Division 7 Table of Contents

 

Section 7010 - Portland Cement Concrete Pavement

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, Handling, and Salvaging

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

2.02      Concrete Mixes

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Pavement Construction

 

3.03      Curb and Gutter Construction

 

3.04      Pavement Protection

 

3.05      Use of Pavement

 

3.06      Transportation Restrictions

 

3.07      Quality Control

 

Figures

 

7010.101          Joints

 

7010.102          PCC Curb Details

 

7010.103          Manhole Boxouts in PCC Pavement

 

7010.104          Ramped Median Nose

 

7010.121          Jointing PCC Pavement Widening

 

7010.901          PCC Pavement Jointing

 

7010.902          PCC Pavement Widening

 

7010.903          PCC Railroad Crossing Approach

 

7010.904          Typical Jointing Layout

 

7010.905          PCC Cul-de-sac Joint Locations

 

7010.906          Medians

 

Section 7011 - Portland Cement Concrete Overlays

 

      Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, Handling, and Salvaging

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

2.02      Concrete Mixes

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Construction

 

3.03      Curb and Gutter Construction

 

3.04      Pavement Protection

 

3.05      Use of Pavement

 

3.06      Transportation Restrictions

 

3.07      Quality Control

 

Section 7020 - Asphalt Pavement

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, Handling, and Salvaging

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Asphalt Materials

 

2.02      Warm Mix Asphalt Materials

 

2.03      Recycled Asphalt Materials

 

2.04      Subgrade and Subbase

 

Part 3 - Execution

 

3.01      Asphalt Pavement

 

3.02      Base Widening

 

3.03      Protection from Traffic

 

3.04      Defects or Deficiencies

 

3.05      Pavement Smoothness

 

3.06      Quality Control

 

3.07      Removal of Pavement

 

      Figures

 

7020.201          Manhole Boxouts in HMA Pavement and HMA Overlays

 

7020.901          HMA Pavement

 

7020.902          Asphalt Railroad Crossing Approach

 

7020.903          Details for Asphalt Paving

 

Section 7021 - Asphalt Overlays

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, Handling, and Salvaging

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Asphalt Overlay Materials

 

2.02      Warm Mix Asphalt Materials

 

2.03      Recycled Asphalt Materials

 

2.04      Binder Grades

 

2.05      High Performance Thin Lift

 

2.06      Nominal Aggregate Size for Asphalt Overlays

 

Part 3 - Execution

 

3.01      Asphalt Overlay

 

3.02      Protection from Traffic

 

3.03      Defects or Deficiencies

 

3.04      Pavement Smoothness

 

3.05      Quality Control

 

3.06      Removal of Pavement

 

      Figures

 

7021.101          Details for Asphalt Resurfacing

 

Section 7030 - Sidewalks, Shared Use Paths, and Driveways

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Portland Cement Concrete

 

2.02      Asphalt

 

2.03      Bricks/Pavers

 

2.04      Setting Bed for Bricks/Pavers

 

2.05      Neoprene Modified Asphalt Adhesive for Bricks/Pavers

 

2.06      Brick/Paver Joint Filler

 

2.07      Detectable Warnings

 

2.08      Granular Driveway Surfacing

 

2.09      Isolation and Expansion Joint Sealant

 

Part 3 - Execution

 

3.01      Removals

 

3.02      Subgrade Preparation

 

3.03      Adjustment of Fixtures

 

3.04      PCC Sidewalks, Shared Use Paths, and Driveways

 

3.05      Asphalt Shared Use Paths and Driveways

 

3.06      Brick/Paver Sidewalks with a Pavement Base

 

3.07      Detectable Warning Installation

 

3.08      Slope and Smoothness Testing

 

3.09      Granular Driveway Surfacing

 

3.10      Cleaning

 

3.11      Material Testing

 

3.12      Sidewalk and Curb Ramp Compliance

 

Figures

 

7030.101          Concrete Driveway, Type A

 

7030.102          Concrete Driveway, Type B

 

7030.103          Driveway Grading

 

7030.104          Right-of-way Grading

 

7030.201          Classes of Sidewalks

 

7030.202          Curb Details for Class A Sidewalk

 

7030.203          Brick/Paver Sidewalk

 

7030.204          General Features of an Accessible Sidewalk

 

7030.205          General Sidewalk and Curb Ramp Details

 

7030.206          Curb Ramps Outside of Intersection Radius

 

7030.207          Curb Ramp for Class B or C Sidewalk

 

7030.208          Alternative Curb Ramp for Class B or C Sidewalk

 

7030.209          Curb Ramps for Class A Sidewalk

 

7030.210          Detectable Warning Placement

 

Section 7040 - Pavement Rehabilitation

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05         Delivery, Storage, Handling, and Salvaging

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

Part 3 - Execution

 

3.01      General

 

3.02      Full Depth Patching

 

3.03      Partial Depth Patching

 

3.04      Diamond Grinding

 

3.05      Milling

 

3.06      Crack and Joint Cleaning and Filling, Hot Pour

 

3.07      Crack Cleaning and Filling, Emulsion

 

3.08      Pavement Removal

 

3.09      Curb and Gutter Removal

 

3.10      Dowel Bar Retrofit

 

3.11      Core Hole Cutting and Replacement

 

Figures

 

7040.101          Full Depth PCC Patches Less Than or Equal to 15’ Long

 

7040.102          Full Depth PCC Patches Greater Than 15’ Long

 

7040.103          Full Depth HMA Patches

 

7040.104          Partial Depth Patches

 

7040.105          Flowable Mortar Cutoffwall

 

7040.106          Dowel Bar Retrofit

 

7040.107          Utility Core Hole Repair

 

Section 7050 - Asphalt Stabilization

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Re-shaping Ditches

 

3.03      Prepare / Place Base Material

 

3.04      Surface Fixture Adjustment

 

3.05      Application and Mixing of Asphalt Emulsion

 

3.06      Grade and Compact Material

 

3.07      Surface Treatment

 

Section 7060 - Bituminous Seal Coat

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Surface Preparation

 

3.03      Heating Bituminous Material

 

3.04      Spreading Bituminous Material

 

3.05      Rolling

 

3.06      Two Course Seal Coats

 

3.07      Clean Up

 

Section 7070 - Emulsified Asphalt Slurry Seal

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

2.02      Composition of the Slurry Mix

 

2.03      Mix Design

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Surface Preparation

 

3.03      Applying Slurry Material

 

3.04      Slurry Leveling

 

3.05      Limitations

 

3.06      Curing and Opening to Traffic

 

Section 7080 - Permeable Interlocking Pavers

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Engineering Fabric

 

2.02      Underdrain

 

2.03      Aggregate

 

2.04      Permeable Interlocking Pavers

 

2.05      PCC Edge Restraint

 

Part 3 - Execution

 

3.01      Pre-Installation Protection

 

3.02      Subgrade Preparation for Permeable Interlocking Pavers

 

3.03      Engineering Fabric

 

3.04      Underdrain

 

3.05      Storage Aggregate

 

3.06      Filter Aggregate

 

3.07      Bedding Aggregate

 

3.08      Installing PCC Edge Restraint

 

3.09      Installing Interlocking Permeable Paver System

 

3.10      Quality Control

 

3.11      Protection of Pavement

 

Figures

 

7080.101          Permeable Interlocking Pavers

 

7080.102          Typical Alley with Permeable Pavers

 

Section 7090 - Cold-in-Place Pavement Recycling

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

2.02      Job Mix Formula

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Preparation

 

3.03      Utilities

 

3.04      Control Strip

 

3.05      Milling the Pavement

 

3.06      Recycling Agent Application

 

3.07      Recycling Additives

 

3.08      Compaction

 

3.09      Secondary Compaction

 

3.10      Smoothness

 

3.11      Surface Course

 

3.12      Quality Control

 

Section 7091 - Full Depth Reclamation

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

2.02      Job Mix Formula

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Preparation

 

3.03      Utilities

 

3.04      Control Strip

 

3.05      Pulverizing

 

3.06      Removal of Excess Material

 

3.07      Stabilizing Agent Application

 

3.08      Stabilizing Additives

 

3.09      Compaction

 

3.10      Curing

 

3.11      Microcracking

 

3.12      Interlayer

 

Section 7092 - Crack and Seat Existing PCC Pavement

 

      Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Preparation

 

3.03      Full Depth Saw Cuts

 

3.04      Partial Depth Patches

 

3.05      Intake Adjustment, Major

 

3.06      Test Section

 

3.07      Cracking

 

3.08      Seating

 

3.09      Milling

 

3.10      Removal of Material

 

3.11      Joint Control Fabric

 

Figures

 

7092.101          Overlay with Crack and Seat