Section 2203. Hot Mix Asphalt Base.
2203.01 DESCRIPTION.
This work consists of construction of a HMA base, as specified, upon a prepared or
corrected subgrade or a previously constructed base or subbase. It shall be built to
the dimensions shown in the contract documents and in accordance with requirements of
Section 2303.
2203.02 METHOD OF MEASUREMENT AND BASIS OF PAYMENT.
The various items involved in the construction of a HMA base, will be measured and paid
for as provided in Article 2303.05 and
Article 2303.06.