Contracts

Current letting information

Highway lettings typically take place on the third Tuesday of each month. These lettings include interstate, primary and secondary road work, and maintenance projects.

Download letting documents

Prime contractor prequalifications

The Iowa DOT is now requiring online submittal of the Contractor’s Financial-Experience-Equipment Statement (Form 650004). The Form 650004 must be completed and submitted online from a computer, tablet or mobile device. You will be able to upload attachments and submit them with the form. Any other submittal format is not accepted.

To be prequalified to bid as a prime contractor on most work types, a contractor must submit via online a Contractor’s Financial-Experience-Equipment Statement (Form 650004) for review by the Department at least five calendar days prior to the scheduled letting date. Previously approved statements expire 18 calendar months from your financial year-end listed on the statement.

A current version of the Contractor’s Financial-Experience-Equipment Statement can be found by doing a search for Form 650004 in the Iowa DOT forms portal.

Please direct questions to DOT.Contracts@iowadot.us.

Effective with the January 20, 2021 project letting, some changes have been made to the Contractor’s Financial-Experience-Equipment Statement (Form 650004).

  • For a Compiled/Individually Prepared Statement, the maximum prequalification amount has increased from $200,000 to $400,000.
  • For a CPA Reviewed Statement, the maximum prequalification limit for an individual proposal has increased from $1,000,000 to $2,000,000.
  • The Authorization To Loan limit has increased from $500,000 to $1,000,000.

What We do

Contracts is the focal point where all pre-letting activities converge so contracting can take place for construction. We are also responsible for two major functions of the Iowa Department of Transportation:

  • Estimating and contract letting.
  • Bid review, monitoring and collusion detection.

Contracts
Iowa Department of Transportation
800 Lincoln Way
Ames, Iowa 50010
515-239-1414
dot.contracts@iowadot.us

Live Tabs

No current notices at this time.

I-380 Johnson/Linn Counties From 120th Street north to near US 30 and Wright Brothers Blvd. Interchange Informational and Constructability Meeting

Oct 24th, 2022, 1-3:30 PM

Location: Large Materials Conference Room at the Iowa Department of Transportation Central Complex at 800 Lincoln Way, Ames, Iowa.

The DOT will host an Informational and Constructability Meeting for the I-380 widening and Wright Brothers Blvd. Interchange project scheduled for the July 2024 letting. The intent of the meeting is to garner input on constructability and proposed construction schedule.


US 30 Benton County Informational Meeting for Model as the Controlling Document

Oct 17th, 2022, 10:30 AM -12:00 PM

Location: Large Materials Conference Room at the Iowa Department of Transportation Central Complex at 800 Lincoln Way, Ames, Iowa.

Online Teams Meeting: Click here to join the meeting
Meeting ID: 221 078 863 81
Passcode: Vmsj6W
Download Teams | Join on the web

The Design Bureau will host an Informational Meeting for the US 30 Benton County project scheduled for the November 15, 2022 letting. This project will be the first pilot for a highway project with the model as the controlling document. The intent of the meeting is to demonstrate the use of the software that will be used to access the information in the model and cover other features that will be available.

Presentation will be recorded and posted to BidX for this contract under downloads soon after advertisement.


I-74 Mississippi River Bridge Demo Design History Documents Links:

Demo Projects IM-074-1(210)5--13-82 and IM-074-1(214)5--13-82 are tentatively scheduled for the June 21, 2022 Letting.


Project: Iowa 9 over Mississippi River
Subject: Construction Advisory Team Meeting
Location: Teleconference / MS Teams
Date: September 22, 2021, 9:00am – Noon (CST)

Click here to join the meeting


I-80/1st Ave Diverging Diamond Interchange in Coralville Constructability-Staging Review Meeting
2021 AGC Informational Meeting
September 17, 2021, 10 AM- 12:30 PM

DOT Project 11-52-080-030

The purpose of the meeting is to go over staging plans and discuss constructability components.

This proposed Diverging Diamond Interchange project is anticipated to include:

  • staged construction to maintain I-80, 1st Avenue, and ramp traffic,
  • grade separated multi-use path (significant MSE walls with expected IFI ground improvement needs, path bridge, path culverts),
  • light-weight fill construction with MSE wall over gas pipes
  • ICN-DOT FO relocation tied to the project letting. C&G (for fiber relocation) and fiber relocation before certain other work may begin.
 

Project is proposed to let in August 2022.

EDP-0977(650)--7Y-29 For Information Only Plans

Project Name: Downtown/Riverfront Revitalization Project – Main and Jefferson Street Improvements
Project Location: Main Street -Angular Street to High Street, Jefferson Street-Central Avenue to Front Street
Letting Date: July 20, 2021

Contract Type: Completion Date
Completion Dates: Site 00- Main Street - May 1, 2023, Site 01- Jefferson Street – October 31, 2023
Bidding Type: Base Bid Plus Best Value Alternative per DS 15004
Division 1 – Main Street & Jefferson – Base Bid
Division 2 – Sewer Separation – Base Bid
Division 3 PCC Pavement Alternative
Division 4 HMA Pavement Alternative
Alternative Differential “D” = $331,086
Work Restrictions: None
Project Description: Main Street

  • Reconstruction Concrete Pavement, Concrete Sidewalk, Storm Sewer, Inlets, Lighting, Trees, Landscape Planters, Flow Through Planters, Engineered Soil, Planting Soil, Benches, Trash Receptacles - (Railroad Tracks – Court St.)
  • Hot-Mixed Asphalt Resurfacing & ADA Ramps Sidewalk, PCC Patching, PCC Trail, PCC Curb & Gutter, Sanitary Sewer, Storm Sewer, – (Angular – Railroad Tracks)
  • Hot-Mixed Asphalt Resurfacing & ADA Ramps Sidewalk– (Court St. – High St.) Jefferson Street
  • Reconstruction PCC Pavement, PCC Sidewalk, Pervious Pavers, Storm Sewer, Inlets, Lighting, Trees, Landscape Planters, PCC Stairs, Benches, Trash Receptacles - (Central – Front)

“For Information Only” plans are available for potential bidders to view at link below. Contract and documents for this package will be advertised on June 15, 2021. The Iowa DOT will not be fielding any questions related to these plans until after June 15th.

EDP-0977(650)--7Y-29 For Information Only Plans (183MB)


EDP-0977(653)--7Y-29 For Information Only Plans

Project Name: Downtown/Riverfront Revitalization Project – Riverfront Improvements
Project Location: Riverfront -Columbia Street Parking Lot – South Boat Docks Parking Lot
Letting Date: July 20, 2021

Contract Type: Completion Date
Completion Dates: Site 00- Whole Project - May 1, 2023
Bidding Type: Base Bid
Division 1 – Whole Project Work Restrictions: None
Project Description: Riverfront

  • Reconstruction HMA Parking Lots w/ Concrete Curb &Gutter
  • Greenspace, Concrete Sidewalk, PCC Seat Walls, Benches, Trash Receptacles
  • Shade Structure
  • Water Spray Pad
  • PCC Boat Ramps, Boat Docks, Dolphins in River for Cruise Ships Tie-up
  • Trees, Landscaping
 

“For Information Only” plans are available for potential bidders to view at link below. Contract and documents for this package will be advertised on June 15, 2021. The Iowa DOT will not be fielding any questions related to these plans until after June 15th.

EDP-0977(653)--7Y-29 For Information Only Plans (70MB)


CENTRAL IOWA WATER TRAILS DESIGN REVIEW MEETING
Project Number: EDP-PA26(001)--7Y-77
Proposed Letting: December 21, 2021

The Des Moines Area Metropolitan Planning Organization, along with its project partners, will host a contractor design review meeting for the first phase of the Central Iowa Water Trails Project in downtown Des Moines. The project includes the construction of a whitewater course downstream of the Scott Avenue dam, modifications to the Scott Avenue dam to enhance safety, water access enhancements, and improvements to park amenities at Scott Avenue, Prospect Park, Birdland Marina, and the Harriet Street boat access.

The design review meeting will be held on Wednesday, May 5, 2021 at 10:30 am. The meeting will be conducted virtually via Microsoft Teams. Any interested parties are invited to attend. The design team will present an overview of each project site, solicit input from contractors, and answer contractor questions. You may attend the virtual meeting through the following link:

Click here to join the meeting
Call-in number for audio only: +1 515-598-4967, passcode 388508895#

For information only plans of each site and special provisions are available from these links:
Preliminary information only plans (337MB)

Questions during the meeting are encouraged, but you may also submit questions or comments to the design team through the following link:
Design Review Questions Form

2020

For Information Only Plans Project IMX-280-8(169)8—02-82

Proposal 82-2808-169 is scheduled for a December 15,2020 letting. This contract requires coordination with the Illinois DOT Contract Number 64F78 which is currently advertised by the Illinois DOT for a November 2020 letting. These for information only plans/ not for construction are being posted so those bidding on the Illinois contract will have an idea of the coordinated work.

No questions will be answered on contract 82-2808-169 until it is advertised on November 17, 2020.

Plans (82-2808-169_FIO)
Plans (82-2808-182_C _FIO)


IM-029-3(190)53--13-78 (Tied Package) For Information Only Plans

I-29 in Council Bluffs from N of UPRR to 0.9 mi N of Ave G and I-480 from E of Missouri River to I-29

Letting Date: 2/2/2021

This project involves the reconstruction of the I-29 interchanges with 9th Avenue and Avenue G and the relocation of the I-480 interchange at 41st Street to 40th Street. NB and SB frontage roads along I-29 between 9th Avenue and Avenue G will be constructed. Access to West Broadway from I-480 will be reconfigured and portions of Dodge Riverside Drive and North 37th Street will be relocated. Also includes retaining walls, intermediate foundation improvements (IFI), barrier and guardrail, storm drainage, and detour pavement associated with maintaining traffic.

“For Information Only” plans are available for potential bidders to view at link below. Contract and documents for this package will be advertised on December 15, 2020. The Iowa DOT will not be fielding any questions related to these plans until after December 15th. A pre-bid meeting will be held on January 6, 2021.

Plans (78-0293-190_FIO)


I-80/I-380 INTERCHANGE PROJECT PRELIMINARY FOR INFORMATION ONLY PLANS
(April 2020 Update)

Purpose: Draft scheduling specification. Note, corrections to March 23, 2020 meeting documents were made to the Presentation and Meeting Notes files. Those files have been replaced below. Changes are noted on the first pages of each document.

Purpose: July 15, 2020 December 8, 2020 letting. Preliminary information, subject to change

(326) for information only plans
Preliminary information only plans (562MB)

I-80/I-380 INTERCHANGE PROJECT MARCH 23, 2020 ON-LINE ONLY MEETING


I-80/I-380 INTERCHANGE PROJECT
PRELIMINARY FOR INFORMATION ONLY PLANS

Purpose:July 15, 2020 December 8, 2020 letting preliminary information, subject to change

Preliminary for information only plans (277MB)


CHECK PLAN FOR INFORMATION, LOCUST ROAD IMPROVEMENTS, City of Decorah, Winneshiek County

Project Details: PCC Pavement – Replace, In the City of Decorah, on Locust Road From College Drive 0.87 Miles to Pine Crest Drive – PCC Pavement Replace – Bid Alternate: Pine Crest Drive to Highland Drive

Project Number: STBG-SWAP-1867(617)—SG-96
Proposed Letting: April 21, 2020

Brief Description: This project involves full reconstruction of Locust Road in Decorah, Iowa from College Drive north to Highland Drive. The project also includes storm water and drainage improvements to the entire corridor, and the addition of new sidewalk from College Drive north to Shady Lane Drive.  The Section from Pine Crest Drive to Highland Drive is a bid alternate and will be awarded if bids come within range of City estimate.

Plans are provided for information and comments only and are subject to change.  Please contact Jeremy Bril (cityengineer@decorahia.org) with any comments/questions.

Note: Large File ~77MB

 


I-80/I-380 INTERCHANGE PROJECT UPDATE MEETING
Purpose: July 2020 letting project staging overview and discussion with AGC of possible Sites and challenges

Friday October 4, 2019
Doors open at 12:30.
1:00 to 3:30 PM
DOT Materials Conference Rooms
800 Lincoln Way, Ames


2019

FREMONT COUNTY IA 2 OVERFLOW BRIDGE, CONSTRUCTIBILITY MEETING
June 3, 2019
Doors open at 1:00 PM
Meeting from 1:30 PM-3:30 PM
DOT East Materials Conference Room
800 Lincoln Way, Ames

6-3-19 Meeting Notes


Fremont County IA 2 Overflow Bridge, Informational Meeting
May 9, 2019
Doors open at 4:10 PM
4:30 start
DOT Materials Conference Rooms
800 Lincoln Way, Ames

Link to additional information
Iowa 2 Meeting Presentation
AGC Informational Meeting Notes


Attention iconER-029-1(122)0--06-36 Pottawattamie County I-29 Reconstruction Acceleration - Pre-Bid


I-80/I-380 PROJECT UPDATE MEETING


May 9, 2019
Doors open at 12:30.
1PM start.
DOT Materials Conference Rooms
800 Lincoln Way, Ames

Questions/comments from the informational meeting can be sent to linda.narigon@iowadot.gov through Tuesday 5/14/2019.

Link to draft agenda and additional information
Post Meeting Files


Attention iconConstructability Review Meeting Minutes for the Widening and bridge repair of I-80/I-35 over the Des Moines River.

Meeting minutes.


2018

Attention iconFebruary 14, 2018 AGC Meeting Documents

Download .zip folder (68MB)

Attention iconI-480/I-29/West Broadway Interchange Constructability Meeting Minutes

Meeting minutes.

Attention iconI-29 Sioux City Segment 2 Constructability Meeting Minutes

Meeting minutes.


2016

Attention iconCargo Preference Act – January 2016
The Cargo Preference Act (CPA) applies to equipment materials and commodities obtained using U.S. Government funds. When transported by ocean vessels, at least 50% of such items must be transported on privately owned United States-flag commercial vessels, if available.

The FHWA has determined the Cargo Preference Act (CPA) and the implementing regulations, 46 CFR Part 381, are applicable to the Federal-aid highway program. Therefore, the CPA requirements are effective for the Federal-aid highway program.


Iowa Contractors: Obtaining Your Railroad Crossing Information

 

Bidder Status form

 


2015

Bid Bond changes


2014

Disadvantaged Business Enterprise (DBE) good faith effort process

NOT FINDING WHAT YOU NEED? WE CAN HELP.