Ames, Iowa – May 28, 2024 – Tell us what you think about a planned bridge replacement on Iowa 5 over Walnut Creek in Marion County. (Event# 5946)

map of area for public input

Construction is scheduled to begin spring 2025.

Traffic will be detoured during construction. The proposed detour would follow Marion County Road T-17 and Iowa 92 to and from the junction of Iowa 5. Access to properties shall be maintained at all times.

Share Your Feedback

View Project Plans

For questions about the project or for free translation services, contact: 
Hector Torres-Cacho, Transportation Planner 
Iowa DOT District 5 Office, 205 E 227th St, Fairfield, Iowa 52556, 
Phone: 641-469-4007 or Email: hector.torres-cacho@iowadot.us

Favor de notificar la persona listado arriba si necesita información en otro idioma o si necesita un traductor. Se lo proporcionaremos sin costo a usted.

Iowa DOT ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964 and other nondiscrimination statutes. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact Iowa DOT Civil Rights at 515-239-1111 or by email at civil.rights@iowadot.us.