Division 9 Table of Contents

 

Section 9010 - Seeding

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Seed

 

2.02      Seed Mixtures and Seeding Dates

 

2.03      Fertilizer

 

2.04      Sticking Agent

 

2.05      Inoculant for Legumes

 

2.06      Water

 

2.07      Mulch

 

Part 3 - Execution

 

3.01      Equipment

 

3.02      Area of Seeding

 

3.03      Finish Grading and Topsoil

 

3.04      Conventional Seeding

 

3.05      Hydraulic Seeding

 

3.06      Pneumatic Seeding

 

3.07      Watering

 

3.08      Re-seeding

 

3.09      Clean Up

 

3.10      Acceptance and Warranty

 

Section 9020 - Sodding

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Sod

 

2.02      Fertilizer

 

2.03      Stakes

 

2.04      Water

 

Part 3 - Execution

 

3.01      Preparation of Sodbed

 

3.02      Fertilizing - First Application

 

3.03      Sod Installation

 

3.04      Watering

 

3.05      Fertilizing - Second Application

 

3.06      Maintenance

 

3.07      Clean Up

 

3.08      Acceptance

 

Section 9030 - Plant Material and Planting

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Plant Materials

 

2.02      Mulch

 

2.03      Backfill Material

 

2.04      Staking Material

 

2.05      Guying Material

 

2.06      Tree Wrapping Material for Winter Protection

 

2.07      Water

 

2.08      Tree Drainage Wells

 

2.09      Herbicide

 

Part 3 - Execution

 

3.01      Allowable Planting Dates

 

3.02      Preparation

 

3.03      Location of Plants

 

3.04      Excavation of Planting Pit

 

3.05      Tree Drainage Wells

 

3.06      Planting

 

3.07      Mulching

 

3.08      Wrapping

 

3.09      Staking and Guying

 

3.10      Pruning

 

3.11      Clean Up

 

3.12      Establishment and Warranty Periods and Acceptance

 

Figures

 

9030.101            Planting Pit

 

9030.102            Tree Staking, Guying, and Wrapping

 

9030.103            Tree Drainage Well

 

Section 9040 - Erosion and Sediment Control

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Compost Blankets

 

2.02      Compost Blanket Tackifier

 

2.03      Filter Material

 

2.04      Slash Mulch

 

2.05      Filter Sock

 

2.06      Temporary Rolled Erosion Control Products (RECP)

 

2.07      Wattles

 

2.08      Check Dams (Ditch Check)

 

2.09      Level Spreaders

 

2.10      Rip Rap

 

2.11      Temporary Pipe Slope Drains

 

2.12      Temporary Sediment Basin Outlet Structures

 

2.13      Sediment Traps

 

2.14      Silt Fence

 

2.15      Stabilized Construction Exit

 

2.16      Dust Control

 

2.17      Erosion Control Mulch

 

2.18      Turf Reinforcement Mats (TRM)

 

2.19      Inlet Protection

 

2.20      Flow Transition Mats

 

2.21      Grid Tied Concrete Block Mat

 

2.22      Engineering Fabric

 

Part 3 - Execution

 

3.01      SWPPP Preparation

 

3.02      SWPPP Management

 

3.03      Erosion and Sediment Control Inspection

 

3.04      Equipment

 

3.05      Compost Blankets

 

3.06      Filter Berms

 

3.07      Filter Socks

 

3.08      Temporary Rolled Erosion Control Products (RECP)

 

3.09      Wattles

 

3.10      Check Dams

 

3.11      Temporary Earth Diversion Berms

 

3.12      Level Spreaders

 

3.13      Rip Rap

 

3.14      Temporary Pipe Slope Drains

 

3.15      Temporary Sediment Basin

 

3.16      Sediment Traps

 

3.17      Silt Fences

 

3.18      Stabilized Construction Exit

 

3.19      Dust Control

 

3.20      Erosion Control Mulching

 

3.21      Turf Reinforcement Mats

 

3.22      Inlet Protection

 

3.23      Flow Transition Mats

 

3.24      Grid Tied Concrete Block Mat

 

3.25      Temporary Erosion Control Seeding

 

Figures

 

9040.101            Compost Blanket

 

9040.102            Filter Berm and Filter Sock

 

9040.103            Rolled Erosion Control Product (RECP) Installation on Slopes

 

9040.104            Rolled Erosion Control Product (RECP) Installation in Channels

 

9040.105            Wattle

 

9040.106            Check Dams

 

9040.107            Rock Check Dam

 

9040.108            Temporary Earth Diversion Berms

 

9040.109            Level Spreader

 

9040.110            Rip Rap for Pipe Outlet onto Flat Ground

 

9040.111            Rip Rap Apron for Pipe Outlet into Channel

 

9040.112            Temporary Pipe Slope Drain

 

9040.113            Sediment Basin without Emergency Spillway

 

9040.114            Sediment Basin with Emergency Spillway

 

9040.115            Sediment Basin Dewatering Device (Perforated Riser)

 

9040.116            Anti-Vortex Device

 

9040.117            Sediment Baffle

 

9040.118            Sediment Trap

 

9040.119            Silt Fence

 

9040.120            Stabilized Construction Exit

 

Section 9050 - Gabions and Revet Mattresses

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Double Twisted Wire Baskets

 

2.02      Welded Wire Baskets

 

2.03      Gabion and Mattress Stone

 

2.04      Engineering Fabric

 

2.05      Anchor Stakes

 

2.06      Granular Subbase

 

Part 3 - Execution

 

3.01      Subgrade Preparation and Bedding

 

3.02      Engineering Fabric

 

3.03      Connections

 

3.04      Gabion Assembly and Installation

 

3.05      Revet Mattress Assembly and Installation

 

Figures

 

9050.101            Gabion Assembly

 

Section 9060 - Chain Link Fence

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Fabric

 

2.02      Posts, Rails, and Braces

 

2.03      Fittings

 

2.04      Tie Wire and Tension Wire

 

2.05      Barbed Wire Supporting Arms

 

2.06      Barbed Wire

 

2.07      Gates

 

2.08      Concrete

 

2.09      Electrical Ground

 

Part 3 - Execution

 

3.01      Chain Link Fence Installation

 

3.02      Removal of Existing Fences

 

3.03      Temporary Fence

 

Figures

 

9060.101            Chain Link Fence

 

9060.102            Chain Link Gate

 

9060.103            Post Installation Adjacent to Retaining Walls

 

Section 9070 - Landscape Retaining Walls

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

Part 3 - Execution

 

3.01      Excavation and Embankment

 

3.02      Installation

 

Figures

 

9070.101            Landscape Timber Retaining Wall

 

9070.102            Modular Block Retaining Wall

 

9070.103            Limestone Retaining Wall

 

Section 9071 - Segmental Block Retaining Walls

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

Part 3 - Execution

 

3.01      Excavation and Embankment

 

3.02      Installation

 

Section 9072 - Combined Concrete Sidewalk and Retaining Wall

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Materials

 

Part 3 - Execution

 

3.01      Excavation and Embankment

 

3.02      Installation

 

3.03      Joints

 

3.04      Rustication

 

Figures

 

9072.221            Combined Retaining Wall - Sidewalk

 

Section 9080 - Concrete Steps, Handrails, and Safety Rail

 

Part 1 - General

 

1.01      Section Includes

 

1.02      Description of Work

 

1.03      Submittals

 

1.04      Substitutions

 

1.05      Delivery, Storage, and Handling

 

1.06      Scheduling and Conflicts

 

1.07      Special Requirements

 

1.08      Measurement and Payment

 

Part 2 - Products

 

2.01      Steps

 

2.02      Handrail

 

2.03      Safety Rail

 

2.04      Finish

 

2.05      Attachment

 

Part 3 - Execution

 

3.01      Installation of Steps

 

3.02      Installation of Rail

 

3.03      Painting

 

Figures

 

9080.101            Type A Concrete Steps with Handrail

 

9080.102            Type B Concrete Steps with Handrail

 

9080.103            Safety Rail