These links provide access to download the checklists of items for an appropriately completed project plan.
For CONNECT Workflow:
- Preliminary Design Checklist - Bridge (01/01/25)
- Preliminary Design Checklist - RCB Culvert (01/01/24)
- Preliminary Design Checklist - Drainage (08/01/22)
- Preliminary Design Checklist - Noise Wall (01/01/24)
- Preliminary Design Checklist - Temporary Bridge (01/01/24)
- Preliminary Design Checklist - Temporary Detour Pipes (01/01/24)
For CONNECT Workflow:
- Culvert Checklist (03/01/25)
- Bridge Checklist (03/01/25)
- CADD Checklist (03/01/25)