RJ (Metric)

Flexible Pavements

RJ-1m           Void
RJ-2-26Cm  Void
RJ-26Dm      Type "A" and "B" Granular Surfaced Shoulder (Adjacent to HMA Pavement)
RJ-31-32m   Void
RJ-33m         Paved Shoulder 200 mm HMA (Adjacent to HMA Pavement)
RJ-34m         Partially Paved Shoulders (150 mm HMA)

RAm   Storm and Sanitary Sewer Structures
RBm   Incidental Construction: Steps, Curbs, Drives, Etc.
RCm   Erosion Control, Roadside Development, Fencing
RDm   Signs (Use English Versions)
REm   Guardrail, Barricades
RFm   Drainage (Use English Versions)
RGm   Pavement Widening, Resurfacing and Associated Work
RHm   Rigid Pavements and Associated Work
RJm    Flexible Pavements and Associated Work
RKm   Bridge Approach Pavement
RLm    Excavation, Embankment, Soils and Associated Work
RMm   Highway Lighting, Associated Work and Appurtenances
RPm   Roadway Superelevation
RRm   Pavement Rehabilitation (Use English Versions)
RVm   Geometric Details
TCm   Traffic Control (Use English Versions)