Division 7 Table of Contents
Section 7010 - Portland Cement Concrete Pavement
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, Handling, and Salvaging
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
2.02 Concrete Mixes
Part 3 - Execution
3.01 Equipment
3.02 Pavement Construction
3.03 Curb and Gutter Construction
3.04 Pavement Protection
3.05 Use of Pavement
3.06 Transportation Restrictions
3.07 Quality Control
Figures
7010.101 Joints
7010.102 PCC Curb Details
7010.103 Manhole Boxouts in PCC Pavement
7010.104 Ramped Median Nose
7010.121 Jointing PCC Pavement Widening
7010.901 PCC Pavement Jointing
7010.902 PCC Pavement Widening
7010.903 PCC Railroad Crossing Approach
7010.904 Typical Jointing Layout
7010.905 PCC Cul-de-sac Joint Locations
7010.906 Medians
Section 7011 - Portland Cement Concrete Overlays
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, Handling, and Salvaging
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
2.02 Concrete Mixes
Part 3 - Execution
3.01 Equipment
3.02 Construction
3.03 Curb and Gutter Construction
3.04 Pavement Protection
3.05 Use of Pavement
3.06 Transportation Restrictions
3.07 Quality Control
Section 7020 - Asphalt Pavement
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, Handling, and Salvaging
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Asphalt Materials
2.02 Warm Mix Asphalt Materials
2.03 Recycled Asphalt Materials
2.04 Subgrade and Subbase
Part 3 - Execution
3.01 Asphalt Pavement
3.02 Base Widening
3.03 Protection from Traffic
3.04 Defects or Deficiencies
3.05 Pavement Smoothness
3.06 Quality Control
3.07 Removal of Pavement
Figures
7020.201 Manhole Boxouts in HMA Pavement and HMA Overlays
7020.901 HMA Pavement
7020.902 Asphalt Railroad Crossing Approach
7020.903 Details for Asphalt Paving
Section 7021 - Asphalt Overlays
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, Handling, and Salvaging
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Asphalt Overlay Materials
2.02 Warm Mix Asphalt Materials
2.03 Recycled Asphalt Materials
2.04 Binder Grades
2.05 High Performance Thin Lift
2.06 Nominal Aggregate Size for Asphalt Overlays
Part 3 - Execution
3.01 Asphalt Overlay
3.02 Protection from Traffic
3.03 Defects or Deficiencies
3.04 Pavement Smoothness
3.05 Quality Control
3.06 Removal of Pavement
Figures
7021.101 Details for Asphalt Resurfacing
Section 7030 - Sidewalks, Shared Use Paths, and Driveways
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Portland Cement Concrete
2.02 Asphalt
2.03 Bricks/Pavers
2.04 Setting Bed for Bricks/Pavers
2.05 Neoprene Modified Asphalt Adhesive for Bricks/Pavers
2.06 Brick/Paver Joint Filler
2.07 Detectable Warnings
2.08 Granular Driveway Surfacing
2.09 Isolation and Expansion Joint Sealant
Part 3 - Execution
3.01 Removals
3.02 Subgrade Preparation
3.03 Adjustment of Fixtures
3.04 PCC Sidewalks, Shared Use Paths, and Driveways
3.05 Asphalt Shared Use Paths and Driveways
3.06 Brick/Paver Sidewalks with a Pavement Base
3.07 Detectable Warning Installation
3.08 Slope and Smoothness Testing
3.09 Granular Driveway Surfacing
3.10 Cleaning
3.11 Material Testing
3.12 Sidewalk and Curb Ramp Compliance
Figures
7030.101 Concrete Driveway, Type A
7030.102 Concrete Driveway, Type B
7030.103 Driveway Grading
7030.104 Right-of-way Grading
7030.201 Classes of Sidewalks
7030.202 Curb Details for Class A Sidewalk
7030.203 Brick/Paver Sidewalk
7030.204 General Features of an Accessible Sidewalk
7030.205 General Sidewalk and Curb Ramp Details
7030.206 Curb Ramps Outside of Intersection Radius
7030.207 Curb Ramp for Class B or C Sidewalk
7030.208 Alternative Curb Ramp for Class B or C Sidewalk
7030.209 Curb Ramps for Class A Sidewalk
7030.210 Detectable Warning Placement
Section 7040 - Pavement Rehabilitation
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, Handling, and Salvaging
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
Part 3 - Execution
3.01 General
3.02 Full Depth Patching
3.03 Partial Depth Patching
3.04 Diamond Grinding
3.05 Milling
3.06 Crack and Joint Cleaning and Filling, Hot Pour
3.07 Crack Cleaning and Filling, Emulsion
3.08 Pavement Removal
3.09 Curb and Gutter Removal
3.10 Dowel Bar Retrofit
3.11 Core Hole Cutting and Replacement
Figures
7040.101 Full Depth PCC Patches Less Than or Equal to 15’ Long
7040.102 Full Depth PCC Patches Greater Than 15’ Long
7040.103 Full Depth HMA Patches
7040.104 Partial Depth Patches
7040.105 Flowable Mortar Cutoffwall
7040.106 Dowel Bar Retrofit
7040.107 Utility Core Hole Repair
Section 7050 - Asphalt Stabilization
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
Part 3 - Execution
3.01 Equipment
3.02 Re-shaping Ditches
3.03 Prepare / Place Base Material
3.04 Surface Fixture Adjustment
3.05 Application and Mixing of Asphalt Emulsion
3.06 Grade and Compact Material
3.07 Surface Treatment
Section 7060 - Bituminous Seal Coat
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
Part 3 - Execution
3.01 Equipment
3.02 Surface Preparation
3.03 Heating Bituminous Material
3.04 Spreading Bituminous Material
3.05 Rolling
3.06 Two Course Seal Coats
3.07 Clean Up
Section 7070 - Emulsified Asphalt Slurry Seal
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
2.02 Composition of the Slurry Mix
2.03 Mix Design
Part 3 - Execution
3.01 Equipment
3.02 Surface Preparation
3.03 Applying Slurry Material
3.04 Slurry Leveling
3.05 Limitations
3.06 Curing and Opening to Traffic
Section 7080 - Permeable Interlocking Pavers
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Engineering Fabric
2.02 Underdrain
2.03 Aggregate
2.04 Permeable Interlocking Pavers
2.05 PCC Edge Restraint
Part 3 - Execution
3.01 Pre-Installation Protection
3.02 Subgrade Preparation for Permeable Interlocking Pavers
3.03 Engineering Fabric
3.04 Underdrain
3.05 Storage Aggregate
3.06 Filter Aggregate
3.07 Bedding Aggregate
3.08 Installing PCC Edge Restraint
3.09 Installing Interlocking Permeable Paver System
3.10 Quality Control
3.11 Protection of Pavement
Figures
7080.101 Permeable Interlocking Pavers
7080.102 Typical Alley with Permeable Pavers
Section 7090 - Cold-in-Place Pavement Recycling
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
2.02 Job Mix Formula
Part 3 - Execution
3.01 Equipment
3.02 Preparation
3.03 Utilities
3.04 Control Strip
3.05 Milling the Pavement
3.06 Recycling Agent Application
3.07 Recycling Additives
3.08 Compaction
3.09 Secondary Compaction
3.10 Smoothness
3.11 Surface Course
3.12 Quality Control
Section 7091 - Full Depth Reclamation
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
2.02 Job Mix Formula
Part 3 - Execution
3.01 Equipment
3.02 Preparation
3.03 Utilities
3.04 Control Strip
3.05 Pulverizing
3.06 Removal of Excess Material
3.07 Stabilizing Agent Application
3.08 Stabilizing Additives
3.09 Compaction
3.10 Curing
3.11 Microcracking
3.12 Interlayer
Section 7092 - Crack and Seat Existing PCC Pavement
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
Part 3 - Execution
3.01 Equipment
3.02 Preparation
3.03 Full Depth Saw Cuts
3.04 Partial Depth Patches
3.05 Intake Adjustment, Major
3.06 Test Section
3.07 Cracking
3.08 Seating
3.09 Milling
3.10 Removal of Material
3.11 Joint Control Fabric
Figures
7092.101 Overlay with Crack and Seat