Division 1 Table of Contents
Section 1010 - Definitions
1.01 Description
1.02 Abbreviations
1.03 Definitions and Terms
Section 1020 - Proposal Requirements and Conditions
1.01 Qualification of the Bidders
1.02
Contents
of the Proposal Forms
1.03
Quantities
and Unit Prices
1.04
Examination
of the Contract Documents and Site of Work
1.05
Interpretation
of the Contract Documents
1.06
Addendum
1.07
Preference
for Labor and Materials
1.08
Taxes
1.09
Preparation
of the Proposal
1.10
Bidders
Certification
1.11
Irregular
and Nonresponsive Proposals
1.12
Submission
of the Proposal, Identity of Bidder, and Bid Security
1.13
Withdrawal
or Revision of the Proposal Prior to Opening of Proposals
1.14
Opening
of Proposals
1.15 Limitation on Withdrawal of Proposals After Opening of Proposals
Section 1030 - Approval for Award and Award of Contract
1.01 Acceptance or Rejection of Proposals
1.02 Release of Bid Security
1.03 Award of Contract
1.01
Intent
of the Contract Documents
1.02
Correlation
of the Contract Documents
1.03
Coordination
of Specifications, Plans, and Special Provisions
1.04 Conformity with the Contract Documents
1.05 Plans
1.06 Increase or Decrease of Work
1.07 Change Orders
1.08 Site Conditions
1.09 Changed Site Conditions
1.10 Disputed Claims for Extra
Compensation
1.11 Delays Caused by the Jurisdiction
1.12 Oral Agreements, Conversations, and
Informal Communications
1.13 Errors or Omissions
Section 1050 - Control of Work
1.01 Authority of the Engineer
1.02 Authority and Duties of the
Engineer’s Authorized Representative
1.03 Cooperation by the Contractor
1.04 Cooperation with Other Contractors
1.05 Shop Drawings, Certificates, and
Equipment Lists
1.06 Conflict Avoidance
1.07 Examination of Materials and Work
1.08 Removal of Defective Work and
Materials
1.09 Unauthorized Work
1.10 Line and Grade Stakes
1.11 Providing Job Site Utilities
1.12 Salvage
1.13 Protection of Water Quality and
Wetlands
1.14 Final Inspection and Acceptance
1.15 Additional Contractor Responsibilities
Section 1060 - Control of Materials
1.01 Materials Source of Supply and
Quality Requirements
1.02 Alternate Processes, Equipment, or
Materials and Other Substitutions
1.03 Samples and Testing
1.04 Storage of Materials
1.05 Unacceptable Materials
1.06 Materials Supplied by the
Jurisdiction
1.07 Materials Supplied by the Contractor
Section 1070 - Legal Relations and Responsibility to the Public
Part 1 - Legal Relations
1.01
Municipal
Regulations, State, and Federal Laws and Regulations
1.02
Governing
Law
1.03
Permits
and Licenses
1.04
Patents
and Royalties
1.05
Use
and Occupancy Prior to Completion of Contract
1.06
Contractor’s
Responsibility for the Work
1.07
Responsibility
for Damage Claims
1.08
Personal
Liability of Public Officials
1.09
Waiver
of Legal Rights
1.10
Acceptance
by the Jurisdiction - Not a Waiver of Contractor’s Obligations or a
Waiver of the Jurisdiction’s Rights
1.11
Business
Organization Requirements
1.12
Consent
to Jurisdiction of Iowa District Court or Federal District Court in Iowa
1.13 Severability
Part 2 - Responsibilities to the Public
2.01
Sanitation
2.02
Convenience
and Safety
2.03
Work
Area
2.04
Project
Area for the Work
2.05
Explosives
2.06
Traffic
Control
2.07
Protection
of Aboveground and Underground Facilities
2.08 Protection of Property
2.09 Land Monuments
2.10
Dust
Control
2.11
Environmental
and Historic Items
2.12
Railroad
Crossings
2.13
Borrow
and Waste Sites
2.14
Maintaining
Postal Service
2.15 Finishing and Cleanup Requirements
Part 3 - Bonds and Insurance
3.01
Performance,
Payment, and Maintenance Bond
3.02
Insurance
Requirements
3.03
Contractor’s
Indemnity - Contractual Liability Insurance
3.04
Contractor’s
Insurance for Other Losses; Waiver of Subrogation
3.05
Property
Insurance
3.06
Endorsement
Naming Jurisdiction as an Additional Insured / Cancellation and
Material Change / Governmental Immunities Endorsement
3.07
Proof
of Insurance
3.08
Notification
in Event of Liability or Damage
3.09 Sample Insurance Forms - See www.iowasudas.org
Section 1080 - Prosecution and Progress
1.01
Subletting
or Assignment of Contract
1.02
Contract
Time
1.03
Work
Progress and Schedule
1.04
Preconstruction
Conference
1.05 Notice to Proceed
1.06
Weekly
Record of Working Days
1.07
Work
on Sundays or Legal Holidays
1.08
Temporary
Suspension of Working Days
1.09
Extension
of Time
1.10
Contractor’s
Employees, Methods, and Equipment
1.11 Contractor’s Equipment Identification
1.12
Liquidated
Damages
1.13
Breach
of Contract
1.14 Termination of Contractor’s Responsibility
Section 1090 - Measurement and Payment
1.01
Measurement
1.02
Scope
of Payment
1.03
Lump
Sum Breakdowns
1.04
Payment
for Change Orders
1.05
Progress
Payments
1.06
Payment
of Retainage
1.07
Sales
and Use Tax Statement
1.08
Acceptance
and Final Payment