CHAPTER 2 APPENDIX |
|
Appendix 2-1 |
Definitions |
|
|
Appendix 2-2 |
Certificate of Completion of Construction |
|
|
Appendix 2-3 |
"Registration of Minor, Nonrecurring Use of Water" (DNR Form 542-3112) |
|
|
|
|
Appendix 2-14 |
Certified Transcript of Labor Payroll/Statement of Compliance (Form 830176) and Completed Samples |
|
|
Appendix 2-15 |
Traffic Control Non-Compliance Flow Chart |
|
|
Appendix 2-20 |
Request to Lease Excess Land |
|
|
Appendix 2-27 |
Charging of Contract Time |
|
|
Appendix 2-28 |
Weekly Report of Working Days for Incentive/Disincentive Clause |
|
(Form 830241) |
|
|
Appendix 2-31 |
Change Order Authorization Matrix |
|
|
Appendix 2-33 |
Noncomplying Tests or Measurements of Material Incorporated into the Project |
|
|
Appendix 2-34 |
Price Adjustment Schedules |
|
A - Aggregate Gradation Test Deviation |
|
B - Concrete Slump |
|
C - Concrete Air Content, Water Cement Ratio, Vibrator Frequency, Certified Plant Inspection, & Late Curing Application |
|
D - Bridge Floor Resurfacing and Overlay Projects |
|
E - Out-of-Tolerance Tining |
|
F - Liquid Asphalt Noncomplying Viscosity or Penetration |
|
G - Asphalt Residue Deficiency |
|
H - Asphalt Binder (Noncomplying Dynamic Shear Rheometer) |
|
I - Asphalt Binder (Noncomplying Bending Beam Rheometer) |
|
J - Deviation in Asphalt Binder Content |
|
K - Segregation |
|
L - Steel H-Pile Weight Deficiency |
|
M - Asphalt Binder (Noncomplying Percent Recovery) |
|
N - PCC Pavement Edge Damage |
|
O - Erosion & Sediment Control Non-Compliance Flow Chart |
|
P - Noncomplying Asphalt Binder Replacement (Failure to Bump Grade) |
|
|
Appendix 2-35 |
Sample Fuel Adjustment Worksheet – English |
|
|
Appendix 2-36 |
Iowa DOT Construction Project Documentation Checklist |
|
|
|
|
|
|
Appendix 2-37 |
As-Built Adhesive Backed Standard Format Samples: |
|
Certification Block (Form 520003) |
|
Extra Work Order Log (Form 520004) |
|
Estimated Project Quantities (100-0) (Form 520007) |
|
Estimated Project Quantities (100-1) (Form 520008) |
|
Check List for As-Built Plan Preparation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|