Division 2 - Table of Contents
Section 2010 - Earthwork, Subgrade, and Subbase
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Topsoil
2.02 Excavation Materials
2.03 Suitable Embankment Materials
2.04 Foundation Materials
Part 3 - Execution
3.01 Clearing and Grubbing
3.02 Topsoil
3.03 Excavation
3.04 Embankment Construction
3.05 Use of Unsuitable Soils
3.06 Subgrade Preparation
3.07 Subgrade Treatment
3.08 Subbase
3.09 Field Quality Control
Figures
2010.101 Details of Embankments and Rebuilding Embankments
2010.102 Designation of Roadway Earthwork Items