The links listed below provide access to download the checklists of items for an appropriately completed project plan.
For V8i (SS10) workflow:
Checklists for V8i workflows are outdated and being replaced. Please refer to CONNECT workflow checklists for most current documentation.
- Preliminary Design Checklist - Bridge (08/01/21)
- Preliminary Design Checklist - RCB Culvert (08/01/21)
- Preliminary Design Checklist - Pipe Culvert (08/01/21)
- Preliminary Design Checklist - Noise Wall (08/01/21)
- Preliminary Design Checklist - Temporary Bridge(08/01/21)
For CONNECT workflow: