Section 2203. Hot Mix Asphalt Base
Construct an HMA base, as specified, upon a prepared or corrected subgrade or a previously constructed base or subbase.
Apply Article 2303.02.
Construct HMA base to the dimensions shown in the contract documents and according to Section 2303.
2203.04 Method of Measurement.
Measurement for the various items involved in the construction of a HMA base will be according to Article 2303.04.
Payment for the various items involved in the construction of a HMA base will be as provided in Article 2303.05.