Shade denotes change from the previous issue

IM INDEX

April 21, 2015

Supersedes October 21, 2014

 

 

 

 

 

101

K. Jones

Review of Materials used in Construction & Maintenance Projects

October 21, 2014

1

 

 

App. A  Guidelines for Waiving Material

April 15, 2014

1

 

 

 

 

 

103

K. Jones

Reimbursement to IDOT for Inspection Services Provided to Counties, Cities, and Other State Agencies

October 21, 2014

1

 

 

App. A  Inspection Costs

October 21, 2014

1

 

 

 

 

 

104

K. Jones

Field Equipment Cleaning, Calibration & Repair

April 21, 2015

1

 

 

App. A  Fees

April 21, 2015

1

 

 

 

 

 

107

K. Jones

Buy America

April 21, 2015

1

 

 

 

 

 

202

K. Jones

Procedure for Rounding Data

April 20, 2010

1

 

 

 

 

 

203

K. Jones

Consultation Provided by Materials Personnel on Construction Projects

April 20, 2004

2

 

 

 

 

 

204

K. Jones

Inspection of Construction Project Sampling & Testing

October 21, 2014

2

 

 

App. A (US) Roadway & Borrow Excavation & Embankments

April 21, 2015

2

 

 

App. B  (US) Soil Aggregate Subbase

April 15, 2014

2

 

 

App. C  (US) Modified Subbase

April 15, 2014

2

 

 

App. D  (US) Granular Subbase

April 15, 2014

2

 

 

App. E  (US) PCC Pavement, etc.

April 21, 2015

2

 

 

App. F  (US) Hot Mix Asphalt

April 15, 2014

2

 

 

App. H  (US) Structural Concrete, etc.

April 21, 2015

2

 

 

App. I  Concrete Drilled Shaft Foundations

April 15, 2014

2

 

 

App. K  (US) Cold-In-Place Recycled Asphalt Pavement

April 15, 2014

2

 

 

App. L  (US) Granular Surfacing/Driveway Surfacing

April 15, 2014

2

 

 

App. M  Concrete Bridge Floor Repair

October 15, 2013

2

 

 

App. P  (US) Surface Treatments

April 15, 2014

2

 

 

App. T  Base Repair, Pavement Repair

April 15, 2014

2

 

 

App. U  (US) Granular Shoulders

April 15, 2014

2

 

 

App. V  (US) Subdrains

April 15, 2014

2

 

 

App. W  Water Pollution/Erosion Control

April 15, 2014

2

 

 

App. X  Acceptance-Small Quantities of Mtrls.

October 21, 2014

2

 

 

App. Z  Supp. Guide–Basis of Acceptance

April 21, 2015

2

 

 

 

 

 

205

K. Jones

Quality Assurance Program for Construction Overview & Description

April 21, 2015

2

 

 

 

 

 

206

P. Hockett

Nuclear Test Equipment

October 16, 2012

2

 

 

App. B  TLD Badge Certification

April 20, 2004

2

 

 

App. D  Shipping Documents

October 18, 2011

2

 

 

App. E  Emergency Procedures

October 18, 2011

2

 

 

 

 

 

207

K. Jones

Independent Assurance Program for Construction Overview & Description

April 21, 2015

2

 

 

App. A  IAP Responsibilities

April 21, 2015

2

 

 

 

 

 

208

K. Jones

Materials Laboratory Qualification Program

April 21, 2015

2

 

 

App. A  Dist. Lab Accreditation Program

April 21, 2015

2

 

 

App. B  Laboratory Qualification Program

April 21, 2015

2

 

 

App. C  Proficiency & Testing for HMA

April 21, 2015

2

 

 

 

 

 

209

B. Gossman

Certified Aggregates & Approved Producer Program

April 21, 2015

4

 

 

App. A  Guidelines-Producer QC Program

October 21, 2014

4

 

 

App. B  Approved Aggregate Producers

April 21, 2015

4

 

 

App. C  Spec. Limits & Samp.&Testing Guide

October 21, 2014

4

 

 

App. D  Aggregate Gradation Table

April 21, 2015

4

 

 

App. E  Notification of IM 209 Violation

April 17, 2007

4

 

 

App. F  District Materials Duties

October 21, 2008

4

 

 

App. G  Application for Approval of Electronic Signature

October 21, 2014

4

 

 

App. H  Approved Electronic Signatures

April 21, 2015

4

 

 

App. I Guidelines for Recertification of Stockpiles

NEW ISSUE

4

 

 

 

 

 

210

B. Gossman

Production of Certified Aggregate from Reclaimed Roadways

October 21, 2014

4

 

 

 

 

 

211

T. Hanson

Approved Ready Mix Concrete Producer Program

April 15, 2014

2

 

 

App. A  Guidelines for Ready Mix Concrete Producer QC Program

April 15, 2014

2

 

 

App B  Ready Mix Concrete Producer Approval Application

October 21, 2014

2

 

 

App. C  Notification of IM 211 Violation

October 15, 2013

2

 

 

App D  Approved Ready Mix Concrete Producers

October 21, 2014

2

 

 

 

 

 

213

C. Anderson

Technical Training & Certification Program

April 21, 2015

2

 

 

App. A  Certification Levels

October 15, 2013

2

 

 

App. B  Unsatisfactory Performance Notice

October 15, 2013

2

 

 

App. C  Certified Technicians Qualifications

October 15, 2013

2

 

 

App. D  Technician Duties

April 21, 2015

2

 

 

 

 

 

215

J. Putherickal

Disposal of Hazardous Wastes from Materials Laboratories

October 19, 2004

1

 

 

App. A  Hazardous Waste Labels

April 20, 2004

1

 

 

App. B  Placement of Labels on Drums

April 19, 2005

1

 

 

 

 

 

216

K. Jones

Guidelines for Validating Test Results

April 21, 2015

2

 

 

App. A  PCC Grad. Comparison Report

October 21, 2008

2

 

 

 

 

 

217

J. Omundson

Guidelines for Reviewing Demolition Sites for Possible Asbestos-containing Material

October 17, 2006

1

 

 

 

 

 

218

K. Jones

Materials Sample Courier Service

April 21, 2015

1

 

 

 

 

 

301

C. Ouyang

Aggregate Sampling & Minimum Size of Samples for Sieve Analysis

April 21, 2015

2

 

 

 

 

 

302

C. Ouyang

Sieve Analysis of Aggregates

October 18, 2011

2

 

 

 

 

 

305

C. Ouyang

Field Method to Determine Percentage of Fractured Particles in Coarse Aggregate Levels

April 20, 2004

2

 

 

 

 

 

306

C. Ouyang

Determining Amount of Material Finer than the No. 200 (75 µm) Sieve in Aggregate

October 18, 2011

2

 

 

 

 

 

307

C. Ouyang

Determining Specific Gravity of Aggregate

April 19, 2005

2

 

 

 

 

 

308

C. Ouyang

Determining Free Moisture & Absorption of Aggregates

October 19, 2004

2

 

 

 

 

 

309

C. Ouyang

Determining Standard Proctor Moisture Density Relationship of Soils

April 16, 2013

2

 

 

 

 

 

310

C. Ouyang

Determining Modified Proctor Moisture Density Relationship of Soils

October 16, 2012

2

 

 

 

 

 

311

B. Gossman

Method of Sampling Aggregate from the Roadway

April 20, 2004

2

 

 

 

 

 

312

C. Ouyang

Sampling of Soils for Construction Project

April 16, 2013

2

 

 

 

 

 

313

C. Ouyang

Determining Minimum and Maximum Index of Densities of Cohesionless Soils and Calculation of Relative Density

April 15, 2014

2

 

 

 

 

 

315

T. Hanson

Method of Making, Protecting, Curing & Testing Concrete Cylinders

October 21, 2014

2

 

 

 

 

 

316

T. Hanson

Flexural Strength of Concrete

April 16, 2013

2

 

 

App. A  (US) Concrete Beam Coefficients

April 16, 2013

2

 

 

 

 

 

317

T. Hanson

Slump of Hydraulic Cement Concrete

April 19, 2011

2

 

 

 

 

 

318

T. Hanson

Air Content of Freshly Mixed Concrete by Pressure

April 21, 2015

2

 

 

 

 

 

319

S Schram

Moisture Sensitivity Testing of Asphalt Mixtures

April 21, 2015

2

 

 

 

 

 

320

S Schram

Method of Sampling Compacted Asphalt Mixtures

April 19, 2005

2

 

 

 

 

 

321

T. Siefken

Method of Test for Compacted Density of Hot Mix Asphalt (HMA)(Displacement)

April 15, 2003

2

 

 

 

 

 

322

S Schram

Sampling Uncompacted Hot Mix Asphalt

April 21, 2015

2

 

 

 

 

 

323

S Schram

Method of Sampling Asphaltic Materials

April 15, 2003

2

 

 

 

 

 

324

S Schram

Determining the Moisture Content of Rap for use in HMA

October 20, 2009

2

 

 

 

 

 

325

T. Siefken

Compacting Asphalt Concrete by the Marshall Method

October 18, 2005

2

 

 

 

 

 

325G

T. Siefken

Method of Test for Determining the Density of Hot Mix Asphalt (HMA) using the Superpave Gyratory Compactor (SGC)

October 18, 2011

2

 

 

 

 

 

326

C. Ouyang

Determining Density of Undisturbed Soil Cores by Displacement

October 19, 2004

2

 

 

 

 

 

327

T. Hanson

Sampling Freshly Mixed Concrete

October 18, 2011

2

 

 

 

 

 

328

T. Hanson

Making, Protecting & Curing Concrete Flexural Strength Field Specimens

April 21, 2015

2

 

 

 

 

 

330

T. Siefken

Vacuum Extraction of Bitumen in Paving Mixtures

October 17, 2006

2

 

 

 

 

 

331

T. Siefken

Mechanical Analysis of Extracted Aggregate

October 19, 2004

2

 

 

 

 

 

332

J. Putherickal

Measuring Coating Thickness by Magnetic Gauge

October 19, 2004

3

 

 

 

 

 

334

P. Hockett

Determining Moisture Content & Density of Soils, Bases & Subbases with a Nuclear Gauge

April 21, 2015

2

 

 

 

 

 

335

C. Ouyang

Determining Moisture Content of Soils

April 16, 2013

2

 

 

 

 

 

336

C. Ouyang

Methods of Reducing Aggregate Field Samples to Test Samples

October 18, 2011

2

 

 

 

 

 

337

S. Schram

Method to Determine the Thickness of Completed Courses of Base, Subbase, & Hot Mix Asphalt

April 15, 2003

2

 

 

 

 

 

338

T. Siefken

Determining Asphalt Binder Content & Determining Asphalt Binder Content & by the Ignition Method

October 21, 2008

2

 

 

 

 

 

339

C. Ouyang

Determining the Amount of Silt in Fine Aggregate

October 19, 2004

2

 

 

 

 

 

340

T. Hanson

Weight per Cubic Foot, Yield, & Air Content (Gravimetric) of Concrete

April 21, 2015

2

 

 

 

 

 

341

J. Omundson

Determining Pavement & Bridge Ride Quality

October 15, 2013

2

 

 

 

 

 

342

J. Putherickal

Determining Moisture in Rock Salt

October 17, 2006

2

 

 

 

 

 

344

C. Ouyang

Determining the Amount of Shale in Fine Aggregate

October 19, 2004

2

 

 

 

 

 

345

C. Ouyang

Determining the Amount of Shale in Coarse Aggregate

October 19, 2004

2

 

 

 

 

 

346

T. Hanson

Locating, Drilling & Evaluating Portland Cement Concrete Pavement Cores

April 15, 2014

2

 

 

App. A  Sample Calculations

April 16, 2013

2

 

 

App. B  Instructions for Completion of Reports

April 16, 2013

2

 

 

 

 

 

347

T. Hanson

Measuring Length of Drilled Concrete Cores

October 19, 2010

2

 

 

 

 

 

348

J. Arjes

Performing the Sieve Test on Emulsified Asphalts

October 21, 2003

2

 

 

 

 

 

349

J. Arjes

Determining Compatibility of Rapid-Setting Asphalt Emulsions & Aggregates

April 19, 2005

2

 

 

 

 

 

350

T. Siefken

Determining Maximum Specific Gravity of Hot Mix Asphalt (HMA) Mixtures

April 21, 2009

2

 

 

App. A  Correction Multiplier

October 21, 2003

2

 

 

 

 

 

351

T. Siefken

Determining Asphalt Binder Content In Hot Mix Asphalt (HMA) Mixtures by Calculation

October 17, 2006

2

 

 

App. A  Binder Content Calculation from Gmm

October 19, 2004

2

 

 

 

 

 

357

T. Siefken

Preparation of Hot Mix Asphalt (HMA) Mix Samples for Test Specimens

October 19, 2004

2

 

 

 

 

 

358

C. Ouyang

Determining Plastic Density of Portland Cement Concrete with a Nuclear Gauge

October 18, 2011

2

 

 

 

 

 

360

J. Arjes

Determining Percent Residue of Emulsified Asphalt

April 21, 2015

2

 

 

 

 

 

362

J. Omundson

Determining the Cover over Steel in Bridge Decks

October 17, 2006

2

 

 

 

 

 

363

M. Bortle

Determining the Slope of Pedestrian Facilities

April 21, 2015

2

 

 

 

 

 

365

J. Arjes

Determining Particle Charge of Cationic Emulsified Asphalts

October 17, 2006

2

 

 

 

 

 

366

C. Ouyang

Determining the Adequacy of Test Sieves

October 16, 2007

2

 

 

 

 

 

368

C. Ouyang

Determining the Amount of Clay Lumps & Friable Particles in Course Aggregate

April 16, 2013

2

 

 

 

 

 

369

T. Siefken

Determining Specific Gravity of Asphalt Binder

October 17, 2006

2

 

 

 

 

 

370

T. Siefken

Determining Coating & Stripping of Bitumen Aggregate Mixtures

October 17, 2006

2

 

 

 

 

 

372

C. Ouyang

Determining the Amount of Chert, Shale, Iron Oxide & Coal In Coarse Aggregate

October 17, 2006

2

 

 

 

 

 

373

J. Putherickal

Determining Concentration of Calcium Chloride Solutions by Hydrometer

October 21, 2008

2

 

 

 

 

 

374

J. Arjes

Determining Presence of Anti-Strip Agent Cutback Asphalt (Rapid Field Test)

October 17, 2006

2

 

 

 

 

 

375

C. Ouyang

Determining Flow of Grout Mixtures (Flow Cone Methods)

April 19, 2009

2

 

 

 

 

 

376

J. Putherickal

Testing for Presence of Moisture-Proof Coating on Glass Beads

October 18, 2005

2

 

 

 

 

 

377

J. Putherickal

Determining Weight (Mass) of Ditch & Slope Protection Mats

October 18, 2005

2

 

 

 

 

 

378

J. Putherickal

Determining the Dew Point with A Sling Psychrometer

October 19, 2004

3

 

 

 

 

 

380

T. Siefken

Vacuum-Saturated Specific Gravity & Absorption of Combined or Individual Aggregate Sources

October 19, 2004

2

 

 

App. A  Worksheet

April 19, 2005

2

 

 

 

 

 

381

S. Schram

Determining the Moisture Content of Aggregate and Recycled Materials for use in HMA

April 20, 2010

2

 

 

 

 

 

382

J. Putherickal

Determining Relative Humidity with a Sling Psychrometer

October 18, 2005

2

 

 

 

 

 

383

T. Hanson

Testing the Strength of Portland Cement Concrete Using the Maturity Method

April 21, 2015

2

 

 

 

 

 

384

T. Hanson

Measuring Paver Vibrator Frequency

April 15, 2014

2

 

 

 

 

 

385

T. Hanson

Temperature of Freshly Mixed Concrete

October 21, 2014

2

 

 

 

 

 

386

J. Putherickal

Determining Retroreflectivity of Durable Pavement Markings

October 19, 2004

2

 

 

 

 

 

387

K. Frame

Slurry Test for Drilled Shafts

October 18, 2011

3

 

 

 

 

 

388

K. Frame

Load Cell Test for Drilled Shafts

October 18, 2011

3

 

 

 

 

 

389

T. Hanson

Method of Test Slump Flow and Visual Stability Index of SCC

April 21, 2009

2

 

 

 

 

 

390

T. Hanson

Method of Test Static Segregation of Hardened SCC Cylinders

April 21, 2009

2

 

 

 

 

 

391

F. Burkart

Rotational Capacity Test for Long Bolts in Tension Calibrator

NEW ISSUE

2

 

 

 

 

 

392

F. Burkart

Rotational Capacity Test for Bolts too Short to Fit in Tension Calibrator

NEW ISSUE

2

 

 

 

 

 

401

C. Ouyang

Hydraulic Cements

October 21, 2014

2

 

 

App. A  Approved Sources-Portland & Blended Cements

MAPLE

2

 

 

App. B  Approved Sources-White Cement

MAPLE

2

 

 

 

 

 

402

C. Ouyang

Corrosion Inhibitors for Portland Cement Concrete

October 21, 2014

2

 

 

App. A  Approved Sources

MAPLE

2

 

 

 

 

 

403

C. Ouyang

Chemical Admixtures for Concrete

April 21, 2015

2

 

 

App. A  Air Entraining Admixtures

MAPLE

2

 

 

App. B  Retarding & Water Reducing Admixtures–Bridge Deck and Drilled Shafts

MAPLE

2

 

 

App. C  Water Reducing Admixtures

MAPLE

2

 

 

App. D  High Range Water Reducing Admixtures

MAPLE

2

 

 

App. E Non-Chloride Accelerating Admix.

MAPLE

2

 

 

App. F  Admixtures for Prestressed & Precast Concrete

MAPLE

2

 

 

App. G  Retarding & Water Reducing Admixtures, Pavement or Structural Concrete with Normal Working Times

MAPLE

2

 

 

 

 

 

405

J. Putherickal

White Pigmented Curing Compound in Bulk Storage

April 19, 2011

2

 

 

 

 

 

405.07

J. Putherickal

Clear Curing Compounds for Barrier Rails

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

409

B. Gossman

Source Approvals for Aggregates

April 21, 2015

4

 

 

App. A  Fine Aggregate

September 20, 2013

4

 

 

App. B  Coarse Aggregate, Crushed Stone

September 20, 2013

4

 

 

App. C  Coarse Aggregate, Gravel

September 20, 2013

4

 

 

App D  Source Approve for Revetment Stone

September 20, 2013

4

 

 

App E Temporary Aggregate Production Form

NEW ISSUE

4

 

 

 

 

 

410

M. Khoda

Repair of Damaged Hot Dip Galvanized Coatings

October 16, 2007

3

 

 

 

 

 

410.01

M. Khoda

Zinc Coatings on Iron, Steel and Fasteners

April 21, 2015

3

 

 

App. A  Approved List - Galvanizers

MAPLE

3

 

 

 

 

 

411

M. Khoda

Truncated Domes/Detectable Warning Systems

April 21, 2015

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

436.01

J. Putherickal

Inspection & Acceptance of Poured Joint Sealers

October 21, 2014

2

 

 

App. A  Approved Sources

MAPLE

2

 

 

 

 

 

436.02

J. Putherickal

Inspection & Acceptance of Elastomeric Joint Seals

October 21, 2014

2

 

 

App. A  Approved Sources

MAPLE

2

 

 

 

 

 

436.03

J. Putherickal

Inspection & Acceptance of Resilient Expansion Joint Filler

October 21, 2014

2

 

 

App. A  Approved Sources

MAPLE

2

 

 

 

 

 

436.04

J. Putherickal

Inspection & Acceptance of Backer Rod for Contraction Joints

October 21, 2014

2

 

 

App. A  Approved Sources for Cold-Pour Sealers

MAPLE

2

 

 

App. B  Approved Sources for Hot-Pour Sealers

MAPLE

2

 

 

 

 

 

436.05

J. Putherickal

Inspection & Acceptance of Flexible Foam Expansion Joint Fillers

October 21, 2014

2

 

 

App. A  Approved Sources

MAPLE

2

 

 

 

 

 

436.06

J. Putherickal

Inspection & Acceptance of Tire Buffings for Filling Expansion Joints

October 21, 2014

2

 

 

App. A  Approved Sources

MAPLE

2

 

 

 

 

 

437

S. Schram

Asphalt Binder, Cutback Asphalt & Emulsified Asphalt

April 21, 2015

2

 

 

App. A  Approved Sources, Asphalt Binder

MAPLE

2

 

 

App. B  Approved Sources, Cutback and Emulsified Asphalt

MAPLE

2

 

 

App. C  Asphalt Binder & Cutback Flowchart

April 30, 2002

2

 

 

App. D  Monitoring Guide - Asphalt Refineries and Terminals

October 15, 2013

2

 

 

 

 

 

438

S. Schram

High Performance Bituminous Premix

October 21, 2014

2

 

 

App. A  Questionnaire

October 18, 2005

2

 

 

App. B  Approved Brands

MAPLE

2

 

 

 

 

 

441

M. Khoda

Corrugated Metal Culvert Pipe

October 21, 2014

1

 

 

App. A  Approved Galvanizers

MAPLE

1

 

 

App. B  Approved Sources – Corrugated Metal Culvert Pipe

MAPLE

1

 

 

App. D  Approved Sources – Coated Corrugated Pipe

MAPLE

1

 

 

App. E  Aprons and End Sections

MAPLE

1

 

 

App. F  Job Report

April 17, 2012

1

 

 

 

 

 

441.01

M. Khoda

Coupling Devices

April 21, 2015

1

 

 

 

 

 

442

J. Putherickal

Inspection & Acceptance of Prefabricated Pavement Edge Drains (Fin Drains)

October 21, 2014

1

 

 

App. A  Approved Brands

MAPLE

1

 

 

 

 

 

442.01

J. Putherickal

Inspection & Acceptance of Prefabricated Vertical Drainage Wicks

April 21, 2015

1

 

 

App. A  Approved Brands

MAPLE

1

 

 

 

 

 

443

J. Putherickal

Corrugated Polyethylene Tubing

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

443.01

J. Putherickal

Rodent Guards

April 21, 2015

1

 

 

App. A  Approved Sources - Rodent Guards for Double-Walled Polyethylene Pipe

MAPLE

1

 

 

App. B Approved Sources - Rodent Guards for Corrugated Metal Pipe

MAPLE

1

 

 

 

 

 

443.02

M. Khoda

Safety Grates for Concrete Box Culverts

April 21, 2015

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

443.03

M. Khoda

Pipe Apron Guards

April 21, 2015

1

 

 

App. A Approved Sources – Apron Guards Precast Concrete Pipe

MAPLE

1

 

 

 

 

 

 

 

 

 

 

444

M. Khoda

Corrugated Zinc-Coated Steel Plates for Pipes & Arches

April 21, 2015

1

 

 

App. A  Approved Fabricators

MAPLE

1

 

 

 

 

 

445

M. Khoda

Precast Concrete

April 21, 2015

1

 

 

App. A  Monitor Inspection Checklist

April 15, 2008

1

 

 

App. B  Example of Summary Quantity Documentation

April 15, 2008

1

 

 

App. C  Minimum Requirements for Plant Documentation

October 17, 2006

1

 

 

App. D  Guidelines-Approving & Testing SCC Mix Designs

April 21, 2015

1

 

 

 

 

 

445.01

M. Khoda

Concrete Pipe & Special Sections

April 21, 2015

1

 

 

App. A  Approved Sources-Concrete Pipe

MAPLE

1

 

 

App. B  Approved Sources-Special Pipe

MAPLE

1

 

 

 

 

 

445.02

M. Khoda

Precast Box Culverts

April 21, 2015

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

445.03

M. Khoda

Mechanically-Stabilized Earth (MSE) Retaining Wall Panels

April 21, 2015

1

 

 

App. A  Approved Sources-Manufacturers

MAPLE

1

 

 

App. B  Approved Sources-Systems

MAPLE

1

 

 

 

 

 

445.04

M. Khoda

Concrete Segmental & Modular Blocks, Dry Cast

April 21, 2015

1

 

 

App. A  Approved Sources-Manufacturers

MAPLE

1

 

 

App. B  Approved Sources-Systems

MAPLE

1

 

 

 

 

 

445.05

M. Khoda

Concrete Segmental Blocks, Wet Cast

April 21, 2015

1

 

 

App. A  Approved Sources-Manufacturers

MAPLE

1

 

 

App. B  Approved Sources-Systems

MAPLE

1

 

 

 

 

 

445.06

M. Khoda

Precast Concrete Noise Walls

April 21, 2015

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

446

J. Putherickal

Plastic Pipe

April 21, 2015

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

447

C. Ouyang

Inspection & Acceptance of Packaged, Dry, Combined Materials for PC Concrete

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

448

J. Putherickal

Clay & Concrete Drain Tile

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

449.05

K. Frame

Inspection and Acceptance of Manhole Adjustment and Extension Rings

October 21, 2014

1

 

 

App. A  Approved Sources – Manhole Adjustment and Extension Rings

MAPLE

1

 

 

 

 

 

451

M. Khoda

Steel Reinforcement

April 21, 2015

1

 

 

App. B  Approved Suppliers/Distributors Bar Reinforcement

MAPLE

1

 

 

App. C  Approved Sources-Wire Mesh Reinf.

MAPLE

1

 

 

App. D  Approved US Manufacturers of Concrete Reinforcing Bars

MAPLE

1

 

 

App. E  Approved Suppliers of Mechanical Splices for Reinforcing Bars

April 21, 2015

1

 

 

App. F  Approved Suppliers/Distributors Warehouse Monitor Inspection Form

October 21, 2014

1

 

 

App. G  Guidelines for QC Procedures

April 20, 2010

1

 

 

App. I  Steel Reinforcing ID Report

October 18, 2011

1

 

 

 

 

 

451.01

J. Putherickal

Reinforcing Steel Supports

April 21, 2015

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

451.02

M. Khoda

Galvanized Steel Bars for Concrete Reinforcement

April 21, 2015

1

 

 

 

 

 

451.03B

M. Khoda

Epoxy-Coated Steel Reinforcement

April 21, 2015

1

 

 

App. A  Approved Sources – Epoxy Coated Bars

April 21, 2015

1

 

 

App. B  Approved Sources – Epoxy Powder Manufacturers

April 21, 2015

1

 

 

App. C  Approved Sources-Dowel Bar Basket Assemblies/Load Transfer Dowels

April 21, 2015

1

 

 

App. D  Warehouse Monitor Inspection Form

April 20, 2010

1

 

 

App. E  Approved Suppliers/Distributors/Fab. & Steel Reinforcing ID Report

April 21, 2015

1

 

 

 

 

 

452

M. Khoda

Deformed and Plain Stainless Steel Bars for Concrete Reinforcement

April 21, 2015

1

 

 

App. A  Approved US Manufacturers

MAPLE

1

 

 

App. B  Approved US Suppliers

MAPLE

1

 

 

 

 

 

453.04

K. Frame

Steel Castings (Carbon), Gray Iron Castings, And Ductile Iron Castings

October 21, 2014

1

 

 

App. A  Approved Suppliers-Iron Castings/ Drainage Castings

MAPLE

1

 

 

 

 

 

453.06B

K. Frame

High Strength / Non High Strength Fasteners

October 21, 2014

3

 

 

App. D  Approved Sources-High Str. Fasteners

MAPLE

3

 

 

App. E  Grade ID and Bolt Tensioning Req.

October 21, 2014

3

 

 

 

 

 

453.07

K. Frame

Stainless Steel Fasteners

October 21, 2014

3

 

 

App. A  Approved Sources-SS Fasteners

MAPLE

3

 

 

 

 

 

453.08

K. Frame

Anchor Bolts

October 21, 2014

3

 

 

App. A  Approved Fabricators and Suppliers

MAPLE

3

 

 

App. C  Approved Fabricators-Swedge Bolts

MAPLE

3

 

 

 

 

 

453.09

C. Ouyang

Concrete Anchors

April 21, 2015

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

453.10

K. Frame

Shear Connector Studs

October 21, 2014

3

 

 

App. A  Approved Sources

MAPLE

3

 

 

 

 

 

454.10

M. Khoda

Chain-Link Fence and Field Fence

April 21, 2015

1

 

 

App. A  Approved Sources Posts for Chain Link

MAPLE

1

 

 

App. B  Approved Suppliers Chain Link Fence Fittings

MAPLE

1

 

 

App. D  Approved Sources Zinc Coated Fabrics, Line Posts, Rails and Braces

MAPLE

1

 

 

App. E  Approved Suppliers Braces for Field Fences

MAPLE

1

 

 

 

 

 

455

J. Putherickal

Impact Attenuators

April 21, 2015

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

455.01

K. Jones

High Tension Cable Guardrail

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

455.02

K. Jones

Formed Steel Beam Railing, Cable Rail, Anchor Cable & Steel Post for Guardrail

April 21, 2015

1

 

 

App. A  Approved Brands-Formed Steel Beam Railing & End Terminal

MAPLE

1

 

 

 

 

 

462

C. Ouyang

Treated & Untreated Timber & Lumber

October 21, 2014

1

 

 

App. A  Approved Wood Treatment Plants

MAPLE

1

 

 

App. B  Approved Treated Wood Suppliers

MAPLE

1

 

 

App. C  Typical Quality Grade Marks

April 17, 2012

1

 

 

App. D  Wood Treatment Plant Requirements

April 17, 2012

1

 

 

App. E  Wood Sampling Instructions

April 15, 2014

1

 

 

App. F  Brands Used on Wood Products

April 17, 2007

1

 

 

 

 

 

467

K. Frame

Steel Piles

April 21, 2015

3

 

 

 

 

 

467.01

K. Frame

Steel H-Piles

April 21, 2015

3

 

 

App. A  Approved Rolling Mills

MAPLE

3

 

 

App. B  Approved Suppliers

MAPLE

3

 

 

App. C  Monitor Inspection Form

April 20, 2010

3

 

 

 

 

 

467.02

K. Frame

Steel Sheet Piling

April 21, 2015

3

 

 

App. A  Approved Rolling Mills

MAPLE

3

 

 

App. B  Approved Suppliers

MAPLE

3

 

 

App. C  Identification Report

October 18, 2011

3

 

 

 

 

 

467.03

K. Frame

Steel Pipe Piles

April 21, 2015

3

 

 

App. A  Approved Rolling Mills

MAPLE

3

 

 

App. B  Approved Suppliers

MAPLE

3

 

 

App. C  Monitor Inspection Form

April 20, 2010

3

 

 

 

 

 

468

K. Frame

Pile Points for Steel H-Piles

April 21, 2015

3

 

 

App. A  Approved Manufacturers & Suppliers

MAPLE

3

 

 

App. B  Identification Report

October 18, 2011

3

 

 

 

 

 

469.02

M. Serio

Inspection & Acceptance of Seed

April 21, 2015

1

 

 

App A  Seed Mixture Report & Certification Statement

April 21, 2015

1

 

 

App B  Seed Monitor Report

October 21, 2014

1

 

 

 

 

 

469.03

M. Serio

Inspection & Acceptance of Fertilizer

April 19, 2011

1

 

 

 

 

 

469.10

J. Putherickal

Erosion Control Products

October 21, 2014

1

 

 & K. Shirley

App. A  Approved Sources-Ditch and Slope Protection Mats

MAPLE

1

 

 

App. B  Approved Sources-Turf Reinforcement Mats

MAPLE

1

 

 

App. C  Approved Sources-Hydraulic Mulches

MAPLE

1

 

 

App. D  Approved Sources-Compost

MAPLE

1

 

 

App. E  Approved Sources-Perimeter & Slope Sediment Control Devices

MAPLE

1

 

 

App F  Approved Sources for Silt Curtains

MAPLE

1

 

 

 

 

 

470

J. Putherickal & K. Shirley

Inspection & Acceptance of Landscape Plant Materials

October 15, 2013

1

 

 

 

 

 

482.02

J. Putherickal

Inspection & Acceptance of Zinc-Rich Paints

October 21, 2014

3

 

 

App. A  Approved Sources - Solvent Borne, Inorganic, Zinc-Silicate Paints for Structural Steel

MAPLE

3

 

 

App. C  Approved Sources - Zinc Rich Epoxy Paints for Structural Steel

MAPLE

3

 

 

 

 

 

482.04

J. Putherickal

Inspection & Acceptance of Aluminum Epoxy Mastic Paints

October 21, 2014

3

 

 

App. A  Approved Producers & Products

MAPLE

3

 

 

 

 

 

482.05

J. Putherickal

Inspection & Acceptance of Waterborne Acrylic Paints

October 21, 2014

3

 

 

App. A  Approved Producers & Products

MAPLE

3

 

 

 

 

 

482.06

J. Putherickal

Inspection & Acceptance of Moisture-cured Polyurethane Paint Systems

October 21, 2014

3

 

 

App. A  Approved Producers & Products

MAPLE

3

 

 

 

 

 

482.07

J. Putherickal

Aliphatic Polyurethane Paints

October 21, 2014

3

 

 

App. A  Approved Sources

MAPLE

3

 

 

 

 

 

482.08

J. Putherickal

Inspection & Acceptance of Paint Systems for Galvanized Surfaces

October 21, 2014

3

 

 

App. A  Approved Sources

MAPLE

3

 

 

 

 

 

482.09

J. Putherickal

Inspection & Acceptance of Fluoropolymer Paint Systems

October 21, 2014

3

 

 

App. A  Fluoropolymer Paint System

MAPLE

3

 

 

 

 

 

483.03

J. Putherickal

Inspection & Acceptance of Traffic Paints for Construction Projects

October 21, 2014

1

 

 

App. A  Approved Sources-Fast Dry Waterborne Paint

MAPLE

1

 

 

App. B  Approved Sources-Fast Dry, VOC Compliant, Solvent Bourne Paint

MAPLE

1

 

 

App. C  Approved Sources-Fast Dry, High Build Waterborne Paint

MAPLE

1

 

 

App. D  Approved Sources-Low Temperature Waterborne Paint

MAPLE

1

 

 

 

 

 

483.04

J. Putherickal

Requirements & Acceptance of Durable Paint Pavement Markings

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

483.06

J. Putherickal

Pavement Marking Tapes

October 21, 2014

1

 

 

App. A  Prequalified Pavement Marking Tapes

MAPLE

1

 

 

 

 

 

483.07

J. Putherickal

Inspection & Acceptance of Raised Pavement Markers

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

483.08

J. Putherickal

Channelizer Markers

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

484

J. Putherickal

Inspection & Acceptance of Reflectorizing Spheres for Traffic Paint

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

485

K. Frame

Light Pole Bases

NEW ISSUE

3

 

 

 

 

 

485.10

J. Putherickal

Inspection & Acceptance of Rigid Steel Conduit

April 21, 2015

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

486

J. Putherickal

Inspection & Acceptance of Type A & B Sign Fabrication

April 17, 2012

1

 

 

App. A  Approved Sign Fabricators

April 17, 2012

1

 

 

App. B  Guidelines for Width of Letter Stroke

October 29, 2002

1

 

 

 

 

 

486.03

J. Putherickal

Inspection & Acceptance of Reflective Sheeting

October 21, 2014

1

 

& K. Shirley

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

486.06

J. Putherickal

Inspection & Acceptance of Modular Glare Screen Systems

October 21, 2014

1

 

 

App. A  Approved Brands

MAPLE

1

 

 

 

 

 

486.07

J. Putherickal & K. Shirley

Inspection & Acceptance of Prismatic Reflectors

October 21, 2014

1

 

 

App. A  Approved Brands

MAPLE

1

 

 

 

 

 

486.08

J. Putherickal & K. Shirley

Inspection & Acceptance of Guardrail Markers & Concrete Barrier Markers

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

486.10

K. Jones

Perforated Square Steel and Tube Post and Anchors

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

486.12

M. Bortle

Inspection & Acceptance of Solar Assisted Arrow Panels

October 21, 2014

1

 

 

App. A  Approved. Manufacturers & Brand Names

MAPLE

1

 

 

 

 

 

488.02

J. Putherickal

Inspection & Acceptance of Drums

October 21, 2014

1

 

& K. Shirley

App. A  Prequalified Drums

MAPLE

1

 

 

 

 

 

488.03

J. Putherickal

Inspection & Acceptance of Orange Mesh Safety Fence

October 21, 2014

1

 

 

App. A  Approved Brands

MAPLE

1

 

 

 

 

 

488.04

J. Putherickal

Inspection & Acceptance of 42-inch Channelizers

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

488.05

M. Bortle

Inspection & Acceptance Temporary Lane Separator System

October 21, 2014

1

 

 

App. A  Prequalified Systems

MAPLE

1

 

 

 

 

 

488.06

M. Bortle

Inspection & Acceptance of Temporary LED Floodlighting Luminaries

October 21, 2014

1

 

 

App. A  Approved Manufacturers

MAPLE

1

 

 

 

 

 

491.04

C. Ouyang

Inspection & Acceptance of Hydrated Lime

October 21, 2014

1

 

 

App. A  Approved Suppliers

MAPLE

1

 

 

 

 

 

491.08

C. Ouyang

Fast-Setting Repair Mortar for Structural Components

April 21, 2015

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

491.09

J. Putherickal

Inspection & Acceptance of Concrete Pipe Sealers

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

491.11

C. Ouyang

Inspection & Acceptance of Polymer Grouts

April 21, 2015

1

 

 

App. A  Approved Sources-Vertical Installation

MAPLE

1

 

 

App. B  Approved Sources-Horizontal Installation

MAPLE

1

 

 

App. C  Approved Sources-Pavement Patches

MAPLE

1

 

 

App. D  Approved Sources-Epoxies as Anchors

MAPLE

1

 

 

 

 

1

491.12

C. Ouyang

Concrete Sealers

October 21, 2014

1

 

 

App. A  Approved Sources-Non Traffic Areas

MAPLE

1

 

 

App. B  Approved Sources-Bridge Deck Areas

MAPLE

1

 

 

 

 

 

491.13

C. Ouyang

Nonshrink Hydraulic Cement Grouts

April 21, 2015

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

491.14

C. Ouyang

Inspection & Acceptance of Ground Granulated Blast Furnace Slag (GGBFS)

October 21, 2014

2

 

 

App. A  Approved Sources

MAPLE

2

 

 

 

 

 

491.15

C. Ouyang

Release Agents for Bituminous Materials

October 21, 2014

2

 

 

App. A  Approved Sources

MAPLE

2

 

 

 

 

 

491.16

S. Schram

Anti-strip Agents for Cutback Asphalt

October 21, 2014

2

 

 

App. A  Approved Sources

MAPLE

2

 

 

 

 

 

491.17

C. Ouyang

Fly Ash

April 21, 2015

2

 

 

App. A  Approved Certified Sources-Class C

MAPLE

2

 

 

App. B  Approved Sources-Undersealing

MAPLE

2

 

 

 

 

 

491.18

J. Putherickal

Inspection & Acceptance of Sealants for Traffic Loop Detectors

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

491.19

C. Ouyang

Inspection & Acceptance of Epoxy Resins

October 21, 2014

1

 

 

App. A  Approved Sources-Bridge Deck Repair

MAPLE

1

 

 

App. B  Approved Sources-Sealing Beams

MAPLE

1

 

 

 

 

 

491.20

C. Ouyang

Inspection & Acceptance of Rapid-Setting Concrete Patching Materials for Pavements

April 21, 2015

1

 

 

App. A  Approved Sources-Pavements

MAPLE

1

 

 

App. B  Approved Sources-Dowel Bar Retrofit

MAPLE

1

 

 

 

 

 

491.21

J. Putherickal

Inspection & Acceptance of Rock Salt for Ice Removal

April 20, 2004

1

 

 

 

 

 

491.22

C. Ouyang

Inspection & Acceptance of Threaded Insert Anchors

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

491.23

C. Ouyang

Inspection & Acceptance of Anti-Graffiti Coatings

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

491.24

C. Ouyang

Elastomeric Concrete for Concrete Repair

October 21, 2014

1

 

 

App. A  Approved Brands

MAPLE

1

 

 

 

 

 

491.25

C. Ouyang

Inspection and Acceptance of Fiber Reinforced Polymer Laminate Systems for Strengthening of Concrete Structures

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

491.26

J. Putherickal

Approval of Proprietary Winter Anti and De-icing Chemicals

April 15, 2014

1

 

 

App. A  Winter Chemical Certification Checklist

October 15, 2013

1

 

 

App. B  Approved Anti and De-icing Chemicals

April 17, 2012

1

 

 

 

 

 

494

J. Putherickal

Elastomeric Drainage Trough

October 21, 2014

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

495.03

J. Putherickal & K. Shirley

Inspection & Acceptance of Neoprene (Laminated, Homogeneous & Elastomeric) Bridge Bearing Pads

October 21, 2014

1

 

 

App. C  Approved Sources

MAPLE

1

 

 

 

 

 

496.01

J. Putherickal

Inspection & Acceptance of Engineering Fabric

October 21, 2014

1

 

& K. Shirley

App. A  Approved Sources-Silt Fencing

MAPLE

1

 

 

App. B  Approved Sources-Subsurface Drainage

MAPLE

1

 

 

App. C  Approved Sources-Embankment Erosion

MAPLE

1

 

 

App. D  Approved Sources-Asphalt Overlay

MAPLE

1

 

 

App. E  Approved Sources-Subgrade Polymer

MAPLE

1

 

 

App. F  Approved Sources-Fabric Formed

MAPLE

1

 

 

App. G  Approved Sources-Geo Textile

MAPLE

1

 

 

 

 

 

500

S. Schram

Asphaltic Terminology

October 19, 2010

2

 

 

 

 

 

501

S. Schram

Equations & Example Calculations

October 15, 2013

2

 

 

 

 

 

502

S. Schram

Approved Safety Edge Devices

October 16, 2012

2

 

 

 

 

 

504

S. Schram

Cold-In-Place Hot Mix Asphalt (HMA) Recycling

October 21, 2014

2

 

 

App. A  Mix Design-Foamed Asphalt

October 21, 2008

2

 

 

App. B  Mix Design-Engineered Emulsion

October 21, 2008

2

 

 

 

 

 

505

S. Schram

Reclaimed Asphalt Pavement for HMA Mixtures

April 21, 2015

2

 

 

App. A  RAP Stockpile Report

October 15, 2013

2

 

 

App. B  RAS Stockpile Report

October 18, 2011

2

 

 

 

 

 

506

S. Schram

Recycled Asphalt Shingle Suppliers

October 21, 2014

2

 

 

App. A  Approved Suppliers and Sources

MAPLE

2

 

 

App. B  RAS Source Approval Application

April 15, 2014

2

 

 

App. C  Unprocessed Shingles Cert. Form

October 19, 2010

2

 

 

App. D  Processed Shingles Cert. Form

October 19, 2010

2

 

 

App. E  Cert. Letter/Asbestos Containing Mtrl.

October 15, 2013

2

 

 

 

 

 

508

S. Schram

Hot Mix Asphalt (HMA) Plant Inspection

October 16, 2012

2

 

 

App. A  Asphaltic Concrete Equipment

April 20, 2004

2

 

 

App. B  Weighing Equipment

April 15, 2003

2

 

 

 

 

 

509

S. Schram

Tank Measurement & Asphalt Cement Content Determination

April 21, 2015

2

 

 

 

 

 

510

S. Schram

Method of Design of Hot Mix Asphalt Mixes

April 21, 2015

2

 

 

App. A  HMA Design Criteria

April 21, 2015

2

 

 

App. B  Determining Aggregate Correction for Fines Adhering to Coarse Aggregate

April 15, 2003

2

 

 

 

 

 

511

S. Schram

Control of Hot Mix Asphalt Mixtures

April 21, 2015

2

 

 

App. A  Table of Responsibility

October 17, 2006

2

 

 

App. B  Reheat Evaluation

April 18, 2006

2

 

 

App. C  Establishing a Correction Factor

April 18, 2006

2

 

 

App. D  Contractor’s QC & Testing Plan

October 21, 2008

2

 

 

 

 

 

512

S. Schram

Hot Mix Asphalt (HMA) Paving History

October 19, 2004

2

 

 

App. A  Asphalt Paving Histories

April 16, 2013

2

 

 

 

 

 

514

S. Schram

Correlation of Field Density For Hot Mix Asphalt (HMA) Paving

October 19, 2004

2

 

 

 

 

 

525

C. Ouyang

Designing Flowable Mortar

April 15, 2014

2

 

 

 

 

 

526

T. Hanson

Portland Cement Concrete Pavement History

April 16, 2013

2

 

 

 

 

 

527

T. Hanson

Paving Plant Inspection

April 21, 2015

2

 

 

App. A  Instructions for PCC Paving & Structural Reports

October 21, 2014

2

 

 

App. B  Example A

October 20, 2009

2

 

 

App. C  Plant Forms

April 20, 2010

2

 

 

App. D  Plant Calibration Checklist

October 15, 2013

2

 

 

 

 

 

528

T. Hanson

Structural Concrete Plant Inspection

April 15, 2014

2

 

 

 

 

 

529

T. Hanson

Portland Cement (PC) Concrete Proportions

October 21, 2014

2

 

 

 

 

 

530

T. Hanson

Quality Management & Acceptance of PC Concrete Pavement

April 21, 2015

2

 

 

App. A  QM-C Mix Adjustment Form

April 18, 2006

2

 

 

 

 

 

531

T. Hanson

Test Method For Combining Aggregate Gradations

April 16, 2013

2

 

 

 

 

 

532

T. Hanson

Aggregate Proportioning Guide for PC Concrete Pavement

October 18, 2011

2

 

 

App. A  Proportion & Production Limits for Aggregate

April 16, 2013

2

 

 

 

 

 

534

T. Hanson

Mobile Mixer Inspection

October 21, 2014

2

 

 

App. A  Calibration Form #820020

April 17, 2007

2

 

 

 

 

 

535

T. Hanson

PCC Plant Monitor

October 15, 2013

2

 

 

App. A  Paving Sampling & Testing Guide

October 21, 2014

2

 

 

App. B  Structural Sampling & Testing Guide

October 15, 2013

2

 

 

App. C  Non-Struct. & Misc. S&T Guide

April 16, 2013

2

 

 

 

 

 

540

M. Serio

Quality Management & Acceptance - Embankment Construction

April 15, 2014

2

 

 

 

 

 

545

M. Serio

Contractor Furnish Borrow

April 21, 2015

2

 

 

App. A  Proposed Borrow ID Form

April 21, 2015

2

 

 

App. B  Examples

April 15, 2014

2

 

 

 

 

 

557

K. Frame

Qualification of Steel Fabrication Shops & Plants

April 21, 2015

3

 

 

App. A  Approved Fabricators-Steel Bridge Cross Frames & Diaphragms

MAPLE

3

 

 

App. B  Approved Sources-Bridge Components & Misc. Items

MAPLE

3

 

 

App. C  Approved Fabricators-Traffic Signal Components, etc.

MAPLE

3

 

 

App. D  Approved Sources-Pedestrian Bridges

MAPLE

3

 

 

App. E  Pre-Fab. Meetings-Tower Lights, Light Poles, Sign Poles

October 15, 2013

3

 

 

App. F  Alum. Light Poles-Regular & Anodized

April 16, 2013

3

 

 

App. G  Modular Expansion Joint Assembly

October 15, 2013

3

 

 

App H  Paint over Galvanized Surface Travel Log

October 21, 2014

3

 

 

 

 

 

558

F. Burkart

Structural Field Welding & Inspection

April 21, 2015

3

 

 

App. A  Welding Requirements for Piling

April 20, 2004

3

 

 

App. B  Pile Extensions

April 19, 2005

3

 

 

 

 

 

559

F. Burkart

Qualification Tests for Shop Welding

April 21, 2015

3

 

 

 

 

 

560

F. Burkart

Qualification Tests for Field Welders

April 21, 2015

3

 

 

 

 

 

561

K. Frame

& F. Burkart

Shop Welding Inspection

April 21, 2015

3

 

 

 

 

 

562

K. Frame

& F. Burkart

Steel Fabrication Shop Materials Inspection

October 15, 2013

3

 

 

 

 

 

563

K. Frame

Steel Fabrication Plant Shop Inspection

October 15, 2013

3

 

& F. Burkart

App. A  Prefabrication Meetings

October 15, 2013

3

 

 

App. B  Fabrication Inspect. Shipment Release

April 17, 2012

3

 

 

 

 

 

564

K. Frame

& F. Burkart

Steel Fabrication Shop Design Inspection

April 16, 2013

3

 

 

 

 

 

565

K. Frame

& F. Burkart

Steel Fabrication Shop Documentation

April 21, 2015

3

 

 

 

 

 

566

F. Burkart

Aluminum Welding

April 16, 2013

3

 

 

 

 

 

567

J. Putherickal

Painting Inspection

April 15, 2014

3

 

 

 

 

 

568

J. Putherickal

Paint Shop / Powder Coating Requirements and Approval

April 21, 2015

3

 

 

App. A  Approved Paint Shops for Miscellaneous Steel Products

MAPLE

3

 

 

App. B  Approved Paint Shops for Structural Steels

MAPLE

3

 

 

App. C  Approved Powder Coating Shops

MAPLE

3

 

 

App. D  Approved Powder Manufacturers

MAPLE

3

 

 

App. E  Paint Over Galvanized Surface Travel Log

October 21, 2014

3

 

 

App. F  Preparation of Galvanized Surfaces

April 17, 2012

3

 

 

App. G Repair of Damaged Hot Dip Galvanized Coatings

NEW ISSUE

3

 

 

 

 

 

569

K. Frame

Method for Computing Structural Steel Weight (Mass)

NEW ISSUE

 

 

 

 

 

 

570

M. Khoda

Precast & Prestressed Concrete Bridge Units

April 21, 2015

1

 

 

App. A  Approved Fabricators

MAPLE

1

 

 

App. B  Repair Procedures and Guidelines

April 21, 2015

1

 

 

App. D  Cold Weather Placement

April 21, 2015

1

 

 

App. E  Casting Different Length Units (LRFD Beams Only)

April 21, 2015

1

 

 

App. E1  Casting Different Length Units (LX Beams Only)

April 21, 2015

 

 

 

App. F  Principal Factors in QC

April 21, 2015

1

 

 

App. G  Glossary of Terms

April 21, 2015

1

 

 

App. H  Optional Beam Seat Protection Plates (LX Beams Only)

April 21, 2015

1

 

 

App. H1  Optional Beam Seat Protection Plates (LRFD Beams Only)

April 21, 2015

 

 

 

 

 

 

571

M. Khoda

Plants for Production of Precast Concrete Barrier

April 21, 2015

1

 

 

App. A  Approved Sources

MAPLE

1

 

 

 

 

 

T101M

S. Schram

Aggregate Delivery Conversion Table (Metric Units)

October 18, 2005

2

 

 

 

 

 

T101C

S. Schram

Aggregate Delivery Conversion Table (Customary Units)

October 18, 2005

2

 

 

 

 

 

T102M

S. Schram

Temperature Volume Corrections for Asphaltic Materials (Metric Units)

October 16, 2012

2

 

 

 

 

 

T102C

S. Schram

Temperature Volume Corrections for Asphaltic Materials (Customary Units)

October 16, 2012

2

 

 

 

 

 

T103M

S. Schram

Temperature Volume Corrections for Asphaltic Materials (Metric Units)

October 16, 2012

2

 

 

 

 

 

T103C

S. Schram

Temperature Volume Corrections for Asphaltic Materials (Customary Units)

October 16, 2012

2

 

 

 

 

 

T104

S. Schram

Gauging Table for Horizontal Cylindrical Tanks

October 18, 2005

2

 

 

 

 

 

T105

S. Schram

Outage of Horizontal Cylindrical Tanks

October 18, 2005

2

 

 

 

 

 

T108

S. Schram

Table C1 Temperature Volume Corrections for Emulsified Asphalt

October 18, 2005

2

 

 

 

 

 

T108A

S. Schram

Temperature Volume Corrections for Diluted Emulsified Asphalt

October 18, 2005

2

 

 

 

 

 

T203

B. Gossman

General Aggregate Source Information

MAPLE

2

 

 

 

 

 

T214A

T. Hanson

Reciprocals for Batch Weight Calculations

April 16, 2013

2

 

 

 

 

 

T215A

C. Ouyang

W-W1 Table for Pycnometer Moisture Determination

April 16, 2013

2