Electronic Reference Library
Standard Road Plans - TC Series
Traffic Control
English
Metric
PDF
PDF
General
TC-1
Work Not Affecting Traffic
—
TC-30
Closure of Continuous Two-Way Left Turn Lane (TWLTL)
—
TC-61
Two-Lane, Two-Way Operation
—
TC-62
Permanent Two-Lane to Four-Lane Transition
—
TC-81
Restricted Width Signing
—
Two-Lane Roadways
TC-202
Shoulder Closure
—
TC-203
Aerial Seeding Operations
—
TC-211
Spot Location Lane Closure with Stop Signs
—
TC-212
Spot Location Lane Closure with Flaggers
—
TC-213
Lane Closure with Flaggers
—
TC-214
Lane Closure with Flaggers for use with Pilot Car
—
TC-216
Lane Closure with Signals
—
TC-217
Lane Closure with Signals and TBR
—
TC-228
Lane Closure Utilizing Continuous Two-Way Left Turn Lane
—
TC-231
Slow Moving Vehicle Operations in the Traffic Lane
—
TC-232
Shoulder Rumble Strip Operations
—
TC-233
Pavement Marking Operations
—
TC-251
Temporary Road Closure
—
TC-252
Road Closure
—
TC-253
Paved On-Site Detour
—
TC-271
Signalized Equipment Crossing
—
TC-272
Unsignalized Equipment Crossing
—
TC-273
Construction Site Entrance
—
TC-282
Uneven Lanes
—
TC-283
Surveying Operations
—
Multi-Lane Roadways
TC-402
Shoulder Closure
—
TC-403
Aerial Seeding Operations
—
TC-416
Partial Lane Closure on Ramps
—
TC-417
Ramp Closure
—
TC-418
Lane Closure on Divided Highway
—
TC-419
Lane Closure on Undivided Highway
—
TC-420
Lane Closure at Ramps
—
TC-421
Lane Closure with TBR
—
TC-422
Closure of Two Adjacent Lanes on Divided Highway
—
TC-423
Closure of Two Adjacent Lanes on Undivided Highway
—
TC-429
Closure of Continuous Two-Way Left Turn Lane and/or Adjacent Lane
—
TC-431
Slow Moving Vehicle Operating in the Traffic Lane
—
TC-432
Shoulder Rumble Strip Operations
—
TC-433
Pavement Marking Operations
—
TC-451
Temporary Road Closure on Divided Highway
—
TC-454
Temporary Detour Using Ramps on Divided Highway
—