CHAPTER 4 CONSTRUCTION SURVEY |
|
|
|
4.00 |
GENERAL STAKING REQUIREMENTS |
4.10 |
RIGHT OF WAY |
4.11 |
INSTALLATION OF RIGHT‑OF‑WAY MARKERS |
|
Location of Markers |
|
Witness Signs |
4.20 |
LAND MONUMENTS AND ROAD CENTERLINE |
4.21 |
RE‑ESTABLISHING ROAD CENTERLINE CONTROL POINTS |
|
Grading Projects |
|
Portland Cement Concrete Pavement |
|
Hot Mix Asphalt Pavement |
|
Land Corners |
4.22 |
REPLACEMENT OF FEDERAL MONUMENTS & PRESERVATION OF ENGINEERING DATA |
4.23 |
CENTERLINE POINT REFERENCING |
|
Location of Reference Points |
|
Methods of Referencing Points Using a Transit |
|
Method of Referencing Using an Electronic Total Station Survey Instrument |
|
Land Corners |
|
Concrete Monuments |
4.24 |
BENCH MARKS |
|
Permanent Bench Marks Along Rural Highways |
4.30 |
CONTRACTOR FURNISHED CONSTRUCTION SURVEY |
|
Special Attention Items |
|
Documentation |
|
Contract Administration |