Table of Contents
Content Information
On this page...
On projects where interchanges will be constructed at existing or proposed county roads, the same design criteria used for rural two-lane highways (non-NHS) should be used for the county road between the ramp terminals. Section 1C-1 summarizes these criteria.
Back to top