Division 5 Table of Contents
Section 5010 - Pipe and Fittings
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Water Main
2.02 Bolts for Water Main and Fittings
2.03 Fittings
2.04 Concrete Thrust Blocks
2.05 Pipeline Accessories
2.06 Special Gaskets
2.07 Water Service Pipe and Appurtenances
2.08 Non-shrink Grout
2.09 Casing Pipe
Part 3 - Execution
3.01 Pipe Installation
3.02 Additional Requirements for DIP Installation
3.03 Additional Requirements for PVC Pipe Installation
3.04 Polyethylene Encasement Installation
3.05 Tracer System Installation
3.06 Conflicts
3.07 Transitions in Piping Systems
3.08 Structure Penetrations
3.09 Water Service Stub
3.10 Water Main Abandonment
3.11 Water Main Removal
3.12 Testing and Disinfection
Figures
5010.101 Thrust Blocks
5010.102 Tracer System
5010.901 Minimum Clearance Between Water Service and Structure
Section 5011 - Fusible PVC and HDPE Pipe
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Water Main
Part 3 - Execution
3.01 Additional Requirements for Fusible Pipe Installation
3.02 Testing and Disinfection
Section 5020 - Valves, Fire Hydrants, and Appurtenances
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Valves
2.02 Fire Hydrant Assembly
2.03 Appurtenances
Part 3 - Execution
3.01 General
3.02 Flushing Device (Blowoff)
3.03 Fire Hydrant
3.04 Adjustment of Existing Valve Box or Fire Hydrant
Figures
5020.201 Fire Hydrant Assembly
Section 5030 - Testing and Disinfection
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Disinfection Agent - Chlorine
Part 3 - Execution
3.01 General
3.02 Sequence of Testing and Disinfection
3.03 Initial Flushing
3.04 Pressure and Leak Testing
3.05 Disinfection
3.06 Final Flushing
3.07 Bacteria Sampling
3.08 Re-disinfection
3.09 Putting Water Main in Service