AMES, Iowa – April 30, 2026 – Tell us what you think about the proposed culvert replacement on Iowa 224 over East Burr Oak Creek, 0.1 miles south of North 75th Avenue East in Jasper County.
Improvements include:
- Replacing the existing 10’ x 7’ culvert with a 16’ x 10’ concrete box culvert
- Roadway work adjacent to the new culvert
Construction will take place in either the fall of 2026 or in the spring of 2027. The contract is being written to allow the selected contractor flexibility for the timing of the improvements. Iowa 224 will be open over the winter months.
During the construction period, Iowa 224 will be closed to traffic and there will be a detour. The proposed detour would follow County Roads F-27, T-38, and F-17. Access to properties in the construction area shall be maintained at all times.
Project Display
Share Your Feedback by May 11
Learn about the project and share your feedback. You will need to provide your name and email before commenting.
For questions about the project or for free translation services, contact:
Shelby Ebel, Transportation Planner
Iowa DOT District 1 Office
1020 S. Fourth St., Ames, IA, 50010
Phone: 855-925-2801, use the extension 2496 or Email: y76651@publicinput.com
Favor de notificar la persona listado arriba si necesita información en otro idioma o si necesita un traductor. Se lo proporcionaremos sin costo a usted.
#
Iowa DOT ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964 and other nondiscrimination statutes. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact Iowa DOT Civil Rights at 515-239-1111 or by email at civil.rights@iowadot.us.