Sampling and Testing Guide-Minimum Frequency

CONCRETE BRIDGE FLOOR REPAIR & OVERLAY & SURFACING

Section 2413 

MATERIAL OR

CONSTRUCTION ITEM

 

TESTS

METHOD OF

ACCEPTANCE

&

RELATED IMs

QUALITY CONTROL

INDEPENDENT ASSURANCE & VERIFICATION S&T

REMARKS

SAMPLE

BY

FREQ.

SAMPLE SIZE

TEST BY

REPORT

S&T TYPE

SAMPLE BY

FREQ.

SAMPLE SIZE

TEST BY

REPORT

SOURCE INSPECTION

Aggregates-Fine (4110)

 

AS

 209

 

 

 

 

 

 

 

 

 

 

 

 

Aggregates-Coarse (4115)

 

 

AS

209

 

 

 

 

 

 

 

 

 

 

 

 

Portland Cement (4101)

Quality

AS

401

 

 

 

 

 

 

 

 

 

 

 

 

GGBFS (Ground Granulated Blast Furnace Slag)

Quality

AS

491.14

 

 

 

 

 

 

 

 

 

 

 

For HPC-O

Fly Ash (4108)

Quality

 

AS 

491.17

 

 

 

 

 

 

 

 

 

 

 

For HPC-O

Mixing Water (4102)

Quality

Lab Tested

 

 

 

 

 

 

V

RCE

1/source

1 qt.

CTRL

 

Not needed for potable Municipal Water

Air Entraining Admixture (4103)

Quality

 

AS

403

 

 

 

 

 

 

 

 

 

 

 

 

Water Reducing Admixture (4103)

Quality

 

AS

403

 

 

 

 

 

 

 

 

 

 

 

 

Retarding Admixture (4103)

 

AS

403

 

 

 

 

 

 

 

 

 

 

 

 

Curing Compound (4105)

Lab Tested

405

 

 

 

 

 

V

DME

1/batch

1 pt

CTRL

 

Sample lots not previously reported

PLANT INSPECTION

Aggregate-Fine (4110)

 

AS

Cert

CONTR

IM 528

CONTR

RCE

1/project

20 lb

RCE

When ready mixed concrete is used

Aggregate-Coarse (4115)

Quality

 

AS

Cert

 

 

 

 

 

V

DME

1/project

50 lb

CTRL

 

DME may adjust frequency

Gradation

 

 

CONTR

IM 528

CONTR

 

V

RCE

1/project

20 lb

RCE

 

When ready mixed concrete is used

Portland Cement (4101)

Quality

AS

Cert

 

 

 

 

 

V

DME

1/project

15 lb

CTRL

 

 

AS-Approved Source                                                  Cert- Certification Statement                        RCE-Resident Construction Engineer/Project Engineer                        IA-Independent Assurance

ASD-Approved Shop Drawing                                                                                                          DME-District Materials Engineer                                                                V-Verification

S&T-Sampling & Testing                                                                                                                    CTRL-Central Materials Office                                                                  

                                                                                                                                                              CONTR-Contractor 

 


 

 

MATERIAL OR

 CONSTRUCTION ITEM

 

 

 

TESTS

 

METHOD OF

ACCEPTANCE

&

RELATED IMs

 

QUALITY CONTROL

 

INDEPENDENT ASSURANCE
& VERIFICATION S&T

 

REMARKS

 

 

SAMPLE

BY

 

FREQ.

 

SAMPLE

SIZE

 

TEST

BY

 

REPORT

 

S&T

TYPE

 

SAMPLE

BY

 

FREQ.

 

SAMPLE SIZE

 

TEST

BY

 

REPORT

 

PLANT INSPECTION (cont)

GGBFS(Ground Granulated Blast Furnace Slag)

Quality

AS                  Cert

 

Each Load

 

 

 

 

 

 

 

 

 

For HPC-O

Fly Ash

Quality

AS                   Cert

 

Each Load

 

 

 

 

 

 

 

 

 

For HPC-O

Air Entraining Admixture (4103)

 

AS                    403

 

 

 

 

 

V

RCE

Each batch

1 pt

CTRL

 

Sample if not previously reported

Water Reducing Admixture (4103)

 

AS                    403

 

 

 

 

 

V

RCE

Each batch

1 pt

CTRL

 

Sample if not previously reported

Retarding Admixture (4103)

 

AS                    403

 

 

 

 

 

V

RCE

Each batch

1 pt

CTRL

 

Sample if not previously reported

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AS-Approved Source                                                  Cert- Certification Statement                        RCE-Resident Construction Engineer/Project Engineer                                                                                      IA-Independent Assurance

ASD-Approved Shop Drawing                                                                                                          DME-District Materials Engineer                                                                                      V-Verification

S&T-Sampling & Testing                                                                                                                    CTRL-Central Materials Office                                                              

                                                                                                                                                              CONTR-Contractor

 


 

 

MATERIAL OR

 CONSTRUCTION

ITEM

 

 

 

TESTS

 

METHOD OF

ACCEPTANCE

&

RELATED IMs

 

QUALITY CONTROL

 

INDEPENDENT ASSURANCE
& VERIFICATION S&T

 

REMARKS

 

 

SAMPLE

BY

 

FREQ.

 

SAMPLE

SIZE

 

TEST

BY

 

REPORT

 

S&T

TYPE

 

SAMPLE

BY

 

FREQ.

 

SAMPLE SIZE

 

TEST

BY

 

REPORT

 

GRADE INSPECTION

Plastic Concrete (2413)

Air

                     318, 327

 

 

 

 

 

 V

RCE

1/100 sy(2)

 

RCE

 

1/ 30yd3 for ready mix, min 1/day

Slump

                     317, 327

 

 

 

 

 

 V

RCE

1/100 sy(2)

 

RCE

 

1/ 30yd3 for ready mix, min 1/day

Density

                            358

 

 

 

 

 

 V

RCE

See Note

 

RCE

 

For Class O PCC only.(1)

Thickness

                                

 

 

 

 

 

 

RCE

3/50 sy

 

RCE

 

 

Cylinders

                                

 

 

 

 

 

V

DME

3/project

 

DME

 

Primary Projects only

(Information Only)

Concrete Sealer (2413.03, G)

Quality

AS                    491.12

 

 

 

 

 

 

 

 

 

 

 

 

Hardened

Concrete

Smooth-ness

 

                         341

CONTR

100%

 

CONTR

 

V

DME

10%

 

DME

 

 

 

 

                                

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                                

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                                

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                                

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                                

 

 

 

 

 

 

 

 

 

 

 

 

AS-Approved Source                                                    Cert- Certification Statement                      RCE-Resident Construction Engineer/Project Engineer                        IA-Independent Assurance

ASD-Approved Shop Drawing                                                                                                          DME-District Materials Engineer                                                                V-Verification

S&T-Sampling & Testing                                                                                                                    CTRL-Central Materials Office                                                                  

                                                                                                                                                              CONTR-Contractor

(1)    Nuclear density testing frequency for each placement shall be one test within 5 feet of the beginning and end of the placement and additional tests shall be equally spaced a maximum of 100 feet throughout the length of the placement.  Each placement shall have a minimum of three nuclear density tests.

(2)    For Class O on daily pours of more than 300 square yards, the minimum frequency will be 1 test per 100 square yards for the first 300 square yards, then 1 test for every 300 square yards for the remainder of the day’s pour.