CHAPTER 11 - STRUCTURES |
|
|
|
11.00 |
INTRODUCTION |
11.01 |
REMOVAL OF BRIDGES |
11.02 |
GUIDANCE FOR HEAVY EQUIPMENT & MATERIALS ON BRIDGES |
11.03 |
TEMPORARY STRUCTURES FOR THE PROTECTION OF THE PUBLIC |
11.04 |
RESERVED FOR FUTURE USE |
11.05 |
PILE DRIVING CAP AND HAMMER INFORMATION |
11.10 |
EARTHWORK FOR STRUCTURES |
11.11 |
EXCAVATION |
11.12 |
BACKFILLING STRUCTURES |
|
Culverts |
|
Bridge Abutments |
|
Measurement and Payment |
11.20 |
FOUNDATIONS |
11.21 |
STAKING AND CHECKING LOCATIONS OF STRUCTURES |
|
Check and Double Check |
|
Documentation |
|
Common Survey Errors to Avoid |
|
Encountering Old Substructures |
|
Setting Bench Marks (Post Construction) |
11.22 |
PILING AND PILE DRIVING |
|
Pile Driving |
|
Vibratory Hammers |
|
Gravity Hammers |
|
Diesel Hammers |
|
Bearing and Penetration |
|
Retaps |
|
Dynamic Pile Analyzer |
|
Static Load Tests |
11.23 |
SPLICING PILE |
|
Welding Steel Pile |
|
Concrete Pile |
11.24 |
PILING ACCEPTANCE |
|
Steel Pile |
|
Wood Pile |
|
Steel Pile Cutoffs |
11.25 |
WAVE EQUATION |
|
Hammer Data Form |
|
Driving Graphs |
|
Log of Piling Driven |
11.26 |
PREBORED HOLES |
|
Typical Preboring |
|
Special Prebore Situations |
|
Bentonite |
11.27 |
DRILLED SHAFTS |
11.30 |
BRIDGES |
|
Bridge Temporary Restrictions |
|
Bridge Inventory and Clearance Reports |
11.31 |
FALSEWORK |
|
Temporary Fastenings |
|
Falsework Plans |
|
Falsework Inspection |
|
Falsework Foundations |
|
Materials |
|
Project Quality |
|
Miscellaneous Items |
|
Falsework Adjacent To Traffic |
|
Field Changes |
|
Inspection during Concrete Placement |
|
Removal of Falsework |
11.32 |
BRIDGES ‑ STEEL BEAM |
|
Prebolting Meeting |
|
Erecting Steel Beams |
|
High Strength Fasteners |
|
Painting |
11.33 |
BRIDGES ‑ CONCRETE BEAM |
|
Precast ‑ Prestressed Deck Panels |
|
Pretensioned Prestressed Concrete Beam (PPC Beam) Erection |
|
Diaphragms (Steel or Concrete) |
11.40 |
REINFORCEMENT |
|
General Placement Guidelines for Bridge Reinforcing Steel |
11.41 |
PLACEMENT AND CHECKING (BRIDGE FLOORS) |
|
Slab Thickness |
|
Clearance of Bottom Reinforcement |
|
Clearance of Top Mat Reinforcement |
|
Cover Over Top Mat of Reinforcement |
|
Slab Bridges |
|
Special Attention Areas |
11.42 |
EPOXY COATED REINFORCEMENT |
|
Care and Handling |
|
Field Inspection |
|
Repair of Damaged Coating |
11.43 |
CAGE STEEL (DRILLED SHAFTS) |
11.44 |
SPLICING |
|
Splice Approval |
11.45 |
PAYMENT FOR REINFORCING STEEL |
11.50 |
CONCRETE (STRUCTURAL, CLASS X, AND FLOWABLE MORTAR) |
11.51 |
PCC PLANT PAGE (FORM 800240E) |
11.52 |
USE OF READY MIXED STRUCTURAL CONCRETE |
|
Prepour Meeting |
|
Inspector’s Checklist |
11.53 |
ADMIXTURES |
|
Air Entraining Admixtures |
|
Water Reducing Admixtures – Regular |
|
Water Reducing Admixtures - Super Plasticizers |
|
Retarding Admixtures |
|
Accelerating Admixtures |
|
Corrosion Inhibiting Admixtures |
|
Finely Divided Mineral Admixtures |
|
Pozzolanic Materials |
|
Fly Ash (Class C & F) |
|
Silica Fume |
|
Cementitious Materials |
|
Ground Granulated Blast Furnace Slag (GGBFS) |
11.54 |
USE OF INSULATED FORMS FOR PROTECTION |
|
Checking Temperature of Concrete |
11.55 |
DECK PLACEMENT AND HEAT OF HYDRATION FOR MASS CONCRETE PLACEMENTS |
|
Deck Placement |
|
Deck Concrete Temperature and Curing |
|
Placement Considerations |
|
Field Documentation |
|
Heat of Hydration for Mass Concrete Placements |
11.56 |
PLACEMENT METHODS (PUMPING, BELTING, AND CRANE BUCKET) |
|
Crane and Bucket |
|
Belt Placement |
|
Pump Placement |
11.57 |
REMOVAL OF FORMS AND SUBJECTING CONCRETE TO EXTERIOR LOADS |
|
Removal of Forms |
|
Subjecting Concrete to Exterior Loads |
11.58 |
CONCRETE SURFACE FINISH |
|
Concrete Railings |
|
Surface Finish on Other Concrete Surfaces |
11.59 |
FLOWABLE MORTAR |
|
Backfilling Culverts - Typical Grading |
|
Plugging Culverts |
|
Backfilling Culverts - Under Bridges |
|
Filling Voids Between Culverts |
11.60 |
DECKS AND OVERLAYS |
11.61 |
DECK OVERLAY PREPARATION |
|
Class A Floor Repair |
|
Class A Surface Preparation |
|
Work on Adjacent Lanes |
11.62 |
SEQUENCE OF POURING |
|
Use of Retarders |
|
Concrete Bridge Floors |
|
Placement Methods |
11.63 |
INSTALLATION OF JOINTS |
|
Preformed Neoprene Joints |
|
Steel Extruded Expansion Joints (Strip Seals) |
11.64 |
BRIDGE FLOORS |
|
Finishing and Equipment |
|
Profile Grades - Overlays |
|
Transverse Grooving |
|
Longitudinal Grooving In Hardened Concrete |
|
Missed Texturing |
11.65 |
CONCRETE |
|
Concrete Mobile Mixers |
|
Frequency of Checks |
|
Density Testing |
11.66 |
APPROACH SECTIONS |
|
Approach Pavements to Bridge Abutments |
|
“Movable” Abutments |
|
“Fixed” Abutments |
|
Bridge Approach Tapers |
|
Shoulder Maintenance |
11.67 |
SMOOTHNESS OF BRIDGE DECKS |
|
Checklist |
|
Specification 2428 |
|
Surface Checking |
11.70 |
BARRIER RAILS |
11.71 |
CONCRETE F-SHAPE, OPEN, AND RETROFIT RAIL |
|
Rail Concrete Placement and Bridge Deck Falsework |
11.72 |
SLIP FORM BARRIER RAIL |
|
Longitudinal Cracks |
|
Reinforcement |
|
Reinforcement Bar Cover |
|
Misalignment and Nonuniform Top Elevation |
|
Shadowing |
|
Mix Design for Slip Form and Cast-in-Place |
|
Curing of Slip Form Barrier Rail |
|
Expansion Joint Construction in Barrier Rail |
11.73 |
CAST-IN-PLACE (RETROFIT) BARRIER RAIL |
|
Preventing Dowel Installation Damage of Conduit |
11.74 |
CAST-IN-PLACE OPEN BARRIER RAIL FORM REMOVAL |
11.80 |
REINFORCED CONCRETE CULVERTS |
11.81 |
DESIGN CHANGES ON CULVERTS |
11.82 |
INSTALLING REINFORCING STEEL, PLACING CONCRETE, AND FORM |
|
REMOVAL |
|
Installing Reinforcing Steel |
|
Placing Concrete |
|
Removal of Wall Forms |
|
Removal of Slab Forms |
11.83 |
BOX CULVERT CURTAIN WALLS |
|
Sheet Pile Curtain Wall |
|
Reinforcement Placement |
11.84 |
BOX CULVERT BELL JOINTS |
11.85 |
GUIDELINES FOR INSPECTION OF PRECAST CONCRETE BOX CULVERTS |