AMES, Iowa – June 25, 2025 – Tell us what you think about the proposed bridge replacement on Iowa 16 over Sugar Creek in Lee County.
As part of this project, proposed improvements include:
- Remove and replace the existing bridge.
- Remove and replace guardrail.
- Construct slope protection under the bridge.
- Construct bridge edge drains.
Construction will take place starting in the spring of 2028 and be completed by the fall of 2028.
Traffic on Iowa 16 will be detoured during construction. The proposed detour is US 218/Iowa 27, County Road J40, and County Road W55.
Share Your Feedback by July 8
Learn about the project and share your feedback. You will need to provide your name and zip code before viewing the information.
For questions about the project or for free translation services, contact:
Chris Kukla, Transportation Planner
Iowa DOT District 5 Office
205 E 227th St, Fairfield, Iowa 52556,
Phone: 641-469-4007
Email: christopher.kukla@iowadot.us
Favor de notificar la persona listado arriba si necesita información en otro idioma o si necesita un traductor. Se lo proporcionaremos sin costo a usted.
#
Iowa DOT ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964 and other nondiscrimination statutes. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact Iowa DOT Civil Rights at 515-239-1111 or by email at civil.rights@iowadot.us.