CHAPTER 3 GENERAL INSPECTION |
|
|
|
3.00 |
GENERAL INSPECTION INSTRUCTIONS |
3.01 |
INSPECTION PERSONNEL |
|
Responsibilities |
|
Authority |
3.02 |
SUPERVISION BY SUBCONTRACTOR |
3.03 |
COMMUNICATION WITH CONSULTANTS AND CONSULTANT PLAN ERRORS |
3.04 |
REMOVING MATERIALS FROM PROJECTS |
3.05 |
SALVAGED PROJECT MATERIALS REPORTING |
3.06 |
NOTICE OF SUSPENSION OR RESUMPTION OF WORK |
3.07 |
MATERIALS QUALITY ASSURANCE PROGRAM |
|
Quality Assurance for Portland Cement Concrete (PCC) Paving |
|
Quality Assurance for Ready Mix Concrete |
|
Quality Assurance for Asphalt Paving |
|
Plant Reports |
|
Documentation |
|
Specification Violations |
|
Testing Equipment & Supplies |
|
Samples |
3.10 |
DIARIES, RECORDS, AND MEASUREMENTS |
3.11 |
MEASUREMENT OF PAY QUANTITIES AND RETENTION OF RECORDS |
|
Measurement of Pay Quantities and Digital Records Management |
|
Retention of Records |
3.20 |
FIELD TESTS |
3.21 |
FIELD TESTING ON CONSTRUCTION PROJECTS |
|
Materials I.M. 204 |
|
Project Verification Sampling and Testing |
|
“Noncompliance Notice” (Form 830245) |
|
Independent Assurance Sampling and Testing |
3.22 |
CONTRACTOR ASSISTED SAMPLING AND VALIDATION OF CONTRACTOR TEST RESULTS |
|
Evaluation of Test Results |
3.30 |
CONTROL OF MATERIALS |
3.31 |
IDENTIFICATION OF APPROVED MATERIALS |
3.32 |
DOCUMENTATION OF APPROVED STEEL BEAM RAILING |
3.40 |
HAULING OF MATERIALS AND MOVEMENT OF CONSTRUCTION EQUIPMENT |
|
Hauling on Closed Roads |
|
Hauling on Roads Open to General Traffic |
|
Allowances to Axle Load Limits |
3.50 |
WEIGHING EQUIPMENT FOR DETERMINATION OF PAY QUANTITIES |
|
Weight Tickets |
|
Truck Platform Scale Approval |
|
Weigh Hopper, Batch Scales, & Load Cell Approval |
|
Scale Checks for Sensitivity |
|
Truck Platform Scale Use |
|
Use of Weighmasters |
3.60 |
SMOOTHNESS |
3.61 |
TESTING |
3.62 |
EVALUATION |
|
Pavement Smoothness |
|
Bridge Deck Smoothness |
3.70 |
IMPACTS TO ADJOINING PROPERTY |
3.71 |
ACCESS LOCATIONS ON CONSTRUCTION PROJECTS |
|
Highways Where Access Rights Are Acquired |
|
Highways Where Access Rights Are Not Acquired |
|
Temporary Access for Contractor’s Use |
|
Installation of Locked Gates in Interstate Right-of-Way Fence |
3.72 |
RELOCATION OF MAILBOXES |
3.73 |
INTERIM USE OF PROPERTY BETWEEN ACQUISITION & CONSTRUCTION |
3.74 |
INVOLVEMENT OF LAW ENFORCEMENT ON CONSTRUCTION PROJECTS |
|
|