Bridge Approach Pavement
|
English
|
|
|
PDF
|
DGN
|
|
Entire Section
|
|
—
|
|
Single Reinforced
|
BR-101
|
Bridge Approach Section (General Details)
|
|
|
|
BR-102
|
Bridge Approach Section (Two-Lane, Abutting PCC Pavement)
|
|
|
|
BR-103
|
Bridge Approach Section (Two-Lane for Bridge Reconstruction, PCC Pavement)
|
|
|
|
BR-104
|
Bridge Approach Section (at Existing Bridges, PCC Pavement)
|
|
|
|
BR-105
|
Bridge Approach Section (Two-Lane, HMA Pavement)
|
|
|
|
BR-106
|
Bridge Approach Section (Two-Lane for Bridge Reconstruction, HMA Pavement)
|
|
|
|
BR-107
|
Bridge Approach Section (at Existing Bridges, HMA Pavement)
|
|
|
|
BR-110
|
PCC Overlay of Bridge Approach Section
|
|
|
|
BR-112
|
Bridge Approach Details (in Conjunction with Bridge Deck Overlay)
|
|
|
|
BR-121
|
Bridge Approach Details (Secondary Roads)
|
|
|
|
Double Reinforced
|
BR-201
|
Double Reinforced 10" Approach
|
|
|
|
BR-202
|
Double Reinforced 10" Approach with Variable Depth Paving Notch
|
|
|
|
BR-203
|
Double Reinforced 12" Approach
|
|
|
|
BR-204
|
Double Reinforced 12" Approach with Variable Depth Paving Notch
|
|
|
|
BR-205
|
Double Reinforced 12" Approach (Slab Bridge)
|
|
|
|
BR-211
|
Bridge Approach (Abutting PCC or Composite Pavement)
|
|
|
|
BR-212
|
Bridge Approach (Abutting HMA Pavement)
|
|
|
|
BR-213
|
Bridge Approach (Abutting Pavement)
|
|
|
|
BR-231
|
Bridge Approach (Multi-Lane, Curbed Roadway)
|
|
|
|
BR-241
|
Double Reinforced 10” Approach on Gravel Road
|
|
|
|