurate detentioning procedure
a. Single strand detentioning procedure (if used)
b. Multiple strand detentioning procedure (if used)
c. Draped strands detentioning procedure (if used)
13. Final finish, storing and transporting units
a. Procedure for preparing and finishing facia girders
b. Final finishing procedures
c. Maintenance and upkeep of dunnage
d. Overhang, tie down and protection procedures
e. Notification for final inspection and approval
14. Record keeping
a. Timeliness of documentation
b. Samples of records kept
c. Samples of forms used
d. Availability of records and documentations
15. Problem resolution procedures
16. Repair procedure
a. Minor repair
b. Structural repair