MARSHALLTOWN, Iowa – Sept. 3, 2025 – If you drive on Iowa 8 between Traer and Dysart you need to be aware of the upcoming closure of Iowa 8 that may slow down your trip, according to the Iowa Department of Transportation’s Marshalltown construction office.
Beginning at 7 a.m. on Tuesday, Sept. 9, through Friday, Oct.10, weather permitting, crews will close Iowa 8 from U.S. 63 to Iowa 21. While the roadway is closed, you will follow a marked detour route that uses U.S.63, Tama County Road D-65, and Iowa 21.
A roadway pipe will be replaced just east of the intersection with Tama County Road V-18 which will not permit through traffic. Local traffic will still have access on Iowa 8 leading up to the full closure of the roadway.
The Iowa DOT reminds motorists to drive with caution, obey the posted speed limit and other signs in the work area, and be aware that traffic fines for moving violations are at least double in work zones. As in all work zones, drivers should stay alert, allow ample space between vehicles, and wear seat belts.
The latest traveler information is available anytime through our 511 system. Visit 511ia.org; call 511 (within Iowa) or 800-288-1047 (nationwide); stay connected with 511 on Facebook or X (find links at https://iowadot.gov/travel-tools/iowa-511/511-social-media-sites); or download the free app to your mobile device.
It’s easy to subscribe to Your 511 and sign up to receive email/text alerts. Visit https://new.511ia.org/#login to sign up. For instructions and help with this feature, visit https://www.511ia.org/help/section/how-to-create-and-manage-a-511-account.html.
#
For general information about this project, contact Dustin Skogerboe, Iowa DOT Marshalltown construction office, at 641-752-4657 or dustin.skogerboe@iowadot.us.
1308 Iowa Ave. W.
Marshalltown, IA 50158