
Ames, Iowa – April 14, 2025 – Tell us what you think about the proposed bridge replacement of the Iowa 48 bridge over Red Oak Creek, 1.3 miles south of U.S. 34 in Montgomery County (Event # 6546).
Construction will take place starting in the spring of 2026 and be completed by the fall of 2026.
Traffic will be maintained at all times by staged construction and traffic shifts.
Share Your Input by Monday April 28
Learn about the project and share your input. You will need to provide your name and zip code before commenting.
For questions about the project or for free translation services, contact:
Scott Suhr, Transportation Planner
Iowa DOT District 4 Office
2210 E 7th Street, Atlantic, IA 50022
Phone: 712-243-7627
Email: scott.suhr@iowadot.us
Favor de notificar la persona listado arriba si necesita información en otro idioma o si necesita un traductor. Se lo proporcionaremos sin costo a usted.
Iowa DOT ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964 and other nondiscrimination statutes. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact Iowa DOT Civil Rights at 515-239-1111 or by email at civil.rights@iowadot.us.