PCC STRUCTURAL - FIELD AND PLANT SAMPLING AND TESTING GUIDE

(See Specifications for Complete Details.)

 

 

Field Acceptance

Plant Acceptance

 

Article

Work Type

Air & Slump

Gradation QC

Gradation Verification

2403

Structural Concrete

1/30 yd3 (2)

S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks

S/T 1st/wk; S 1/wk  or S 1/2 wks if <50 yd3/wk , T 20%

2405

Foundations

1/30 yd3 (2)

S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks

S/T 1st/wk; S 1/wk  or S 1/2 wks if <50 yd3/wk , T 20%

2406

Concrete Structures

1/30 yd3

S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks

S/T 1st/wk; S 1/wk  or S 1/2 wks if <50 yd3/wk , T 20%

2412

Bridge Decks

1/30 yd3 (2)

S/T 1/deck pour

S/T 1/deck pour

2413

Deck Repair

1/30 yd3

S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks

S/T 1st/wk; S 1/wk  or S 1/2 wks if <50 yd3/wk , T 20%

2413

Deck Surfacing/Overlay HPC-O

1/30 yd3

S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks

S/T 1/project

2413

Deck Surfacing/Overlay Class O

1/100 yd2 (4)

n/a

n/a

2414

Railings

1/30 yd3

S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks

S/T 1st/wk; S 1/wk  or S 1/2 wks if <50 yd3/wk , T 20%

2415

Box, Arch Circular Culverts

1/30 yd3

S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks

S/T 1st/wk; S 1/wk  or S 1/2 wks if <50 yd3/wk , T 20%

2416

Rigid Pipe Culverts

1/30 yd3

S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks

S/T 1st/wk; S 1/wk  or S 1/2 wks if <50 yd3/wk , T 20%

2423

Support Structures

1/30 yd3

S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks

S/T 1st/wk; S 1/wk  or S 1/2 wks if <50 yd3/wk , T 20%

2424

Shotcrete

S/T for Field Test design mix

n/a

2433

Drilled Shaft

1/30 yd3 (2)

S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks

S/T 1st/wk; S 1/wk  or S 1/2 wks if <50 yd3/wk , T 20%

2503

Storm Sewers

1/30 yd3

S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks

S/T 1st/wk; S 1/wk  or S 1/2 wks if <50 yd3/wk , T 20%

2503

intakes, utility access

1/30 yd3

S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks

n/a

2501

Pile encasement

1/30 yd3

S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks

S/T 1st/wk; S 1/wk  or S 1/2 wks if <50 yd3/wk , T 20%

2505

Guardail anchorage

1/30 yd3

S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks

n/a

2513

Concrete barrier

1/30 yd3

S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks

S/T 1st/wk; S 1/wk  or S 1/2 wks if <50 yd3/wk , T 20%

2516

Walls and Steps

1/30 yd3

S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks

S/T 1st/wk; S 1/wk  or S 1/2 wks if <50 yd3/wk , T 20%

 

(2) On large structural placements >350 yd3, the DME may adjust air and slump testing to 1/50 yd3 based on consistent results in the first 100 yd3 placed

(4) See 204 Appendix M for overlays >300 yd2.