AMES, Iowa – June 24, 2026 – Tell us what you think about proposed improvements at the U.S. 75 & C-80 and U.S. 75 & C-70 intersections near Sioux City and James.
Changes include construction of reduced conflict intersections at both intersection locations.
During the reconstruction of the intersections, localized detours will be used. Construction is expected to start spring of 2027 and be completed by the end of 2027.
Attend Open House to Share Your Feedback
When: Monday, June 29, 2026, anytime between 5 and 7 p.m.
Location: Iowa DOT District 3 Office Large Conference Room, 6409 Gordon Drive, Sioux City, Iowa 51106
Description: You will be provided with information about the project, and you can talk through your ideas with our staff. There will be no formal presentation. The meeting space is accessible for people with disabilities. If you require more support at the meeting, please notify the contact listed below by Friday, June 26, 2026.
Project Plans and Documents
Share Your Feedback by July 13
Learn about the project and share your feedback. You will need to provide your name and email before commenting.
For questions about the project or for free translation services, contact:
Sarah Tracy, P.E., Transportation Planner
Iowa DOT District 3 Office, 6409 Gordon Drive, Sioux City, Iowa 51106,
Phone: 855-925-2801, use the project code 6218
Email: f30750@publicinput.com
Favor de notificar la persona listado arriba si necesita información en otro idioma o si necesita un traductor. Se lo proporcionaremos sin costo a usted.
#
Iowa DOT ensures nondiscrimination and equal employment in all programs and activities in accordance with Title VI and Title VII of the Civil Rights Act of 1964 and other nondiscrimination statutes. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact Iowa DOT Civil Rights at 515-239-1111 or by email at civil.rights@iowadot.us.