Pavement Rehabilitation
|
English
|
|
|
PDF
|
DGN
|
|
Entire Section
|
|
—
|
|
Patches
|
PR-101
|
Full Depth Patch with 'EF' Joint in PCC
|
|
|
|
PR-102
|
Full Depth PCC Patch Without Dowels
|
|
|
|
PR-103
|
Full Depth PCC Patch with Dowels
|
|
|
|
PR-104
|
Full Depth Patch Continuous Reinforced PCC Pavement
|
|
|
|
PR-105
|
Full Depth Ramp PCC Patch With Dowels
|
|
|
|
PR-107
|
Partial Depth PCC Finish Patches
|
|
|
|
PR-109
|
Cross Stitching of PCC Pavement
|
|
|
|
Cracks and Joints
|
PR-110
|
PCC Crack and Joint Cleaning and Filling
|
|
|
|
Culverts
|
PR-120
|
Double Reinforced Pavement Over Box Culverts
|
|
|
|
PR-121
|
Reinforced Concrete Panel At Box Culverts
|
|
|
|
Subbases
|
PR-140
|
Subbase Patches
|
|
|
|
Miscellaneous
|
PR-201
|
Runouts for Resurfacing
|
|
|
|
PR-202
|
Notches for Resurfacing (With or Without runout)
|
|
|
|