Model Name
|
Revision Date
|
File Description
|
MicroStation DGN File
|
PDF File
|
Culvert Extensions and Other Details
|
1043s1
|
01/21
|
Culvert Extension Details
|
|
|
1043s2
|
01/21
|
Culvert Extension Details
|
1044
|
01/21
|
Culvert Extension Details
|
1047
|
01/21
|
Culvert Details
|
1060
|
01/21
|
Culvert Baffle Details
|
1061
|
01/21
|
Culvert Weir Details
|
1070-03 - 1070-12
|
01/21
|
Flume Chute Details
|
1070-13, 1070-14
|
01/21
|
Flume Chute Details
|
1092
|
01/21
|
Cast-In-Place Culvert Revetment Protection Details
|
UPDATE NOTICE:
|
The newly released Flume Standards dated December 2020 should be used for any designs scheduled for the July 2021 letting and later. Exceptions will be considered on a case-by-case basis.
|
Flume standards
|
RCF 01-20
|
12/20
|
Reinforced Concrete Flumes
|
|
|
RCF 02-20
|
12/20
|
Reinforced Concrete Flumes
|
RCF 03-20
|
12/20
|
Reinforced Concrete Flumes
|
RCF 04-20
|
12/20
|
Reinforced Concrete Flumes
|
RCFB 01-20
|
12/20
|
Flume Basin Details 3'-0", 4'-0" & 5'-0" Spans
|
RCFB 02-20
|
12/20
|
Flume Basin Details 6'-0" Span
|
RCFB 03-20
|
12/20
|
Flume Basin Details 8'-0" Span
|
RCFB 04-20
|
12/20
|
Flume Basin Details 10'-0" Span
|
RCFB 05-20
|
12/20
|
Flume Basin Details 10'-0" Span
|
RCFB 06-20
|
12/20
|
Flume Basin Details 12'-0" Span
|
RCFB 07-20
|
12/20
|
Flume Basin Details 12'-0" Span
|
RCFB 08-20
|
12/20
|
Flume Basin Details 14'-0" Span
|
RCFB 09-20
|
12/20
|
Flume Basin Details 14'-0" Span
|
RCFB 10-20
|
12/20
|
Flume Basin Details 16'-0" Span
|
RCFB 11-20
|
12/20
|
Flume Basin Details 16'-0" Span
|
FBJ 01-12
|
12/20
|
3Flume Bell Joint Details 3'-0", 4'-0" & 5'-0" Spans
|
FBJ 02-20
|
12/20
|
Flume Bell Joint Details 6'-0" Spans
|
FBJ-03-20
|
12/20
|
Flume Bell Joint Details 8'-0" Spans
|
FBJ 04-20
|
12/20
|
Flume Bell Joint Details 10'-0" Spans
|
FBJ 05-20
|
12/20
|
Flume Bell Joint Details 12'-0" Spans
|
FBJ 06-20
|
12/20
|
Flume Bell Joint Details 14'-0" Spans
|
FBJ 07-20
|
12/20
|
Flume Bell Joint Details 14'-0" Spans
|
FBJ 08-20
|
12/20
|
Flume Bell Joint Details 16'-0" Spans
|
FBJ 09-20
|
12/20
|
Flume Bell Joint Details 16'-0" Spans
|
April 2012 Flume standards - outdated
|
RCF-01-12
|
05/13
|
Reinforced Concrete Flumes
|
|
|
RCF-02-12
|
04/12
|
Reinforced Concrete Flumes
|
RCFB-01-12
|
04/12
|
3 x 3 to 5 x 6 Flume Basin Details
|
RCFB-02-12
|
04/12
|
6 x 3 to 6 x 8 Flume Basin Details
|
RCFB-03-12
|
04/12
|
8 x 4 to 8 x 10 Flume Basin Details
|
RCFB-04-12,
RCFB-05-12
|
04/12
|
10 x 5 to 10 x 12 Flume Basin Details
|
RCFB-06-12,
RCFB-07-12
|
04/12
|
12 x 4 to 12 x 12 Flume Basin Details
|
FBJ-01-12
|
04/12
|
3 x 3 to 5 x 6 Flume Bell Joint Details
|
FBJ-02-12
|
04/12
|
6 x 3 to 6 x 8 Flume Bell Joint Details
|
FBJ-03-12
|
04/12
|
8 x 4 to 8 x 10 Flume Bell Joint Details
|
FBJ-04-12
|
04/12
|
10 x 5 to 10 x 12 Flume Bell Joint Details
|
FBJ-05-12
|
04/12
|
12 x 4 to 12 x 12 Flume Bell Joint Details
|
UPDATE NOTICE:
|
The newly released Cast-In-Place Culverts - Single Span RCB, Twin RCB and Triple RCB dated July 2020 are designed and supplied with the new Parallel Wing Headwalls. The intent of the Bureau is to use Parallel Wing Headwalls when feasible in order to provide relative parity between the CIP and Precast Culvert options. The use of these newly released CIP Culverts and Parallel Wing Headwall Standards should follow the guidelines below:
- For all new RCB Culvert projects and those just entering final design, if the TSL shows flared wing headwalls then the Final Designer should contact the Preliminary Designer and verify whether the Flared Wing Headwalls are mandatory for the specific project or if they can be changed to the new Parallel Wing Headwalls, as there could possibly be a scenario where the change may not be desirable. If it can be changed to Parallel Wing Headwalls, it should be.
- For RCB Culvert projects that are finished or have begun final design, no change is required when using the April 2012 standards. EXCEPTION: Any designs scheduled for the July 1, 2021 letting that are based on the April 2012 standards should be under consideration for re-design to the newly released July 2020 standards.
- The April 2012 Flared Wing Headwalls and CIP Culvert standards will still be available for Standards reference and e-Files on the
Culvert Standards page of the Bridges & Structures Bureau website for the next year.
- Please note that the bureau also intends to release the new Precast Culvert Standards for use by all, and the Flared Wing Headwall Standards for county use and special project use in the near future. An email notification through GovDelivery will be sent out when those are available on the website. For more immediate needs, please contact Brett Kloss to request an unofficial copy.
|
Single Span RCB
|
RCB G1-20
|
07/20
|
Index of Sheets
|
|
|
RCB G2-20
|
07/20
|
General Notes & Specifications
|
RCB G3-20
|
07/20
|
Typical Culvert Barrel Details
|
RCB 3-3-20
|
07/20
|
Culvert Barrel Details, 3’-0 Barrel Sections
|
RCB 4-4-20
|
07/20
|
Culvert Barrel Details, 4’-0 Barrel Sections
|
RCB 5-3-20 -
RCB 5-6-20
|
07/20
|
Culvert Barrel Details, 5’-0 Barrel Sections
|
RCB 6-3-20 -
RCB 6-8-20
|
07/20
|
Culvert Barrel Details, 6’-0 Barrel Sections
|
RCB 8-4-20 -
RCB 8-10-20
|
07/20
|
Culvert Barrel Details, 8’-0 Barrel Sections
|
RCB 10-4-20 -
RCB 10-12-20
|
07/20
|
Culvert Barrel Details, 10’-0 Barrel Sections
|
RCB 12-4-20 -
RCB 12-12-20
|
07/20
|
Culvert Barrel Details, 12’-0 Barrel Sections
|
RCB 14-4-20 -
RCB 14-14-20
|
07/20
|
Culvert Barrel Details, 14’-0 Barrel Sections
|
RCB 16-4-20 -
RCB 16-14-20
|
07/20
|
Culvert Barrel Details, 16’-0 Barrel Sections
|
PWH 0-1-20 -
PWH 0-11-20
|
07/20
|
Parallel Wing Headwalls,
0° Skew
|
PWH 15-1-20 -
PWH 15-11-20
|
07/20
|
Parallel Wing Headwalls,
15° Skew
|
PWH 30-1-20 -
PWH 30-11-20
|
07/20
|
Parallel Wing Headwalls,
30° Skew
|
PWH 45-1-20 -
PWH 45-11-20
|
07/20
|
Parallel Wing Headwalls,
45° Skew
|
CBJ 1-20
|
07/20
|
Culvert Bell Joints,
3’, 4’ & 5’ Spans
|
CBJ 2-20
|
07/20
|
Culvert Bell Joints,
6’ & 8’ Spans
|
CBJ 3-20
|
07/20
|
Culvert Bell Joints,
10’ & 12’ Spans
|
CBJ 4-20
|
07/20
|
Culvert Bell Joints,
14’ & 16’ Spans
|
CBJ 5-20
|
07/20
|
Culvert Bell Joints,
All Spans
|
Twin RCB
|
TWRCB G1-20
|
07/20
|
Index of Sheets
|
|
|
TWRCB G2-20
|
07/20
|
General Notes & Specifications
|
TWRCB G3-20
|
07/20
|
Typical Culvert Barrel Details
|
TWRCB 8-4-20 -
TWRCB 8-10-20
|
07/20
|
Culvert Barrel Details, 8’-0 Barrel Sections
|
TWRCB 10-4-20 -
TWRCB 10-12-20
|
07/20
|
Culvert Barrel Details, 10’-0 Barrel Sections
|
TWRCB 12-4-20 - TWRCB 12-12-20
|
07/20
|
Culvert Barrel Details, 12’-0 Barrel Sections
|
TWPWH 0-1-20 - TWPWH 0-8-20
|
07/20
|
Parallel Wing Headwalls, 0° Skew
|
TWPWH 15-1-20 - TWPWH 15-8-20
|
07/20
|
Parallel Wing Headwalls, 15° Skew
|
TWPWH 30-1-20 - TWPWH 30-8-20
|
07/20
|
Parallel Wing Headwalls, 30° Skew
|
TWPWH 45-1-20 - TWPWH 45-9-20
|
07/20
|
Parallel Wing Headwalls, 45° Skew
|
TWCBJ 1-20
|
07/20
|
Culvert Bell Joints, 8' Spans
|
TWCBJ 2-20
|
07/20
|
Culvert Bell Joints, 10' & 12' Spans
|
TWCBJ 3-20
|
07/20
|
Culvert Bell Joints, All Spans
|
Triple RCB
|
TRRCB-G1-20
|
07/20
|
Index of Sheets
|
|
|
TRRCB-G2-20
|
07/20
|
General Notes & Specifications
|
TRRCB-G3-20
|
07/20
|
Typical Culvert Barrel Details
|
TRRCB 10-4-20 -
TRRCB 10-12-20
|
07/20
|
Culvert Barrel Details, 10’-0 Barrel Sections
|
TRRCB 12-4-20 - TRRCB 12-12-20
|
07/20
|
Culvert Barrel Details, 12’-0 Barrel Sections
|
TRPWH 0-1-20 - TRPWH 0-7-20
|
07/20
|
Parallel Wing Headwalls, 0° Skew
|
TRPWH 15-1-20 - TRPWH 15-7-20
|
07/20
|
Parallel Wing Headwalls, 15° Skew
|
TRPWH 30-1-20 - TRPWH 30-7-20
|
07/20
|
Parallel Wing Headwalls, 30° Skew
|
TRPWH 45-1-20 - TRPWH 45-7-20
|
07/20
|
Parallel Wing Headwalls, 45° Skew
|
TRCBJ 1-20
|
07/20
|
Culvert Bell Joints, 10' Spans
|
TRCBJ 2-20
|
07/20
|
Culvert Bell Joints, 12' Spans
|
TRCBJ 3-20
|
07/20
|
Culvert Bell Joints, All Spans
|
April 2012 Culvert Standards - outdated
|
Single RCB
|
|
Single Reinforced Concrete Box Culvert Standards
|
|
|
Twin RCB
|
|
Twin Reinforced Concrete Box Culvert Standards
|
|
|
Triple RCB
|
|
Triple Reinforced Concrete Box Culvert Standards
|
|
|