CRESTON, Iowa – April 23, 2025 – If you travel on eastbound Interstate 80 west of Des Moines you need to be aware of an upcoming project that may slow down your trip, according to the Iowa Department of Transportation’s Creston construction office.
Eastbound I-80 between Grand Prairie Parkway (exit 118) and the West Mixmaster will be closed on the following nights so crews can shift lanes on the roadway for a new stage of bridge and pavement removals.
- Sunday, April 27 from 9 p.m. until 5 a.m. on Monday, April 28
- Monday, April 28 from 9 p.m. until 5 a.m. on Tuesday, April 29
- Tuesday, April 29 from 9 p.m. until 5 a.m. on Wednesday, April 30
When the roadway is closed, you will follow a marked detour route (see map) using Grand Prairie Parkway (exit 118) up to University Avenue, Jordan Creek Parkway, Westown Parkway, 50th Street, and I-80/I-35 (exit 124).
The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.
The latest traveler information is available anytime through our 511 system. Visit 511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or X (find links at https://iowadot.gov/511/511-social-media-sites); or download the free app to your mobile device.
It’s easy to subscribe to Your 511 and sign up to receive email/text alerts. Visit https://new.511ia.org/#login to sign up. For instructions and help with this feature, visit https://www.511ia.org/help/section/how-to-create-and-manage-a-511-account.html.
#
For general information about this project contact Jeff Huntsman, Creston construction office, at 641-782-4518 or Jeffrey.huntsman@iowadot.us.