PCC STRUCTURAL - FIELD AND PLANT SAMPLING AND TESTING GUIDE (See Specifications for Complete Details.) |
||||
|
|
Field Acceptance |
Plant Acceptance |
|
Article |
Work Type |
Air & Slump |
Gradation QC |
Gradation Verification |
Structural Concrete |
1/30 yd3 (2) |
S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks |
S/T 1st/wk; S 1/wk or S 1/2 wks if <50 yd3/wk , T 20% |
|
Foundations |
1/30 yd3 (2) |
S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks |
S/T 1st/wk; S 1/wk or S 1/2 wks if <50 yd3/wk , T 20% |
|
Concrete Structures |
1/30 yd3 |
S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks |
S/T 1st/wk; S 1/wk or S 1/2 wks if <50 yd3/wk , T 20% |
|
Bridge Decks |
1/30 yd3 (2) |
S/T 1/deck pour |
S/T 1/deck pour |
|
Deck Repair |
1/30 yd3 |
S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks |
S/T 1st/wk; S 1/wk or S 1/2 wks if <50 yd3/wk , T 20% |
|
Deck Surfacing/Overlay HPC-O |
1/30 yd3 |
S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks |
S/T 1/project |
|
Deck Surfacing/Overlay Class O |
1/100 yd2 (4) |
n/a |
n/a |
|
Railings |
1/30 yd3 |
S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks |
S/T 1st/wk; S 1/wk or S 1/2 wks if <50 yd3/wk , T 20% |
|
Box, Arch Circular Culverts |
1/30 yd3 |
S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks |
S/T 1st/wk; S 1/wk or S 1/2 wks if <50 yd3/wk , T 20% |
|
Rigid Pipe Culverts |
1/30 yd3 |
S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks |
S/T 1st/wk; S 1/wk or S 1/2 wks if <50 yd3/wk , T 20% |
|
Support Structures |
1/30 yd3 |
S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks |
S/T 1st/wk; S 1/wk or S 1/2 wks if <50 yd3/wk , T 20% |
|
Shotcrete |
S/T for Field Test design mix |
n/a |
||
Drilled Shaft |
1/30 yd3 (2) |
S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks |
S/T 1st/wk; S 1/wk or S 1/2 wks if <50 yd3/wk , T 20% |
|
Storm Sewers |
1/30 yd3 |
S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks |
S/T 1st/wk; S 1/wk or S 1/2 wks if <50 yd3/wk , T 20% |
|
intakes, utility access |
1/30 yd3 |
S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks |
n/a |
|
Pile encasement |
1/30 yd3 |
S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks |
S/T 1st/wk; S 1/wk or S 1/2 wks if <50 yd3/wk , T 20% |
|
Guardail anchorage |
1/30 yd3 |
S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks |
n/a |
|
Concrete barrier |
1/30 yd3 |
S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks |
S/T 1st/wk; S 1/wk or S 1/2 wks if <50 yd3/wk , T 20% |
|
Walls and Steps |
1/30 yd3 |
S/T 1/week, if <50 yd3/wk S/T 1/ 2 weeks |
S/T 1st/wk; S 1/wk or S 1/2 wks if <50 yd3/wk , T 20% |
|
(2) On large structural placements >350 yd3, the DME may adjust air and slump testing to 1/50 yd3 based on consistent results in the first 100 yd3 placed (4) See 204 Appendix M for overlays >300 yd2. |