Division 4 Table of Contents

 

Section 4010 - Sanitary Sewers

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Sanitary Sewer (Gravity Mains)

 

2.02      Sanitary Sewer Force Mains

 

2.03      Casing Pipe

 

2.04      Sanitary Sewer Services

 

2.05      Sanitary Sewer Service Relocations

 

2.06      Sanitary Sewer Cleanout

 

Part 3 - Execution

 

3.01      Examination

 

3.02      Gravity Sewer Installation

 

3.03      Sanitary Sewer Installed within a Casing Pipe

 

3.04      Gravity Main Pipe Jointing

 

3.05      Force Main Installation

 

3.06      Sanitary Sewer Service Stubs

 

3.07      Sanitary Sewer Service Relocation

 

3.08      Sanitary Sewer Abandonment

 

3.09      Connection to Existing Manhole

 

3.10      Sanitary Sewer Cleanout

 

3.11      Tolerances

 

3.12      Conflicts

 

3.13      Cleaning, Inspection, and Testing

 

Figures

 

4010.201          Sanitary Sewer Service Stub

 

4010.202          Sewage Air Release Valve Pit

 

4010.203          Sanitary Sewer Cleanout

 

4010.901          Relocate Sanitary Sewer Service in Conflict with New Sewer

 

Section 4020 - Storm Sewers

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Storm Sewers

 

2.02      Linear Trench Drain

 

2.03      Casing Pipe

 

2.04      Pipe Aprons

 

2.05      Apron Footings

 

2.06      Apron Guard

 

Part 3 - Execution

 

3.01      Examination

 

3.02      Pipe Installation

 

3.03      Storm Sewer Installed within a Casing Pipe

 

3.04      Linear Trench Drain

 

3.05      Pipe Jointing

 

3.06      Aprons

 

3.07      Tolerances

 

3.08      Conflicts

 

3.09      Storm Sewer Abandonment

 

3.10      Connection to Existing Manhole or Intake

 

3.11      Cleaning, Inspection, and Testing

 

Figures

 

4020.211          Storm Sewer Pipe Connections

 

Section 4030 - Pipe Culverts

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Pipe Culverts

 

2.02      Pipe Aprons

 

2.03      Apron Footings

 

2.04      Apron Guard

 

Part 3 - Execution

 

3.01      Pipe Culvert Installation

 

3.02      Aprons

 

3.03      Cleaning, Inspection, and Testing

 

Figures

 

4030.221          RCP Apron Section Footing

 

4030.222          Circular Concrete Aprons

 

4030.223          Arch and Elliptical Concrete Pipe Aprons

 

4030.224          Concrete Pipe Apron Guard

 

4030.225          Metal Pipe Aprons and Apron Guards

 

Section 4040 - Subdrains and Footing Drain Collectors

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Footing Drain Collectors

 

2.02      Type 1 Subdrains (Longitudinal Subdrain)

 

2.03      Type 2 Subdrains (Combination Subdrain/Footing Drain Collector)

 

2.04      Porous Backfill Material

 

2.05      Subdrain Outlets

 

2.06      Subdrain or Footing Drain Cleanouts

 

2.07      Engineering Fabric

 

2.08      Storm Sewer Service Stubs

 

Part 3 - Execution

 

3.01      Subdrains

 

3.02      Footing Drain Collectors

 

3.03      Footing Drain Service Stubs

 

Figures

 

4040.231          Subdrains

 

4040.232          Subdrain Cleanouts

 

4040.233          Subdrain Outlets

 

Section 4050 - Pipe Rehabilitation

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      CIPP Main Lining

 

2.02      CIPP Point Repair

 

2.03      CIPP Service Repair

 

2.04      Chemical Grout

 

2.05      Sewer Dye

 

2.06         Pipe Repair Couplings for Spot Repairs by Pipe Replacement

 

2.07      Sewer Main Pipe (for Spot Repairs)

 

Part 3 - Execution

 

3.01      Sewer Cleaning and Inspection for Rehabilitation

 

3.02      Bypassing Sewage

 

3.03      CIPP Main Lining

 

3.04      CIPP Point Repair

 

3.05      CIPP Service Repair

 

3.06      Pressure Testing and Grouting of Sewer Joints

 

3.07      Spot Repairs by Pipe Replacement

 

3.08      Cleanup and Closeout

 

Section 4060 - Cleaning, Inspection, and Testing of Sewers

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Testing Equipment

 

Part 3 - Execution 

 

3.01      Cleaning

 

3.02      Video Inspection

 

3.03      Sanitary Sewer Leakage Testing

 

3.04      Deflection Testing

 

3.05      Force Main Testing