Division 11 Table of Contents
Section 11,010 - Construction Survey
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Hubs
2.02 Lath
Part 3 - Execution
3.01 Equipment
3.02 Project Control
3.03 Construction Staking
3.04 Monument Preservation and Replacement
Section 11,020 - Mobilization
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
None.
Part 3 - Execution
None.
Section 11,030 - Temporary Services During Construction
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Mailboxes
Part 3 - Execution
3.01 Postal Service
3.02 Solid Waste Collection
Figure
11030.101 Temporary Mailboxes
Section 11,040 - Temporary Sidewalk Access
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Granular Surfacing
2.02 Temporary Longitudinal Channelizing Device
Part 3 - Execution
3.01 Temporary Pedestrian Residential Access
3.02 Temporary Granular Sidewalk
3.03 Temporary Longitudinal Channelizing Device
Figures
11040.101 Temporary Granular Sidewalk and Temporary Residential Access
11040.102 Temporary Pedestrian Channelizing Device
Section 11,050 - Concrete Washout
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Concrete Washout
Part 3 - Execution
3.01 Concrete Washout
3.02 Cleanup and Removal