Division 9 Table of Contents
Section 9010 - Seeding
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Seed
2.02 Seed Mixtures and Seeding Dates
2.03 Fertilizer
2.04 Sticking Agent
2.05 Inoculant for Legumes
2.06 Water
2.07 Mulch
Part 3 - Execution
3.01 Equipment
3.02 Area of Seeding
3.03 Finish Grading and Topsoil
3.04 Conventional Seeding
3.05 Hydraulic Seeding
3.06 Pneumatic Seeding
3.07 Watering
3.08 Re-seeding
3.09 Clean Up
3.10 Acceptance and Warranty
Section 9020 - Sodding
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Sod
2.02 Fertilizer
2.03 Stakes
2.04 Water
Part 3 - Execution
3.01 Preparation of Sodbed
3.02 Fertilizing - First Application
3.03 Sod Installation
3.04 Watering
3.05 Fertilizing - Second Application
3.06 Maintenance
3.07 Clean Up
3.08 Acceptance
Section 9030 - Plant Material and Planting
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Plant Materials
2.02 Mulch
2.03 Backfill Material
2.04 Staking Material
2.05 Guying Material
2.06 Tree Wrapping Material for Winter Protection
2.07 Water
2.08 Tree Drainage Wells
2.09 Herbicide
Part 3 - Execution
3.01 Allowable Planting Dates
3.02 Preparation
3.03 Location of Plants
3.04 Excavation of Planting Pit
3.05 Tree Drainage Wells
3.06 Planting
3.07 Mulching
3.08 Wrapping
3.09 Staking and Guying
3.10 Pruning
3.11 Clean Up
3.12 Establishment and Warranty Periods and Acceptance
Figures
9030.101 Planting Pit
9030.102 Tree Staking, Guying, and Wrapping
9030.103 Tree Drainage Well
Section 9040 - Erosion and Sediment Control
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Compost Blankets
2.02 Compost Blanket and Filter Berm Tackifier
2.03 Filter Material
2.04 Filter Sock
2.05 Temporary Rolled Erosion Control Products (RECP)
2.06 Wattles
2.07 Check Dams
2.08 Level Spreaders
2.09 Rip Rap
2.10 Temporary Pipe Slope Drains
2.11 Sediment Basin Outlet Structures
2.12 Sediment Traps
2.13 Silt Fence
2.14 Stabilized Construction Entrance
2.15 Dust Control
2.16 Erosion Control Mulch
2.17 Turf Reinforcement Mats (TRM)
2.18 Inlet Protection
2.19 Flow Transition Mats
2.20 Engineering Fabric
Part 3 - Execution
3.01 SWPPP Preparation
3.02 SWPPP Management
3.03 Erosion and Sediment Control Inspection
3.04 Equipment
3.05 Compost Blanket
3.06 Filter Berms
3.07 Filter Socks
3.08 Temporary Rolled Erosion Control Products (RECP)
3.09 Wattles
3.10 Check Dams
3.11 Temporary Earth Diversion Structures
3.12 Level Spreaders
3.13 Rip Rap
3.14 Temporary Pipe Slope Drains
3.15 Sediment Basin Outlet Structures
3.16 Anti-Seep Collar
3.17 Sediment Traps
3.18 Silt Fences
3.19 Stabilized Construction Entrance
3.20 Dust Control
3.21 Erosion Control Mulching
3.22 Turf Reinforcement Mats
3.23 Surface Roughening
3.24 Inlet Protection
3.25 Flow Transition Mats
3.26 Temporary Erosion Control Seeding
Figures
9040.101 Compost Blanket
9040.102 Filter Berm and Filter Sock
9040.103 Rolled Erosion Control Product (RECP) Installation on Slopes
9040.104 Rolled Erosion Control Product (RECP) Installation in Channel
9040.105 Wattle
9040.106 Check Dam Spacing
9040.107 Rock Check Dam
9040.108 Temporary Earth Diversion Structures
9040.109 Level Spreader
9040.110 Rip Rap for Pipe Outlet onto Flat Ground
9040.111 Rip Rap Apron for Pipe Outlet into Channel
9040.112 Temporary Pipe Slope Drain
9040.113 Sediment Basin without Emergency Spillway
9040.114 Sediment Basin with Emergency Spillway
9040.115 Sediment Basin Dewatering Device (Perforated Riser)
9040.116 Anti-Vortex Device
9040.117 Anti-Seep Collar
9040.118 Sediment Trap
9040.119 Silt Fence
9040.120 Stabilized Construction Entrance
Section 9050 - Gabions and Revet Mattresses
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Double Twisted Wire Baskets
2.02 Welded Wire Baskets
2.03 Gabion and Mattress Stone
2.04 Engineering Fabric
2.05 Anchor Stakes
2.06 Granular Subbase
Part 3 - Execution
3.01 Subgrade Preparation and Bedding
3.02 Engineering Fabric
3.03 Connections
3.04 Gabion Assembly and Installation
3.05 Revet Mattress Assembly and Installation
Figures
9050.101 Gabion Assembly
Section 9060 - Chain Link Fence
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Fabric
2.02 Posts, Rails, and Braces
2.03 Fittings
2.04 Tie Wire and Tension Wire
2.05 Barbed Wire Supporting Arms
2.06 Barbed Wire
2.07 Gates
2.08 Concrete
2.09 Electrical Ground
Part 3 - Execution
3.01 Chain Link Fence Installation
3.02 Removal of Existing Fences
3.03 Temporary Fence
Figures
9060.101 Chain Link Fence
9060.102 Chain Link Gate
9060.103 Post Installation Adjacent to Retaining Walls
Section 9070 - Landscape Retaining Walls
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
Part 3 - Execution
3.01 Excavation and Embankment
3.02 Installation
Figures
9070.101 Landscape Timber Retaining Wall
9070.102 Modular Block Retaining Wall
9070.103 Limestone Retaining Wall
Section 9071 - Segmental Block Retaining Walls
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
Part 3 - Execution
3.01 Excavation and Embankment
3.02 Installation
Section 9072 - Combined Concrete Sidewalk and Retaining Wall
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Materials
Part 3 - Execution
3.01 Excavation and Embankment
3.02 Installation
3.03 Joints
3.04 Rustication
Figures
9072.221 Combined Retaining Wall - Sidewalk
Section 9080 - Concrete Steps, Handrails, and Safety Rail
Part 1 - General
1.01 Section Includes
1.02 Description of Work
1.03 Submittals
1.04 Substitutions
1.05 Delivery, Storage, and Handling
1.06 Scheduling and Conflicts
1.07 Special Requirements
1.08 Measurement and Payment
Part 2 - Products
2.01 Steps
2.02 Handrail
2.03 Safety Rail
2.04 Finish
2.05 Attachment
Part 3 - Execution
3.01 Installation of Steps
3.02 Installation of Rail
3.03 Painting
Figures
9080.101 Type A Concrete Steps with Handrail
9080.102 Type B Concrete Steps with Handrail
9080.103 Safety Rail