TABLE D

 

Price Adjustment Schedules for Bridge Floor

Resurfacing & Overlay Projects

 

Density

Percent Payment

 

 

97.5% and Over

100%

97.4% - 97.0%

50%

96.9% and Below

Remove and replace

 

 

Slump          Target ¾”

Percent Payment

0 – 1”

100%

1 ¼” – 1 ½”

50%

Over 1 ½”

Remove and replace

 

 

Air Content

 

Percent Air          Target 6.5%

Percent Payment

 

 

Less than 4.0%

Remove and replace

4.0% - 4.4%

0%

4.5% - 4.9%

50%

5.0% - 5.4%

75%

5.5% - 7.5%

100%

7.6% - 8.0%

100%

8.1% - 8.5%

100%

8.6% - 9.0%

90%

9.1% - 9.5%

80%

9.6% - 10.0%

70%

10.1% and Over

Evaluate strength impact

 

Determining Deficient Area

 

An overlay density test will be representative of the width placed and:

 

·        For a distance extending one-half the distance to the next density test location measured along center line, or

 

·        To the end section if project is starting or ending.

 

Air and slump will be considered complying for all mix placed since the last complying test.  (Assumes concrete placed since the last previous complying test is in compliance until the noncomplying test occurs.)  When a noncomplying test is identified, much more frequent testing is warranted.