CHAPTER 11 STRUCTURES
11.00 INTRODUCTION
11.01 REMOVAL OF BRIDGES
11.02 GUIDANCE FOR HEAVY EQUIPMENT & MATERIALS ON BRIDGES
11.03 TEMPORARY STRUCURES FOR THE PRORECTION OF THE PUBLIC
11.05 PILE DRIVING CAP AND HAMMER INFORMATION
11.10 EARTHWORK FOR STRUCTURES
11.11 EXCAVATION
11.12 BACKFILLING STRUCTURES
Culverts
Bridge Abutments
Measurement and Payment
11.20 FOUNDATIONS
11.21 STAKING AND CHECKING LOCATIONS OF STRUCTURES
Check and Double Check
Documentation
Common Survey Errors to Avoid
Encountering Old Substructures
Setting Bench Marks (Post Construction)
11.22 PILING AND PILE DRIVING
Pile Driving
Vibratory Hammers
Gravity Hammers
Diesel Hammers
Bearing and Penetration
Retaps
Dynamic Pile Analyzer
Static Load Tests
11.23 SPLICING PILE
Welding Steel Pile
Concrete Pile
11.24 PILING ACCEPTANCE
Steel Pile
Wood Pile
Steel Pile Cutoffs
11.25 WAVE EQUATION
Hammer Data Form
Driving Graphs
Log of Piling Driven
11.26 PREBORED HOLES
Typical Preboring
Special Prebore Situations
Bentonite
11.27 DRILLED SHAFTS
11.30 BRIDGES
11.31 FALSEWORK
Temporary Fastenings
Falsework Plans
Falsework Inspection
Falsework Foundations
Materials
Project Quality
Miscellaneous Items
Falsework Adjacent to Traffic
Field Changes
Inspection During Concrete Placement
Removal of Falsework
11.32 BRIDGES - STEEL BEAM
Prebolting Meeting
Erecting Steel Beams
High Strength Fasteners
Painting
11.33 BRIDGES - CONCRETE BEAM
Precast - Prestressed Deck Panels
Pretensioned Prestressed Concrete Beam (PPC Beam
Erection)
Diaphragms (Steel or Concrete)
11.40 REINFORCEMENT
General Placement Guidelines for Bridge Reinforcing Steel
11.41 PLACEMENT AND CHECKING (BRIDGE FLOORS)
Slab Thickness
Clearance of Bottom Reinforcement
Clearance of Top Mat Reinforcement
Cover Over Top Mat of Reinforcement
Slab Bridges
Special Attention Areas
11.42 EPOXY COATED REINFORCEMENT
Care and Handling
Field Inspection
Repair of Damaged Coating
11.43 CAGE STEEL (DRILLED SHAFTS)
11.44 SPLICING
Splice Approval
11.45 PAYMENT FOR REINFORCING STEEL
11.50 CONCRETE (STRUCTURAL, CLASS X, AND FLOWABLE MORTAR)
11.51 PCC PLANT PAGE (FORMS 800240E and 800240M)
11.52 USE OF READY MIXED STRUCTURAL CONCRETE
Prepour Meeting
Inspector's Checklist
11.53 ADMIXTURES
Air Entraining Admixtures
Water Reducing Admixtures - Regular
Water Reducing Admixtures - Super Plasticizers
Retarding Admixtures
Accelerating Admixtures
Corrosion Inhibiting Admixtures
Finely Divided Mineral Admixtures
Pozzolanic Materials
Fly Ash (Class C & F)
Silica Fume
Cementitious Materials
Ground Granulated Blast Furnace Slag (GGBFS)
11.54 USE OF INSULATED FORMS FOR PROTECTION
Checking Temperature of Concrete
11.55 DECK PLACEMENT AND HEAT OF HYDRATION
Deck Placement
Deck Concrete Temperature and Curing
Placement Considerations
Field Documentation
Heat of Hydration
11.56 PLACEMENT METHODS (PUMPING, BELTING, AND CRANE BUCKET)
Crane and Bucket
Belt Placement
Pump Placement
11.57 FORM REMOVAL
Setting Beams
11.58 CLASS 3 CONCRETE SURFACE FINISH (RAIL AND BEAMS)
Approval of Materials
Application of Finish
Concrete Railings
11.59 FLOWABLE MORTAR
Backfilling Culverts - Typical Grading
Plugging Culverts
Backfilling Culverts - Under Bridges
Filling Voids Between Culverts
11.60 DECKS AND OVERLAYS
11.61 DECK OVERLAY PREPARATION
Class A Floor Repair
Class A Surface Preparation
Work on Adjacent Lanes
11.62 SEQUENCE OF POURING
Use of Retarders
Concrete Bridge Floors
Placement Methods
11.63 INSTALLATION OF JOINTS
Preformed Neoprene Joints
Steel Extruded Expansion Joints (Strip Seals)
11.64 BRIDGE FLOORS
Finishing and Equipment
Profile Grades - Overlays
Transverse Grooving
Missed Texturing
11.65 CONCRETE
Concrete Mobile Mixers
Frequency of Checks
Density Testing
11.66 APPROACH SECTIONS
Approach Pavements to Bridge Abutments
"Movable" Abutments
"Fixed" Abutments
Bridge Approach Tapers
Shoulder Maintenance
11.67 SMOOTHNESS OF BRIDGE DECKS
Checklist
Specification 2317
Surface Checking
11.70 BARRIER RAILS
11.71 CONCRETE F-SHAPE, OPEN, AND RETROFIT RAIL
Rail Concrete Placement and Bridge Deck Falsework
11.72 SLIP FORM BARRIER RAIL
Longitudinal Cracks
Reinforcement
Reinforcement Bar Cover
Misalignment and Nonuniform Top Elevation
Shadowing
Mix Design for Slip Form and Cast-in-Place
Curing of Slip Form Barrier Rail
Expansion Joint Construction In Barrier Rail
11.73 CAST-IN-PLACE (RETROFIT) BARRIER RAIL
Preventing Dowel Installation Damage of Conduit
11.74 CAST-IN-PLACE OPEN BARRIER RAIL FORM REMOVAL
11.80 REINFORCED CONCRETE CULVERTS
11.81 DESIGN CHANGES ON CULVERTS
11.82 INSTALLING REINFORCING STEEL, PLACING CONCRETE, AND FORM REMOVAL
Installing Reinforcing Steel
Placing Concrete
Removal of Wall Forms
Removal of Slab Forms
11.83 BOX CULVERT CURTAIN WALLS
Sheet Pile Curtain Wall
Reinforcement Placement
11.84 BOX CULVERT BELL JOINTS