Example
Worksheet E003 Modified (FD Patches) Showing Adjusted Square Yards for Payment
 based upon Overdepth/Underdepth Existing Pavement
Rev 11/12   Modified Form  E003 -99 -20
Line No.:      Project No.:      -30.0001 -15
Item Code:      Category No.:      -20.0001 -10
Description:      Contract ID:      Page No.:    -10.0001 .
10.0001 10
              Plan Measured       20.0001 15
          Patch Pavement       30.0001 Extra Work
  Patch Location   Length Width Patch Thickness Thickness Adjusted To Date  
Date Sta Sta (Side) (ft) (ft) (SY) (in) (in) (SY) (SY) By:
06/02/08 100+00 100+50 Rt 50.00 12.0 66.667 10.000 12.000 73.334 73.334   20 10
06/02/08 200+00 200+10 Rt 10.00 12.0 13.333 10.000 8.000 12.000 85.333   -20 -10
06/02/08 250+00 250+06 Lt 6.00 12.0 8.000 10.000 10.000 8.000 93.333   0 .
06/02/08 250+60 250+70 Rt 10.00 12.0 13.333 10.000 14.000 Extra Work 93.333   40 Extra Work
            0.000     0.000 0.000   #DIV/0! #DIV/0!
            0.000     0.000 0.000   #DIV/0! #DIV/0!
            0.000     0.000 0.000   #DIV/0! #DIV/0!
            0.000     0.000 0.000   #DIV/0! #DIV/0!
            0.000     0.000 0.000   #DIV/0! #DIV/0!
            0.000     0.000 0.000   #DIV/0! #DIV/0!
            0.000     0.000 0.000   #DIV/0! #DIV/0!
            0.000     0.000 0.000   #DIV/0! #DIV/0!
            0.000     0.000 0.000   #DIV/0! #DIV/0!
            0.000     0.000 0.000   #DIV/0! #DIV/0!
            0.000     0.000 0.000   #DIV/0! #DIV/0!
            0.000     0.000 0.000   #DIV/0! #DIV/0!
         
Qty. Awarded:    Authorized:    Method of Measurement:   
CO Adjust.:    Quantity Paid:    Basis of Payment:   
% Authorized:  0.0 Checked By:   
Audited By:   
Note:  This form can be used to track daily patching quantities and daily or weekly totals can be transferred to Fieldbook to Worksheet E003.